December 2023 Quarterly Activities Report
Summary
Battery Age Minerals Ltd (ASX: BM8, “Battery Age”, or the “Company”) is pleased to provide
the following summary of activities undertaken during the quarter ending 31 December 2023
(“December Quarter”).
Key highlights:
•
Summer exploration program successfully completed at the Falcon Lake
Lithium Project in Ontario, Canada, resulting in the identification of 30 highpriority drill targets across a 5km prospective lithium corridor.
•
Secondary Drilling Permit approved, enabling Phase 2 exploration drilling to be
undertaken across the highly prospective 5km corridor at Falcon Lake.
•
Phase 2 drilling commenced at Falcon Lake with key outcomes including:
o
•
Multiple high-grade assay results received from recent drilling at Falcon
East Extension, confirming the presence of significant lithium
mineralisation from surface:
9,286m drilled since drilling operations commenced in June 2023
including 1,905m completed in the December Quarter.
Multiple significant intercepts over 20m down-hole drilled during
the December Quarter including 20.65 metres @ 1.48% Li2O from
66.6m down-hole in 23FL-081.
Strategic acquisition of Falcon Extension property expands the exploration
potential at Falcon Lake:
o
Amalgamation of the Falcon Main and Falcon North properties through
acquisition of adjacent extensional properties adds 20km2 of highly
prospective exploration ground to the Falcon Lake project package
totalling 51km2.
•
The Company received a total of CAD$200,000 under the Ontario Junior
Explorer Program (OJEP) grant funding scheme.
•
Discussions significantly progressed with governmental organisations in
Austria to progress works on the Bleiberg Zinc-Lead-Germanium Project and
BM8 Austrian entity Battery Age Minerals GmbH established.
Battery Age Minerals Ltd
ASX: BM8
ACN 085 905 997
batteryageminerals.au
T: +61 (8) 6109 6689
E: info@batteryage.au
Level 50, 108 St Georges Terrace
Perth, WA 6000
PO Box 7310, Cloisters Square PO, WA 6850
1
Project Activities
Falcon Lake Lithium Project (Ontario, Canada)
Rapid progress has been achieved at the Falcon Lake Lithium Project since the
commencement of in field exploration activities in June 2023.
Figure 1 – Falcon Lake achievements to date.
The Company’s Phase 1 drill programme was completed in the September Quarter with
more than 7,000m safely drilled by Rodren Drilling with support from Battery Age exploration
personnel as well as geological support from Coast Mountain Geological.
On completion of the Company’s maiden drill program, the strategic acquisition of the Falcon
Extension property expanded the exploration potential at Falcon Lake Project through the
consolidation of the Falcon Main and Falcon North properties, adding ~20km2 of highly
prospective exploration ground.
The Falcon Lake Project now comprises a total land package of ~51km2 (refer to ASX
announcement 10 October 2023 for further details and transaction terms).
ASX Announcement
Released Released 25 January 2024
2
Figure 2 – Acquired Falcon Extension shown in blue outline adjacent to Falcon Main and Falcon North with
mapped pegmatites in yellow.
Following a brief pause during the hunting season to respect the wishes of the Company’s
First Nations partners, Battery Age remobilised personnel to Falcon Lake to commence
Phase 2 drilling.
Battery Age was pleased to announce during the Quarter that this drilling programme would
be carried out by the newly formed Rodren Drilling Whitesand First Nation Joint Venture, a
JV between the Company’s incumbent drilling contractor, Rodren, and one of the local First
Nation groups, Whitesand.
The 10,000m – 20,000m program re-commenced at the recently discovered step-out zone at
Falcon East and is designed to test new pegmatite discoveries within over 30 high-priority
targets generated from the results of the summer field work programme.
ASX Announcement
Released Released 25 January 2024
3
Figure 3 – Plan view of Falcon Lake drilled holes and future targets across the 5km prospective Corridor at Falcon
Lake.
An additional 1,905m of drilling was completed in the December Quarter bringing the total
metres drilled in 2023 to 9,286m, all since mobilising in June 2023. Significant intercepts
received from the Phase 2 drilling have reinforced the potential for scale at Falcon Lake with
multiple high-grade assay results received from Falcon East Extension, confirming the
presence of significant lithium mineralisation from surface.
Falcon East Extension is the first of the 30+ targets generated from the 2023 summer field
campaign at Falcon Lake to be drill tested and has emerged as a priority focus for drilling in
2024, with shallow mineralisation confirmed at the first of 30 targets to be tested as part of
the Phase 2 drilling program.
The results cap off a very busy year for the exploration team at Falcon Lake, with significant
results generated in a short space of time since mobilising the team in June this year. Drilling
has paused over the holiday season with the re-commencement of drilling operations
currently in the planning stages.
ASX Announcement
Released Released 25 January 2024
4
Hole
23FL-031
23FL-005
23FL-001
23FL-059
23FL-002
23FL-004
23FL-081
23FL-072
23FL-067
23FL-076
23FL-077
23FL-061
23FL-071
23FL-058
23FL-030
23FL-024
23FL-075
23FL-020
23FL-065
23FL-002
23FL-018
23FL-082
23FL-033
23FL-023
23FL-060
23FL-063
23FL-018
23FL-017
23FL-069
23FL-047
23FL-070
From_m
14.65
46.3
16.65
19.65
62
5.7
66.6
48.8
28.5
1.75
37.8
11.95
46.8
11.1
3.7
5.4
26.7
22.05
26.6
7.5
3.6
91.55
57.03
56.05
23.85
10.65
13.75
23.2
32.7
77.7
38.2
To_m
46.4
76.05
44.25
47
86
27.62
87.25
69
47.6
20.7
56.25
30
64
27
18.4
18.75
39.6
33.5
37.75
16.2
12.25
99.45
64.5
63.21
31
17
19.8
29.09
38.3
83.2
43.4
Interval_m
31.75
29.75
27.6
27.45
24
21.9
20.65
20.2
19.1
18.95
18.45
18.05
17.2
15.9
14.7
13.35
12.9
11.45
11.15
8.7
8.65
7.9
7.47
7.16
7.15
6.35
6.05
5.89
5.6
5.5
5.2
Li2O (%)
1.45
0.81
1.37
0.83
0.32
1.44
1.48
0.58
1.34
1.65
1.40
1.02
0.92
0.95
1.5
1.5
1.36
1.33
1.05
1.24
2.04
1.40
1.02
1.63
1.06
1.06
1.23
1.23
1.27
0.73
1.75
Table 1 – Significant 2023 drill intercepts including December Quarter highlights in blue (refer ASX announcement
13 December 2023).
ASX Announcement
Released Released 25 January 2024
5
Figure 4 – Simplified plan & cross-sections from recent Phase II drilling at Falcon Lake.
Battery Age continued its baseline fieldwork program at the Falcon Lake Lithium Project in
Canada, with Wabadowgang Noopming Management conducting baseline terrestrial and
fisheries field programs as part of the assessment process.
The Company is committed to adhering to best practices in environmental stewardship and
ensuring the preservation of the natural ecosystems surrounding Falcon Lake.
Jesse Lake Lithium Project (Ontario, Canada)
No exploration activities were conducted during the December Quarter
Bleiberg Project (Bad Bleiberg, Austria)
As previously announced, following early desktop assessments, the Company identified a
trend hosting potential extensions of the mineralisation to the west north-west of the old
Bleiberg mine workings and expanded the Company’s land position by pegging additional
exploration licences. This land is 100%-owned.
ASX Announcement
Released Released 25 January 2024
6
Figure 3 –100% staked claims identified in blue and existing earn-in claims shown in red.
Battery Age has progressed discussions significantly with Austrian regulatory bodies during
the December quarter regarding working together collaboratively to further progress the
Bleiberg Project and expects to be able to commence exploration activities during 2024.
The Company’s project claims are located adjacent to the historical Bleiberg mine, which has
some of the world’s highest reported Germanium grades (200g/t) as well as proven Gallium
mineralisation (90-110g/t).
Tidili Project (Tidili, Morocco)
Following on from the encouraging assay results reported from surface samples collected at
the 85%-owned Tidili Copper Project in Morocco in April, Battery Age management have
completed drill program planning activities prior to final approval of the Company’s maiden
drill campaign at Tidili.
ASX Announcement
Released Released 25 January 2024
7
Figure 4 – Tidili Landscape as surveyed by Dr Simon Dorling.
King Tut Project (Argentina)
No exploration activities were conducted during the December Quarter.
Bloom Lake Project (Bloom Lake, Canada)
No exploration activities were conducted during the December Quarter.
Corporate Activities
Mr Nigel Broomham, the Company’s General Manager of Exploration, was appointed Interim
CEO in November, following the resignation of Mr Gerard O’Donovan as Managing Director
and Chief Executive Officer.
It was noted at the time that Mr O’Donovan held 1,000,000 unlisted performance rights which
immediately lapsed upon his resignation pursuant to their terms and conditions. Additionally,
in light of Mr O’Donovan’s resignation, the Directors resolved to withdraw resolutions 6 & 7
referred to in the Notice of Annual General Meeting (AGM) released to the ASX on 26
October 2023:
ASX Announcement
Released Released 25 January 2024
8
During the Quarter, the Company received the maximum available grant of CAD$200,000
under the Ontario Junior Explorer Program (OJEP) grant funding scheme.
OJEP helps junior mining companies finance early exploration projects, particularly in the
Critical Minerals space within Ontario, Canada. These projects help boost mineral
exploration, growth, and job creation in the province, particularly in northern and Indigenous
communities.
Finance
The Appendix 5B quarterly cashflow report for the December Quarter is submitted separately.
The Group closed the December quarter with a cash balance of $3,076k. Exploration
expenditure during the December Quarter totalled $2,884k (unaudited).
During the quarter the Falcon Lake project received a grant from the Ontario Government in
relation to Ontario Junior Explorer Program of AUD$223k
Use of Funds
A comparison of the Company’s actual expenditure since readmission to the Official List of
ASX to 31 December 2023 against estimated expenditure in the use of funds statement in the
Prospectus is set out below in accordance with ASX Listing Rule 5.3.4. The table also shows
the Company’s expenditure for the December quarter, as required by ASX Listing Rule 5.3.1:
Tidili Project
Falcon Lake Project
Bloom Lake Project
King Tut Project
Bleiberg Project
Administration and corporate costs
Costs associated of the Public Offer
Working Capital & M&A budget for complementary assets
2023
Prospectus
1,295,000
2,050,000
30,000
100,000
1,215,000
1,328,000
658,000
343,000
Use until
31 Dec 2023
885,648
5,752,369
38,747
225,133
2,157,465
603,094
336,247
Use For Dec
23 Quarter
215,007
2,506,018
9,920
64,995
539,105
0
115,670
7,019,000
9,883,032
3,335,045
The material use of funds variance explanations is outlined below:
Note: A capital raise of $6.4m was completed in August 2023 and is outside the Use of
Funds estimate.
•
Variances to operational expenditures are due to the accelerated drilling campaign at
Falcon Lake. The maiden drill campaign of 5,000m at Falcon Lake as outlined in the
Prospectus has been surpassed due to positive results, therefore the drill campaign
was expanded. Project to date we have drilled 9,286m.
•
Falcon Extension tenements acquired during the quarter under working capital for
CAD$100k cash plus shares in consideration.
ASX Announcement
Released Released 25 January 2024
9
•
Variances to administration and corporate cost are due to the accelerated operational
campaign being deployed at Falcon Lake and the additional administrative support
required.
•
Ongoing operational and exploration expenditure will be monitored and adjusted in
line with available cash to meet tenement expenditure requirements.
Payments to Related Parties
Pursuant to section 6 of the Company’s Appendix 5B, and as required under ASX Listing Rule
5.3.5, during the December Quarter the Company paid $49k to current Directors for
remuneration.
Capital Structure
The capital structure at the end of the December Quarter is as follows:
•
91,885,218 Ordinary Shares.
•
41,905,023 Options.
•
1,255,000 Performance Rights.
•
7,000,000 Performance Shares.
Interests in Mining Tenements as at 31 December 2023
Acquired Interest
during Quarter
Interest at the end
of Quarter
M47/1450
221266, 221267, 229223
243759, 251792, 251793
251794, 287807, 308044
325202, 336173, 582713
582714, 716167, 716168,
716165, 716166, 716170,
716171, 716169
-
36.5%
100%
727287 to 727384
2668831, 670166, 670168,
721084, 721085, 746214,
754668
3106057-106058, 121357121360, 122094, 132858132859, 134102, 136948,
136962, 142489, 148810,
164547-164548, 166603,
178073, 179345, 185376185377, 186114-186115,
208573, 209065, 215331,
224637-224639, 237714237716, 244810, 246081,
252181, 256393-256395,
274457, 281913, 289275,
291550, 301417-301418,
302155, 311782-311784
100%
100%
-
90%
Location
Tenement Reference
Western Australia1
Canada, Bloom Lake
Canada, Falcon Lake
- Central
ASX Announcement
Released Released 25 January 2024
100%
10
Location
Tenement Reference
- West
- East
Canada, Jessie Lake
727385 – 727406
727409 – 727452
834651 – 834704
835652 - 835724
EP3842355, EP3842356,
ML383699
EL 476/22 (BB1) – 591/22
(BB116)
1524/23 (1/23) – 1583/23
(60/23)
168-L-1939
66-C-2005
28-L-2011
Morocco, Tidili
Austria, Bleiberg4
Argentina
1.
2.
3.
4.
Acquired Interest
during Quarter
-
Interest at the end
of Quarter
100%
100%
100%
-
85%
-
15%
-
100%
-
100%
100%
100%
Battery Age’s interest in the Hamersley Iron Ore Project is held indirectly by way of its investment held in Equinox Resources Limited.
In October 2023, the Company acquired a 2 year option, (i) an initial 40% interest by making a cash payment of CAD$100k and
issuing 250k fully paid ordinary shares (completed); (ii) acquisition of an addition 40% interest by making a cash payment of CAD$75k
and issuing 250k fully paid ordinary shares on or before the first anniversary of stage (i) and (iii) acquisition of an addition 10%
interest by making a cash payment of CAD$15k and issuing 250k fully paid ordinary shares on or before the second anniversary of
stage (i). The Company will retain the respective % interest acquired under the respective staged option, in the event that the
subsequent option(s) are not exercised.
The Company may acquire the final 10% of the above identified Falcon Lake tenements by paying an amount equal to the lower of
(i) the price determined by an independent valuation, or (ii) A$2,000,000.
The Company may acquire a further 46% interest (total 51%) in the above Bleiberg tenements within 24 months of acquiring its
original 15% interest by: (i) incurring a minimum of C$1,000,000 in expenditure on the project, and (ii) issuing the project vendors
C$377,5000 worth of BM8 shares calculated based on the greater of the 10 day VWAP or $0.40.
The Company may acquire a further 14% interest (total 65%) in the above Bleiberg tenements within 24 months of acquiring the
abovementioned 46% interest by incurring an additional C$3,500,000 in expenditure on the project.
The Company may acquire the final 15% interest (total 80%) in the above Bleiberg tenements within 6.5 years from executing the
Bleiberg Agreement upon completion of a Bankable Feasibility Study that is compliance to JORC and indicates the project will have
a production rate of at least 100,000 tonnes per year.
- END Release authorised by the Board of Battery Age Minerals Ltd.
Contacts
Investors / Shareholders
Nigel Broomham
Interim Chief Executive Officer
P: +61 (0)8 6109 6689
E: info@batteryage.au
ASX Announcement
Released Released 25 January 2024
Media
Nicholas Read – Read Corporate
P: +61 (0)8 9388 1474 / (0419) 929 046
E: nicholas@readcorporate.com.au
11
Compliance Statement
This report contains information on the Falcon Lake and Jessie Lake Projects extracted from an ASX market announcement dated
8 December 2022, 2 February 2023, 13 June 2023, 26 July 2023, 2 August 203, 16 August 2023, 6 September 2023, 14
September 2023, 5 October 2023, 10 October 2023, 16 October 2023, 25 October 2023, 1 November 2023, 30 November 2023
and 13 December 2023 released by the Company and reported in accordance with the 2012 edition of the “Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). This report contains information on the
Tidili Project extracted from an ASX market announcement dated 8 December 2022, 2 February 2023, 11 April 2023 and 24 July
2023 released by the Company and reported in accordance with the 2012 edition of the “Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). This report contains information on the Bleiberg Project
extracted from an ASX market announcement dated 8 December 2022, 2 February 2023, 13 July 2023 and 21 August 2023
released by the Company and reported in accordance with the 2012 edition of the “Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves” (JORC Code). The original market announcements are available to view on
www.batteryage.au and www.asx.com.au. Battery Age is not aware of any new information or data that materially affects the
information included in the original market announcement.
Forward Looking Statements
Information included in this release constitutes forward-looking statements. Often, but not always, forward looking statements can
generally be identified by the use of forward looking words such as “may”, “will”, “expect”, “intend”, “plan”, “estimate”, “anticipate”,
“continue”, and “guidance”, or other similar words and may include, without limitation, statements regarding plans, strategies and
objectives of management, anticipated production or construction commencement dates and expected costs or production
outputs. Forward looking statements inherently involve known and unknown risks, uncertainties and other factors that may cause
the Company’s actual results, performance and achievements to differ materially from any future results, performance or
achievements. Relevant factors may include, but are not limited to, changes in commodity prices, foreign exchange fluctuations
and general economic conditions, increased costs and demand for production inputs, the speculative nature of exploration and
project development, including the risks of obtaining necessary licenses and permits and diminishing quantities or grades of
reserves, political and social risks, changes to the regulatory framework within which the company operates or may in the future
operate, environmental conditions including extreme weather conditions, recruitment and retention of personnel, industrial
relations issues and litigation. Forward looking statements are based on the Company and its management’s good faith
assumptions relating to the financial, market, regulatory and other relevant environments that will exist and affect the Company’s
business and operations in the future. The Company does not give any assurance that the assumptions on which forward looking
statements are based will prove to be correct, or that the Company’s business or operations will not be affected in any material
manner by these or other factors not foreseen or foreseeable by the Company or management or beyond the Company’s control.
Although the Company attempts and has attempted to identify factors that would cause actual actions, events or results to differ
materially from those disclosed in forward looking statements, there may be other factors that could cause actual results,
performance, achievements or events not to be as anticipated, estimated or intended, and many events are beyond the reasonable
control of the Company. Accordingly, readers are cautioned not to place undue reliance on forward looking statements. Forward
looking statements in these materials speak only at the date of issue. Subject to any continuing obligations under applicable law
or any relevant stock exchange listing rules, in providing this information the company does not undertake any obligation to publicly
update or revise any of the forward-looking statements or to advise of any change in events, conditions or circumstances on which
any such statement is based.
ASX Announcement
Released Released 25 January 2024
12
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
BATTERY AGE MINERALS LTD
ABN
Quarter ended (“current quarter”)
80 085 905 997
31 December 2023
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date ( 6
months)
$A’000
-
-
(79)
(274)
(b) development
-
-
(c) production
-
-
(d) staff costs
(225)
(391)
(e) administration and corporate costs
(592)
(1034)
-
-
27
27
(a) exploration & evaluation
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
223
223
1.8
Other (provide details if material)
- Settlement of Litigation
-
-
(646)
(1,449)
-
-
(116)
(116)
-
(6)
(2,689)
(4,615)
(e) investments
-
-
(f)
-
-
1.9
Net cash from / (used in) operating
activities
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) exploration & evaluation
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date ( 6
months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(2,805)
(4,737)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
6,403
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
1
1
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
(335)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
(6)
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
1
6,063
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
6,526
3,200
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(646)
(1,449)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(2,805)
(4,738)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
1
6,062
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
5.2
Current quarter
$A’000
Year to date ( 6
months)
$A’000
-
-
3,076
3,076
Current quarter
$A’000
Previous quarter
$A’000
3,076
6,526
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
3,076
6,526
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
(49)
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(2,689)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(3,335)
8.4
Cash and cash equivalents at quarter end (item 4.6)
3,076
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
3,076
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
0.92
$A’000
(646)
-
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: The Company will continue to closely monitor its available cash and will adjust
operating and exploration expenditure as required. The current quarters cash
expenditure will be significantly lower than the preceding quarters, with exploration
drilling paused over the Christmas and new year periods.
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: The company has a strong track record of being able to raise funds if required and
will continue to monitor market conditions, available cash and adjust operating and
exploration expenditure as required.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: Yes, the Company expects to continue its operations and exploration activities to
meet tenement requirements and will review and adjust according to its available
funding.
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
25 January 2024
Authorised by: The Board of Battery Age Minerals Ltd
(Name of body or officer authorising release – see note 4)
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been a
Share your feedback
Discover