BM8 Defines Multiple Km Scale Gold Targets at El Aguila
Released
Released
Announcement PDF
ASX Announcement
Released 05 September 2025
Battery Age Defines Multiple KilometreScale Gold-Silver Priority Drill Targets at El
Aguila Project, Argentina
HIGHLIGHTS
•
Integration with Historical High-Grade Results – Targets coincide with rock chip assays
up to 174.6 g/t Au & 4,739 g/t Ag and drill intercepts including 0.55 m @ 40.55 g/t Au
(DDA-08), 7.0 m @ 2.48 g/t Au incl. 1.7 m @ 9.02 g/t Au (DDA-25), and 3.0 m @ 5.97 g/t
Au (DDA-34).
•
Soil Sampling Defines Multiple Kilometre-Scale Gold-Silver Anomalies – Peak assays
of 134 ppb Au and 35.6 ppm Ag with strong pathfinder support (As to 428 ppm).
•
IP (induced Polarization) and Magnetitic Define Structural Controls – 327 line-km of
new ground magnetics and 58 line-km of gradient IP/resistivity define multiple chargeability
and resistivity anomalies coincident with surface geochemistry and mapped quartz veins.
•
New Targets Identified – Profundo, Aguila South Central, Aguila Main East Extension,
Verbena, and Lagoon anomalies prioritised for maiden drill testing.
•
Permitting & EIA on Track – Environmental baseline studies complete; EIA and maiden
drilling application has been lodged.
•
Drilling Scheduled for 2025 – The Company’s maiden drilling program will test high-grade
anomalies across multiple corridors at Aguila Main, Aguila South, Fresia and Verbena.
Battery Age Minerals Ltd (ASX: BM8) (“Battery Age” or “the Company”) is pleased to report
the successful results from the recently completed soil sampling program and the results of
the IP (induced polarisation) and magnetic targeting review completed by Cambell and Walker
Geophysics from the UK at the El Aguila Gold-Silver Project in Santa Cruz Province, Argentina.
Battery Age CEO, Nigel Broomham, commented:
“The scale and resolution of our recent field programs at El Aguila have transformed our
understanding of the mineral system. The combination of modern geophysics, detailed
mapping, and high-density soil sampling has validated and expanded our target base,
particularly around El Aguila Main, South, and the broader structural corridors.
Importantly, the petrographic analysis has confirmed free-milling gold and silver minerals,
which is a strong positive from a processing and development standpoint. The new data sets
not only de-risk the next exploration phase but have added to the pipeline of targets. We remain
on track to receive our maiden drill permit approval this quarter and anticipate commencing
drilling shortly thereafter.”
Battery Age Minerals Ltd
ASX: BM8
ACN 085 905 997
batteryageminerals.au
T: +61 (8) 6109 6689
E: info@batteryage.au
Level 50, 108 St Georges Terrace
Perth, WA 6000
PO Box 7310, Cloisters Square Po, WA 6850
1
Figure 1: El Aguila – located in the rich gold and silver mining region of Santa Cruz. Proximal to large scale
operating Au and Ag mines.
Figure 2: El Aguila Au soil values and Aguila South Rock Chip highlights. ppm equivalents to g/t
ASX Announcement
Released 05 September 2025
2
Soil Sampling – Geochemical Vectoring
Soil sampling continues to demonstrate its effectiveness as an exploration tool at the El Aguila
property, where it has historically outlined mineralisation at both the Aguila Main and San
Cristobal targets. To date, more than 1,400 historic soil sampling results have been compiled,
with gold and silver results delineating the mineralised system.
In 4QFY25, the Company completed a further 838 soil samples across five systematic grids.
This work was designed to test extensions of known mineralised trends and to evaluate newly
defined geophysical corridors. The results provide expanded geochemical coverage and have
successfully highlighted new areas of interest for follow-up exploration (Figures 3 & 4).
Sampling was conducted at 50 m intervals on lines spaced 100–200 m apart. The program
has defined 4 significant new targets, each supported by elevated gold, silver, and key
pathfinder elements (arsenic, lead, zinc, copper). These include:
Profundo – A northeast-trending soil anomaly is associated with an interpreted fault and
elevated trace-element geochemistry in adjacent rocks. The 2025 IP geophysics identified a
coincident high chargeability trend along the western edge, moderate linear trend in the
eastern extension. The target remains untested by drilling.
Aguila South Central – This target is defined by two isolated gold-in-soil anomalies south of
Fresia and Lucia, supported by 2025 geophysical results highlighting chargeability, resistivity,
and linear magnetic features (as detailed in targets AS-1 to AS-4). Additional infill sampling
and trenching is planned as a follow work program. High-grade surface rock samples collected
~200 m to the north-northwest on a parallel trend further support the prospectivity of this area.
Aguila Main & East Extension – Represents the projected connection between Aguila Main
and San Cristóbal, defined by northeast-trending geochemical anomalies extending over 1.2
km. The trend is coincident with a moderate IP chargeability response, moderate resistivity,
and supporting soil geochemistry, highlighting the potential linkage between the Aguila Main
and San Cristóbal systems.
Verbena – A west-northwest-trending gold-in-soil anomaly where geochemistry coincides with
a weak but well-defined chargeability trend with coincident high resistivity trend along the
graben margin separating Jurassic volcanics from basement rocks. Sub-parallel quartz veins
can be traced intermittently across 1.2 km along a NW strike.
ASX Announcement
Released 05 September 2025
3
Profundo
Figure 3: Au soil values, new interpreted target areas dashed red.
Overall, the work programs have returned encouraging geochemical responses with elevated
gold, silver and pathfinder elements supported by coinciding geophysical trends. These results
have delineated 3 new targets and extensions to the Aguila Main and San Cristobal targets
which are known strong mineralised trends and these extensions remain untested.
Soil sampling across the property has defined gold values up to 134 ppb (0.134 ppm) and
silver values up to 35.6 ppm. These precious metal results are supported by strong pathfinder
element responses, with arsenic returning values up to 428 ppm. Muted base metal anomalies
in lead (342 ppm), zinc (162 ppm), and copper (145 ppm) suggest the presence of a coincident
base-metal halo, consistent with large epithermal systems observed elsewhere in the Deseado
Massif.
The combination of precious-metal highs and elevated pathfinder elements presents a strong
geochemical footprint that underpins the potential of the El Aguila mineralisation system.
Importantly, the overlap of gold, silver and arsenic anomalies provides clear vectors for followup work and increased confidence in the upcoming drill target selection, while the presence of
base metal enrichment strengthens the case for a large and fertile mineralised system.
In the next step, the Company plans to advance exploration by integrating the soil data with
geological mapping and geophysical interpretation to refine drill targets. Follow-up trenching
will focus on areas where gold, silver and arsenic anomalies coincide with new geophysical
anomalies and extensions of the known high-grade silver and gold trends. These results
enable Battery Age to target high value targets with the aim of rapidly advancing the most
prospective zones to add ounces through drilling.
ASX Announcement
Released 05 September 2025
4
Figure 4: Ag soil values, new interpreted target areas dashed blue.
Geophysical Surveys – Successful Merging of the Historic and the 2025
Magnetic and Induced Polarization Surveys.
Campbell & Walker Geophysics completed a comprehensive review of the recent and historic
magnetic (MAG) and induced polarization (IP) geophysical surveys at the El Aguila Project,
which has provided a robust foundation for exploration targeting. There have been three
successive magnetic surveys completed over the property: in 2007, in 2012, and most recently,
and the largest completed by Battery Age Minerals in May 2025. The May 2025 unifying survey
was comprised of, 327.05 line-kilometres of ground magnetic data, which was collected across
a 54 km² area, covering the central, southern, and southeastern portions of the project.
Targeting from this unifying approach has identified nine new targets and expanded on existing
know mineralised zone (Figure 5):
ASX Announcement
Released 05 September 2025
5
Figure 5: Combined and levelled MAG RTP 1VD with geophysics targets.
•
AM-1 – Eastern extension of the Aguila Main anomaly; strong chargeability and resistivity
response consistent with the main trend.
•
SC-1 – Northeast branch of Aguila Main; geophysical trend linking Aguila Main and San
Cristobal supported by drilling and DCIP results.
•
AS-4 – Boundary zone between North and South Aguila; chargeability high with magnetic
variability, likely continuation of Aguila Main system.
•
SE-2 – San Cristobal/Verbena area; coincident chargeability and resistivity anomaly
similar to Aguila Main.
•
AS-1 – Jurassic Corridor NW of Aguila; weak but persistent geophysical trend interpreted
as possible northern extension of Aguila structures.
•
AS-2 – Aguila Southwest; chargeability anomaly directly correlating with mapped quartz
veins.
•
AS-3 – Discrete magnetic and chargeability anomaly southwest of Aguila, also correlating
with mapped veins.
•
W-1 – Western sector; strong chargeability anomaly distinct from other targets, with
eastern extension resembling Aguila and San Cristobal trends.
•
SE-1 – Southern extension; chargeability and resistivity anomaly with positive trenching
results, similar to Aguila Main/San Cristobal.
ASX Announcement
Released 05 September 2025
6
The magnetic datasets from 2007, 2012, and 2025 were carefully levelled and merged into a
single, uniform grid to eliminate line-to-line offsets and regional artefacts. Advanced processing
steps included the removal of the regional magnetic trend, reduction-to-pole (RTP)
transformation, and generation of FFT derivatives such as first vertical derivative (1VD) and tilt
derivative (TDR), which enhanced subtle structural features and edges of magnetic bodies.
The merged data was then inverted to produce a 3D susceptibility model at 50x50x25 m voxel
resolution, allowing direct correlation with mapped lithologies and mineralised structures.
In parallel, gradient IP surveys from the 2007, 2012, and 2025 campaigns (Figure 6) were
combined onto a consistent scale, producing integrated chargeability and resistivity datasets,
while pole–dipole IP data from 2012 were spatially tied to reference inversion sections.
This first time holistic interpretation has highlighted strong geophysical correlations with
supporting historic drilling and trenching results, and defined nine new priority follow-up areas,
several untested, underscoring the project’s robust discovery potential.
Interpretation of the magnetic data highlights:
•
Linear magnetic trends east and west of El Aguila Main, reinforcing the potential for
mineralised corridor extensions;
•
Two previously untested magnetic anomalies west of El Aguila Main, each
approximately 1.4 km x 400 m in size;
•
A 1.3 km northwest-trending structure in recessive terrain in the southeast, not
previously recognised, that may indicate an untested fluid conduit;
•
Verbena target. Clear definition of the basement–volcaniclastic contact at the
Verbena target, interpreted to represent a 2.1 km-long graben margin. Soil samples
values have returned high gold values striking west-south-west mirroring the geological
and geophysical data.
Magnetic derivatives (first vertical derivative, tilt, pole reduction) will be used to guide final drill
target selection, particularly in areas of recessive outcrop where structure is difficult to map at
surface.
Gradient IP and Resistivity – Mapping Subsurface Continuity and Vein
Architecture
Gradient IP/Resistivity surveys were completed across five high-priority zones, totalling 58.12
line-kilometres over 8.2 km² (Figure 2). The survey employed an Iris Instruments VIP 5000
transmitter and ELREC-Pro receiver using a 1,800 m current bipole and 25 m dipole spacing.
Despite low sulphide content typical of epithermal systems, trace pyrite mineralisation
generates measurable chargeability, while silicified and veined zones produce resistive
responses. Preliminary findings include:
•
Target 1 (El Aguila Main-South Linkage): Three east-west resistive features with
coincident or offset chargeability highs suggest structural continuity and multiple
mineralised conduits.
•
Target 2 (Western Extension): A resistive 800 m linear feature west of El Aguila Main
potentially marks the continuation of a major mineralised structure.
•
Target 3 (San Cristóbal Link): A northwest-trending 825 m resistive anomaly links El
Aguila Main to southern trends extending toward San Cristóbal, with subtle structural
flexure suggesting vein dilation.
ASX Announcement
Released 05 September 2025
7
•
Target 4 (Verbena Contact Zone): Three east-northeast trending resistive anomalies
lie beneath strong surface assay results and mapped veins, consistent with mineralised
zones overlying a structural break.
•
Target 5 (Lagoon): Data processing is underway; early observations suggest
previously unrecognised structural controls in a recessive setting.
Together with the magnetics, these datasets will form the foundation for a refined 3D structural
model, supporting the final positioning of drill collars.
The preliminary interpretation of the Gradient IP/Resistivity data is highly encouraging. Adding
this data to the 3D model and integrating the structural and lithological mapping with the drilling
and soil chemistry are currently underway. These advanced interpretations will inform final drill
targeting decisions.
Figure 6: Merged and levelled gradient IP, Resistivity.
ASX Announcement
Released 05 September 2025
8
Figure 7: Merged and levelled gradient IP, Chargeability.
Environmental Impact Assessment – Permitting on Track
Battery Age has completed all field components of the Environmental Impact Assessment
(EIA), including baseline biological and archaeological studies, in alignment with provincial
permitting requirements. Submission of the EIA, together with the Company’s maiden drilling
permit application, and registration with the Santa Cruz Mining Ministry is complete. The drill
permit is anticipated for the end of Q3 CY2025.
Pending approvals, the Company’s maiden drilling is anticipated to commence shortly
thereafter in CY2025, targeting multiple high-grade corridors defined through integrated
geophysics, surface geochemistry, and structural mapping.
Milestones completed:
Compilation of geophysical data completed.
Soil sample assays received, validated and interpreted.
Identification of drill contractor.
Logistics planning and procurement is largely completed for the anticipated drill
program.
Selection of geological contractor.
Selection of laboratory.
ASX Announcement
Released 05 September 2025
9
Next Steps
•
Finalise integrated 3D geological model
•
Confirm drill design and mobilise rigs
•
Commence maiden drill program CY 2025
Table 1: Assay highlights of the drilling completed at the El Aguila Property (ref announcement 31/01/2025)
Table 2: Assay highlights rock-chip sampling completed at the El Aguila Property (ref announcement 31/01/2025).
ASX Announcement
Released 05 September 2025
10
References
1.
Refer ASX announcement 31 January 2025, BM8 to Acquire High-Grade Gold & Silver Project in
Argentina.
2.
CEIC Date, February 2025, https://www.ceicdata.com/en/indicator/argentina/gold-production
3.
Refer ASX announcement 28 May 2025, Exploration Field Programs Completed at El Aguila Gold-Silver
Project, Argentina.
[ENDS]
Release authorised by the Board of Battery Age Minerals Ltd.
Contacts
Investors / Shareholders
Media
Nigel Broomham
Kelly-Jo Fry
Chief Executive Officer
Battery Age Minerals
P: +61 (0)8 6109 6689
P: +61 (0)8 6109 6689
E: info@batteryage.au
E: kjfry@batteryage.au
Competent Person Statement
The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the ‘JORC
Code’) sets out minimum standards, recommendations and guidelines for Public Reporting in Australasia of
Exploration Results, Mineral Resources and Ore Reserves.
The information in this release that relates to Exploration Results is based on information prepared by Dr Simon
Dorling. Dr Dorling is a member of the Australian Institute of Geoscientists (Member Number: 3101) and a consultant
of Battery Age. Dr Dorling has sufficient experience which is relevant to the style of mineralisation and type of
deposit under consideration and to the activity which they are undertaking to qualify as a Competent Person as
defined in the 2012 Edition of the JORC Code (Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves). Dr Dorling consents to the inclusion in the release of the matters based on their
information in the form and context in which it appears.
Compliance Statement
This report contains information on the El Aguila Project extracted from an ASX market announcements dated 31
January 2025 and 28 May 2025 released by the Company and reported in accordance with the 2012 edition of the
“Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). The
original market announcement is available to view on www.batteryage.au and www.asx.com.au. Battery Age is not
aware of any new information or data that materially affects the information included in the original market
announcement.
Forward-Looking Statement
This announcement may contain certain forward-looking statements and projections. Such forward looking
statements/projections are estimates for discussion purposes only and should not be relied upon. Forward looking
statements/projections are inherently uncertain and may therefore differ materially from results ultimately achieved.
Battery Age Minerals Limited does not make any representations and provides no warranties concerning the
accuracy of the projections and disclaims any obligation to update or revise any forward-looking statements/projects
based on new information, future events or otherwise except to the extent required by applicable laws. While the
information contained in this report has been prepared in good faith, neither Battery Age Minerals Limited or any of
its directors, officers, agents, employees or advisors give any representation or warranty, express or implied, as to
the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this
announcement.
ASX Announcement
Released 05 September 2025
11
Appendix 1
Figure 8: El Aguila project magnetic survey grids, line orientations, and date of the survey.
Figure 9: El Aguila project induced polarization survey grids, line orientations and date of the survey.
ASX Announcement
Released 05 September 2025
12
Appendix 2 – JORC CODE, 2012 EDITION – TABLE 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
Sampling
techniques
Drilling
techniques
Drill sample
recovery
JORC Code explanation
• Nature and quality of sampling (eg.
cut channels, random chips, or
specific specialised industry
standard measurement tools
appropriate to the minerals under
investigation, such as down hole
gamma sondes, or handheld XRF
instruments, etc). These examples
should not be taken as limiting the
broad meaning of sampling.
• Include reference to measures taken
to ensure sample representativity
and the appropriate calibration of
any measurement tools or systems
used.
• Aspects of the determination of
mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’
work has been done this would be
relatively simple (eg ‘reverse
circulation drilling was used to obtain
1 m samples from which 3 kg was
pulverised to produce a 30 g charge
for fire assay’). In other cases more
explanation may be required, such
as where there is coarse gold that
has inherent sampling problems.
Unusual commodities or
mineralisation types (eg submarine
nodules) may warrant disclosure of
detailed information.
• Drill type (eg core, reverse
circulation, open-hole hammer,
rotary air blast, auger, Bangka,
sonic, etc) and details (eg core
diameter, triple or standard tube,
depth of diamond tails, facesampling bit or other type, whether
core is oriented and if so, by what
method, etc).
• Method of recording and assessing
core and chip sample recoveries and
results assessed.
• Measures taken to maximise sample
ASX Announcement
Released 05 September 2025
•
•
•
•
•
•
Commentary
The Magnetic survey was
completed using 2 Mobile GEM19W Overhauser Magnetometers
with continuous reading. A GEM-19
Base Magnetometer was also used.
The IP survey was completed using
one GDD TXIV, 20Amp transmitter
and an Iris Elrec Pro receiver, 15x
non-polarising, porous electrodes
was also utilized.
Solar weather was monitored as
was local atmospheric weather to
ensure accuracy of the readings.
Soil samples were taken at 50m
stations and 100m or 200m line
spacing depending on the grid. The
details of the sample sites were
recorded, and efforts to collect the
same horizon were made and
recorded. The sites' UTM’s were
recorded digitally along with the site
details.
The samples were submitted for
analysis to ALS Global Laboratory
in Mendoza, an ISO certified
laboratory.
The assays by fire assay for gold
and a 39-element ICP analysis was
completed on all samples. Regular
blanks samples and lab check
samples were added to the
samples, in line with industry
standards QAQC procedures, were
submitted, and were recorded in the
assay data. The results of the QA
samples assayed within acceptable
variation, as did the lab check for
QC.
• No drilling was completed or
reported as part of this release.
• No drilling was completed or
reported as part of this release.
13
Criteria
•
Logging
•
•
•
Subsampling
techniques
and sample
preparation
•
•
•
•
•
•
Quality of
assay data
and
laboratory
tests
•
•
•
JORC Code explanation
recovery and ensure representative
nature of the samples.
Whether a relationship exists
between sample recovery and grade
and whether sample bias may have
occurred due to preferential loss/gain
of fine/coarse material.
Whether core and chip samples
have been geologically and
geotechnically logged to a level of
detail to support appropriate Mineral
Resource estimation, mining studies
and metallurgical studies.
Whether logging is qualitative or
quantitative in nature. Core (or
costean, channel, etc) photography.
The total length and percentage of
the relevant intersections logged.
If core, whether cut or sawn and
whether quarter, half or all core
taken.
If non-core, whether riffled, tube
sampled, rotary split, etc and
whether sampled wet or dry.
For all sample types, the nature,
quality and appropriateness of the
sample preparation technique.
Quality control procedures adopted
for all sub-sampling stages to
maximise representivity of samples.
Measures taken to ensure that the
sampling is representative of the in
situ material collected, including for
instance results for field
duplicate/second-half sampling.
Whether sample sizes are
appropriate to the grain size of the
material being sampled.
The nature, quality and
appropriateness of the assaying and
laboratory procedures used and
whether the technique is considered
partial or total.
For geophysical tools,
spectrometers, handheld XRF
instruments, etc, the parameters
used in determining the analysis
including instrument make and
model, reading times, calibrations
factors applied and their derivation,
etc.
Nature of quality control procedures
adopted (eg standards, blanks,
duplicates, external laboratory
checks) and whether acceptable
levels of accuracy (ie lack of bias)
and precision have been
ASX Announcement
Released 05 September 2025
Commentary
• No drilling or drill logging, or logging
of soils occurred during this program.
• All soil sample sites were preselected based on a grid pattern.
Samplers used the GPS to navigate
to each site. A soil auger was used
to get to the C-horizon. A 2kg soil
sample was retrieved and sieved to
remove >0.5cm. A 1-1.5kg sample
was placed in a bag and the sample
details were recorded.
• The soil has not been glaciated or
river transported and the C horizon is
likely a regolith and is strongly
representative of the adjacent
bedrock.
• Both the sample size and the grain
size were appropriate for this type of
geochemical survey.
• The nature, quality and
appropriateness of the assaying and
laboratory procedures used is
considered industry standard.
• All soil sample prep was coded Prep31, which entailed—Crush, Split,
Pulverize 250 g to better than 85 %
passing minus 75 micron sieve.
• Assay techniques used were: 1)
ME-ICP41 36 elements by aquaregia acid digestion and ICP-AES.
Quantitatively dissolves base metals
for the majority of geological
materials. Major rock forming
elements and more resistive metals
are only partially dissolved, 2) AuAA24 Au by fire assay and AAS, 50
g nominal sample weight
• ALS Global Ltd. Are International
14
Criteria
Of
Verification
of sampling
and
assaying
Location of
data points
Data spacing
and
distribution
Orientation
of data in
relation to
geological
structure
JORC Code explanation
established.
Commentary
and internationally certified
independent service provider.
Internal industry-standard assay
quality control techniques were
used for gold, silver, and trace
element geochemistry. There were
no abnormalities in the internal
assay checks or the submitted
blacks.
• The verification of significant
intersections by either independent
or alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data
entry procedures, data verification,
data storage (physical and
electronic) protocols.
• Discuss any adjustment to assay
data.
• Accuracy and quality of surveys
used to locate drill holes (collar and
down-hole surveys), trenches, mine
workings and other locations used in
Mineral Resource estimation.
• Specification of the grid system
used.
• Quality and adequacy of topographic
control.
• No verification by either independent
or alternative company personnel
were required.
• All sample sites were described, and
the locations were recorded. Pulps of
the soil samples have been retained
in case further checks are needed.
At this time, there are no
discrepancies.
• Data spacing for reporting of
Exploration Results.
• Whether the data spacing and
distribution is sufficient to establish
the degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve
estimation procedure(s) and
classifications applied.
• Whether sample compositing has
been applied.
• Whether the orientation of sampling
achieves unbiased sampling of
possible structures and the extent to
which this is known, considering the
deposit type.
• If the relationship between the
drilling orientation and the orientation
of key mineralised structures is
considered to have introduced a
• Drill and sample campaigns were for
exploration purposes, and therefore,
suitable spacing and distribution to
establish the degree of geological
and grade continuity appropriate for
Mineral Resource and Ore Reserve
estimation have yet to be
determined.
• No sample compositing has occurred
beyond what is outlined under
"Sampling Techniques."
• Both the soil sampling a geophysical
surveys were carried out to sample
across the strike of the
mineralisation, based on surface
mapping, and earlier geophysical
and drill hole interpretation
ASX Announcement
Released 05 September 2025
• Both the soil sample positions and
geophysical grids were located and
navigated along using a handheld
GPS, with an average of +/- 3m of
the recorded position.
• The grid datum is POSGAR Zone
2S.
• Surveys were collected at the top of
the soil sample hole and end of hole,
intervening surveys were taken at
~40m apart.
• The topographic measurements of
the sample location and geophysical
grids were similar to those recorded
in the field and observed on
government topographic maps.
15
Criteria
Sample
security
JORC Code explanation
sampling bias, this should be
assessed and reported if material.
• The measures taken to ensure
sample security.
Audits or
reviews
• The results of any audits or reviews
of sampling techniques and data.
ASX Announcement
Released 05 September 2025
Commentary
• All soil samples were under the
custody and control of the operating
company’s representatives until
delivery by bonded courier to the
laboratory, where they were held in a
secure enclosure pending
processing.
• No external audit has been
undertaken at this stage.
16
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
Mineral
tenement
and land
tenure
status
JORC Code
explanation
• Type, reference
name/number,
location and
ownership including
agreements or
material issues with
third parties such as
joint ventures,
partnerships,
overriding royalties,
native title interests,
historical sites,
wilderness or national
park and
environmental
settings.
• The security of the
tenure held at the
time of reporting
along with any known
impediments to
obtaining a licence to
operate in the area.
Commentary
•
•
•
•
•
ASX Announcement
Released 05 September 2025
The project is located in the Santa Cruz Province of
Argentina, ~530km NNE of Rio Gallegos (province
capital) and comprises of three licence blocks
(Aguila I, No423.460/W/10., Aguila II
No427.885/W/11. and Winki No406.199/W/02.)
which covers an area of 9,124ha (91km2) held
100% owned by Fredonia Mining Inc. subsidiary
Minera Fredonia S
Share your feedback
Discover