Fieldwork Campaign Confirmed at Bleiberg Project in Austria
Released
Released
Announcement PDF
ASX Announcement
Released 1 October 2024
Fieldwork Campaign Confirmed at Bleiberg
Lead-Zinc-Germanium Project in Austria
HIGHLIGHTS
•
Upcoming Field Campaign: Battery Age Minerals is set to conduct its maiden field
campaign in early October aimed at validating and refining drill targets over a 6km strike
length at the Bleiberg Zinc-Lead-Germanium Project.
•
Maiden Field Campaign to include: Reconnaissance geological traverses to enhance
mapping efforts and the collection of surface samples, assessment of scale, and
establishing drilling targets.
•
Focus on High-Potential Targets: The technical team aims to prioritise identified highpotential drill targets, leveraging the favourable geological, mineralogical, and stratigraphic
parameters that underscored the Bleiberg area as a historical world-class mining district.
•
Advanced Targeting Strategy: The Company has integrated over 100 years of historical
geological data, confirming the presence of mineralisation-hosting stratigraphy and
identifying areas with historical mining evidence
•
Strategic Metal Prices Surge: Prices for germanium and gallium, have significantly
increased over the past 12 months, underscoring the strategic importance of these metals
and highlighting the opportunity for the Bleiberg Project to tap into the growing market.
•
Scale: The historical Bleiberg mine was one of the largest germanium producers in the
world whilst in production, and the area is host to some of the world’s highest Germanium
grades as well as Gallium mineralisation (90-110g/t)i1,2.
Battery Age Minerals Ltd (ASX: BM8; “Battery Age” or “the Company”) is pleased to
announce the details for its upcoming field campaign. CEO Nigel Broomham and Chief
Geological Advisor, Dr Simon Dorling will be completing infield geological works targeted at
validating and refining drill targets ahead of submitting the Company’s maiden drilling permit
at the Bleiberg Zinc-Lead-Germanium Project.
Battery Age has advanced its targeting strategy by integrating 100+ years of historical
geological data, confirming the presence of prospective mineralisation-hosting stratigraphy,
and identifying several areas with historic mining evidence, extending drill targets over a 6km
strike length (Figure 1).
Battery Age Minerals Ltd
ASX: BM8
ACN 085 905 997
batteryageminerals.au
T: +61 (8) 6109 6689
E: info@batteryage.au
Level 50, 108 St Georges Terrace
Perth, WA 6000
PO Box 7310, Cloisters Square Po, WA 6850
1
Figure 2: x-section
Figure 1: Geological map of the area underlying BM8’s Bleiberg project area with outcropping target horizons in
orange; ( indicates the location of the Bleiberg Mining Shafts;
indicates old historic mine workings and
adits).
The work program will result in the verification and a refined exploration strategy, which
includes defining targets, assessment of scale, and establishing clear decision milestones.
Field works will include reconnaissance geological traverses to enhance mapping efforts and
the collection of surface samples. Additionally, the team will reconfirm prospective geological
and structural domains while validating historic soil geochemical anomalies and reviewing the
level of exploration conducted at each site. A thorough verification and sourcing of all historic
drilling information will also be undertaken. To optimise the Company’s drilling strategy, we will
revise and redesign our stratigraphic and conceptual drill holes, followed by the prioritisation
and execution of drilling at identified high-potential targets.
Figure 2: Geological profile of the central project area looking west (refer Figure 1).
ASX Announcement
Released 1 October 2024
2
The Company’s technical team sees all the geological, mineralogical and stratigraphic
favourable parameters materialised in the west, that made the historic Bleiberg area a worldclass mining district, and to set an exploration target a probable outcome from its first drilling
program.
Figure 3 – Identified mineralised trend located along strike from historical workings. Inset table demonstrates
historical data for the Bleiberg Mine from previous workings ) 1,2,9.
Germanium and Gallium: Strategic Significance and Opportunities
Over the past 12 months, prices for both germanium and gallium have experienced
significant increases. According to tradingeconomics.com, Germanium increased 9,150
CNY/Kg or 97.34% since the beginning of 2024, according to trading on a contract for
difference (CFD) that tracks the benchmark market for this commodity. Gallium has risen
+37% since Jan 1st, 2024. This rise has largely been attributed to a combination of factors:
•
Supply Chain Disruptions: Both metals have faced supply chain challenges,
including reduced production and export restrictions. For instance, restrictions from
major producers or geopolitical tensions have constrained supply.
•
Increased Demand: Demand for germanium and gallium has surged due to their
critical roles in high-tech applications. Germanium is used in fiber optics, solar panels,
and electronics, while gallium is essential for semiconductors and LED technologies.
•
Market Speculation: The growing interest and speculation in these metals have also
contributed to price hikes. Traders and investors anticipating future shortages have
driven prices higher.
ASX Announcement
Released 1 October 2024
3
•
Geopolitical Factors: Trade policies and geopolitical tensions, particularly involving
major producers like China, have influenced market stability and pricing.
These factors combined have led to a notable increase in the prices of both germanium and
gallium over the last year.
The U.S., EU, Japan, India, and Australia have all designated Germanium and Gallium as
critical minerals due to their importance, concentration and scarcity. This highlights a
significant strategic opportunity for Battery Age and the Bleiberg Project, which is wellpositioned to disrupt the rigid supply chain for these vital semiconductor materials.
Figure 4 – Germanium increased 9,150 CNY/Kg or 97.34% since the beginning of 2024, according to trading on a
contract for difference (CFD) that tracks the benchmark market for this commodity.
Battery Age CEO Nigel Broomham commented:
"We are excited to announce the upcoming field campaign at our Bleiberg Zinc-LeadGermanium Project, which marks a crucial step in our exploration efforts. By leveraging over
a century of historical geological data, we are not only validating our drill targets but also
positioning ourselves to tap into the significant opportunities presented by the rising prices of
zinc, germanium and gallium. We are especially grateful for the support of the local
community members, whose insights and partnership are invaluable as we embark on this
journey. Our team is committed to optimising our drilling strategy and maximising exploration
outcomes, and we believe the Bleiberg area, with its rich history, holds tremendous potential
for both our company and our stakeholders."
Release authorised by the Board of Battery Age Minerals Ltd.
ASX Announcement
Released 1 October 2024
4
Contacts
Investors / Shareholders
Nigel Broomham
Chief Executive Officer
P: +61 (0)8 6109 6689
E: info@batteryage.au
Media
Kelly-Jo Fry
P: +61 (0)8 6109 6689
E: info@batteryage.au
Forward-Looking Statement
This announcement may contain certain forward-looking statements and projections. Such forward looking
statements/projections are estimates for discussion purposes only and should not be relied upon. Forward looking
statements/projections are inherently uncertain and may therefore differ materially from results ultimately achieved.
Battery Age Minerals Limited does not make any representations and provides no warranties concerning the
accuracy of the projections and disclaims any obligation to update or revise any forward-looking statements/projects
based on new information, future events or otherwise except to the extent required by applicable laws. While the
information contained in this report has been prepared in good faith, neither Battery Age Minerals Limited or any of
its directors, officers, agents, employees or advisors give any representation or warranty, express or implied, as to
the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this
announcement.
Compliance Statement
This announcement contains information on the Bleiberg Project extracted from an ASX market announcements
dated 8 December 2022, 2 February 2023, 13 July 2023, 26 February 2024, 26 March 2024, 23 April 2024 and 16
May 2024 released by the Company and reported in accordance with the 2012 edition of the “Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). The original market
announcement is available to view on www.batteryage. au and www.asx.com.au. Battery Age is not aware of any
new information or data that materially affects the information included in the original market announcement and,
in the case of estimates of Mineral Resources (as that term is defined in the JORC Code) that all material
assumptions and technical parameters underpinning the estimates in the relevant market announcement continue
to apply and have not materially changed.
References:
1.
Schroll,e. (2006). Neues zur Genese der Blei-Zink Lagerstätte Bleiberg. Carinthia II 196./116. Jahrgang Seiten 483-500
Klagenfurt 2006
2.
Cerny,I. (1991). Lagerstättenforschung in Kärnten Neuergebnisse und Aspekte für die Zukunft. Carinthiall 181./101.
Jahrgang S. 119-129 Klagenfurt 1991, Cerny,I. and Schroll,E. (1995). Spezialmetallgehalte in ZnS-Konzentraten der
Lagerstätte Bleiberg-Kreuth. Arch. f. Lagerst.forsch. Geol. B.-A. ISSN 0253-097X Band 18 S. 5–33 Wien, Juni 1995;
Schroll,e. (2006). Neues zur Genese der Blei-Zink Lagerstätte Bleiberg. Carinthia II 196./116. Jahrgang Seiten 483-500
Klagenfurt 2006
3.
Germanium-based transistors for future high performance and low ... (2015) TSMC Logic. Available at:
https://research.tsmc.com/page/high-mobility-channel/14.html.
4.
Refer Thomson Reuters “China's rare earths dominance in focus after it limits germanium and gallium exports”, 5 July
2023, refer CNN “China hits back in chip war, imposing export curbs on crucial raw materials” 3 July 2023.
5.
Multi-Met (2023) Bleiberg Project - Multi-Met, Multi. Available at: https://multimetdev.com/projects/bleiberg-project/
6.
Leach. D, Taylor. R, Fey. D et al.(2010), , A deposit model for Mississippi Valley-Type lead-zinc ores, USGS Scientific
Investigations Report 2010-5070-A
7.
Schor, D. (2021) TSMC details 5 nm, WikiChip Fuse. Available at: https://fuse.wikichip.org/news/3398/tsmc-details-5-nm/
(Accessed: 25 February 2024).
8.
5NM technology, Taiwan Semiconductor Manufacturing Company Limited. Available at:
https://www.tsmc.com/english/dedicatedFoundry/technology/logic/l_5nm
9.
Refer to earn-in terms and structure set out in the Company’s Prospectus dated 7 December 2022, and announcement 16
May 2024.
10.
11.
Strategic Metals Invest; https://strategicmetalsinvest.com/germanium-prices/, August 2024.
Germanium,
https://tradingeconomics.com/commodity/germanium#:~:text=Germanium%20increased%209,150%20CNY/Kg%20or;
September 2024.
ASX Announcement
Released 1 October 2024
5
Share your feedback
Discover