Drilling Commences at El Aguila High Grade Au Ag Project
Released
Released
Announcement PDF
ASX Announcement
Battery Age Minerals Ltd
ASX: BM8
ACN 085 905 997
batteryageminerals.au
T: +61 (8) 6109 6689
E: info@batteryage.au
Level 50, 108 St Georges Terrace
Perth, WA 6000
PO Box 7310, Cloisters Square Po, WA 6850 1
Released 11 November 2025
Drilling Commences at El Aguila High-
Grade Gold–Silver Project, Argentina
HIGHLIGHTS
• Drilling Underway – Maiden reverse-circulation (RC) program now underway at El Aguila
following receipt of full environmental approvals
• Experienced Local Contractor Appointed – MD Perforaciones (Macizo del Deseado
Perforaciones S.A.) engaged to deliver the initial RC campaign within the Deseado Massif
gold-silver belt.
• Full Environmental Impact Assessment (EIA) Approval Granted – Santa Cruz Mining
Ministry issues final authorisation, completing all regulatory requirements for drilling
campaign.
• Program Objectives – 1) Define known mineralisation via infill drilling at Aguila Main; 2)
Test strike and depth extensions of known mineralised trends; 3) Evaluate new structural
and geophysical targets at Verbena and Aguila South.
• Exceptional Gold and Silver Grades – Over 100 high-grade surface samples recorded,
including1
:
o 174.6 g/t Au and 327 g/t Ag (Aguila South #103036)
o 44.2 g/t Au and 4,739 g/t Ag (Aguila Main #110)
o 55.9 g/t Au and 61 g/t Ag (Aguila South #103041)
• Outstanding Historical Drilling Results – Multiple high-grade Au-Ag intersections
confirm near-surface potential, including1
:
o 0.55 m @ 40.55 g/t Au and 107 g/t Ag (DDA-08)
o 7.00 m @ 2.48 g/t Au incl. 1.7 m @ 9.02 g/t Au (DDA-25)
o 3.00 m @ 5.97 g/t Au (DDA-34)
• Strong Provincial and Local Support – Ongoing collaboration with Santa Cruz
authorities and landholders ensures smooth and responsible project execution.
Battery Age Minerals Ltd (ASX: BM8; “Battery Age” or “the Company”) is pleased to advise
that drilling has officially commenced at its El Aguila Gold–Silver Project in Santa Cruz
Province, Argentina.
This major milestone follows the granting of full Environmental Impact Assessment (EIA)
approval by the provincial authorities, marking the completion of all environmental and
operational authorisations required to advance the Project to its first drilling phase.
ASX Announcement
Released 11 November 2025 2
The maiden RC program is being executed by MD Perforaciones (Macizo del Deseado
Perforaciones S.A.), one of Patagonia’s most experienced drilling contractors. Drilling
commenced this week at Aguila Main, where historical trenching and sampling have defined
multiple sub-vertical quartz–sulphide veins extending over a kilometre of strike.
Figure 1: El Aguila – located in the rich gold and silver mining region of Santa Cruz. Proximal to large scale
operating Au and Ag mines.
Program Overview - Advancing Toward Resource Definition and Discovery
Growth
Battery Age’s integrated exploration model, incorporating 2,238 soil samples, 327 line-km of
ground magnetics, and 58 line-km of gradient IP/resistivity, has defined a robust pipeline of
gold–silver targets across the 91 km² El Aguila Project.
The current RC program has been strategically designed to:
• Test known gold–silver mineralisation through focused infill drilling;
• Test strike continuity and depth extensions for future potential resource growth;
• Test high-priority blue-sky targets to demonstrate district-scale potential.
Initial holes at Aguila Main will test multiple near-surface vein sets mapped in detail by recent
geophysical and structural interpretation with surface assays up to 174.6 g/t Au and 4,739 g/t
Ag. Subsequent step-out drilling will focus on Aguila South and Verbena, where coincident
chargeability anomalies, magnetic lows and high-grade surface geochemistry suggest
concealed mineralised structures.
All field logistics, environmental monitoring systems and communication infrastructure are in
place. Samples will be dispatched to ALS Global (Mendoza) for preparation and analysis under
BM8’s QA/QC protocols.
ASX Announcement
Released 11 November 2025 3
Figure 2: El Aguila project geology. Kilometre scale interpreted mineralised veins and drilling targets.
Exceptional Gold and Silver Grades Confirm District Potential
Historical exploration confirms high-grade mineralisation across multiple prospects:
Highlight drilling intercepts
• 0.55 m @ 40.55 g/t Au & 107 g/t Ag (DDA-08)
• 7.00 m @ 2.48 g/t Au incl. 1.7 m @ 9.02 g/t Au (DDA-25)
• 3.00 m @ 5.97 g/t Au (DDA-34)
• 22.00 m @ 0.94 g/t Au & 62 g/t Ag (CRC-01)
Highlight surface samples
• 174.6 g/t Au & 327 g/t Ag (Aguila South #103036)
• 44.2 g/t Au & 4,739 g/t Ag (Aguila Main #110)
• 55.9 g/t Au & 61 g/t Ag (Aguila South #103041)
These results, together with the new geophysical and geochemical datasets, highlight the
significant potential for large-scale, high-grade epithermal gold–silver systems across the
broader project area.
ASX Announcement
Released 11 November 2025 4
Battery Age CEO, Nigel Broomham, commented:
“The start of drilling at El Aguila marks a defining milestone for Battery Age and our Argentina
operations. With approvals finalised and the rig turning, we have transitioned from planning
into execution.
The efficiency with which the EIA approval and mobilisation were achieved reflects the
constructive and collaborative approach of the Santa Cruz authorities and our local partners.
Their support has enabled us to move seamlessly into drilling.
This program is designed to deliver tangible outcomes testing known high-grade mineralisation
at Aguila Main and the first systematic test of several untested high-priority structures.
El Aguila provides a high-impact growth lever alongside our cornerstone Germanium–Gallium
portfolio in Europe and North America. While we remain focused on building our strategic
critical-metals business, the addition of a high-grade gold–silver project in a proven district
offers immediate and complementary value creation for shareholders.”
Table 1: Assay highlights of the prior drilling completed at the El Aguila Property (ref announcement 31/01/2025)
Table 2: Assay highlights rock-chip sampling completed at the El Aguila Property (ref announcement 31/01/2025).
ASX Announcement
Released 11 November 2025 5
Next Steps
• Drilling now underway; first phase (~2,000-3,000m RC) expected to take 4–6 weeks.
• Progressive dispatch of samples to ALS Mendoza.
• Follow-up diamond drilling program to be planned and permitted based on early
results.
References
1. ASX Release, Battery Age, Battery Age to Acquire Majority Interest in High-Grade El Aguila Gold & Silver
Project in Argentina, 31 January 2025.
2. ASX Release, Battery Age, Battery Age Defines Multiple Kilometre Scale Gold-Silver Priority Drill Targets at El
Aguila Project, Argentina, 5 September 2025.
[ENDS]
Release authorised by the Board of Battery Age Minerals Ltd.
Contacts
Investors / Shareholders
Nigel Broomham
Chief Executive Officer
P: +61 (0)8 6109 6689
E: info@batteryage.au
Media
Kelly-Jo Fry
Battery Age Minerals
P: +61 (0)8 6109 6689
E: kjfry@batteryage.au
Compliance Statement
This report contains information on the El Aguila Project extracted from an ASX market announcements dated 31
January 2025, 28 May 2025 and 5 September 2025 released by the Company and reported in accordance with the
2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”
(JORC Code). The original market announcement is available to view on www.batteryage.au and www.asx.com.au.
Battery Age is not aware of any new information or data that materially affects the information included in the original
market announcement.
Forward-Looking Statement
This announcement may contain certain forward-looking statements and projections. Such forward looking
statements/projections are estimates for discussion purposes only and should not be relied upon. Forward looking
statements/projections are inherently uncertain and may therefore differ materially from results ultimately achieved.
Battery Age Minerals Limited does not make any representations and provides no warranties concerning the
accuracy of the projections and disclaims any obligation to update or revise any forward-looking statements/projects
based on new information, future events or otherwise except to the extent required by applicable laws. While the
information contained in this report has been prepared in good faith, neither Battery Age Minerals Limited or any of
its directors, officers, agents, employees or advisors give any representation or warranty, express or implied, as to
the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this
announcement.
Share your feedback
Discover