September 2025 Quarterly Activities Report
Battery Age Delivers Key Milestones at Bleiberg and El Aguila as Exploration
Accelerates Across Strategic Portfolio
Key highlights:
• Drilling Advances at Bleiberg Zinc–Germanium Project: Battery Age’s maiden
diamond drilling campaign commenced in July, marking the first modern exploration in
this historic high-grade district in decades.
• High-Priority Gold–Silver Targets Defined at El Aguila: Extensive geophysics and
geochemical sampling identified multiple kilometre-scale gold-silver anomalies.
Environmental approvals and drill permitting were submitted, with maiden drilling
authorisation subsequently granted post-quarter-end.
• Falcon Lake Expands Critical-Metals Potential: Multi-element review confirmed
enrichment in rubidium, caesium, tantalum and gallium alongside thick, high-grade
lithium intercepts. Only five of thirty high-priority targets have been drill-tested to date.
• Strategic Consolidation Achieved: Subsequent to quarter-end, Battery Age secured
100% ownership of the Falcon Extension properties in Ontario, consolidating a
contiguous 51 km² district-scale lithium corridor.
• $3 Million Placement Completed: A strongly supported two-tranche placement raised
$3.0 million to fund drilling at Bleiberg and El Aguila.
• New US Exposure, Apex Germanium Project: Post-quarter, Battery Age staked 129
mining claims covering ~2,660 acres adjacent to the historic Apex Mine in Utah,
securing its first germanium–gallium asset in North America and extending the
Company’s Trans-Atlantic Critical Metals Strategy across key Western supply chains.
• University of Sydney Collaboration Executed: Following the quarter, Battery Age
formalised a consultancy agreement and exclusive option with the University of
Sydney’s School of Chemical and Biomolecular Engineering to test advanced
germanium recovery technologies, strengthening the Company’s potential downstream
processing and recycling capability across its Bleiberg and Apex portfolios.
Battery Age Minerals Ltd (ASX: BM8, “Battery Age”, or “the Company”) is pleased to present
this Quarterly Activities Report, providing a summary of the exploration, corporate, and
operational milestones achieved during the three-month period ending 30 September 2025
(“Quarter”), across the Company’s exploration portfolio in Austria, Argentina, and Canada.
ASX Announcement
Released 31 October 2025 3
Project Activities
Bleiberg Zinc-Germanium Project (Bad Bleiberg, Austria)
Overview
Battery Age commenced and continued its maiden diamond drilling campaign at the Bleiberg
Zinc–Germanium Project during the quarter, representing the first modern exploration program
undertaken in this historic high-grade district since the 1990s.
The program targets multiple historically referenced zones of stratabound and breccia-hosted
zinc-lead-germanium mineralisation across a 10 km corridor within the Bleiberg mining district.
Drilling is focused on testing areas proximal to historic workings where previous production
records reported concentrate grades up to ~1,500 g/t germanium and ~63 % zinc, among the
highest known globally.
This campaign marks a major step forward in unlocking the development potential of one of
Europe’s most strategically important critical-metal assets. Drilling activities continue in parallel
with ongoing stakeholder engagement and environmental management programs undertaken
in accordance with Austrian regulatory requirements.
The Bleiberg Project remains central to Battery Age’s European critical-minerals strategy,
providing the Company with a unique opportunity to establish a secure, EU-based source of
germanium, a critical element for semiconductors, fibre optics, and defence technologies.
Figure 1: Bleiberg Zinc Lead Germanium Project located in the state of Carinthia, Austria.
ASX Announcement
Released 31 October 2025 4
Figure 2: Bleiberg maiden drilling program – permitted drilling locations
Forward work program
• Three historically referenced high-grade zones west of the Sattler Shaft, Josefischolle,
Riedhartscholle and Kalkscholle – which were historically reported to contain some of
the highest Zn–Ge grades within the wider Bleiberg corridor, are being incorporated
into BM8’s next drilling permit application, scheduled for lodgement in Q4 2025.
Figure 3: Battery Age exploration tenure, historic mining corridor and production shafts, including Antoni shaft
(X474158.8; Y 5165543.6). Inset table demonstrates historical data for the Bleiberg Mine from previous
workings1
. 100% staked claims identified in blue & orange (Bleiberg West concessions) and existing earn-in
claims shown in red (Bleiberg concessions).
ASX Announcement
Released 31 October 2025 5
El Aguila Gold-Silver Project (Santa Cruz, Argentina)
Permitting and targeting
BM8 completed an integrated targeting campaign at El Aguila, combining:
• 838 additional soil samples collected on 50 m stations and 100–200 m line spacing;
• 327 line-km of new high-resolution ground magnetics over ~54 km²;
• 58 line-km of gradient IP / resistivity; and
• compilation of >1,400 historic soil assays and extensive high-grade rock chips.
This work defined a pipeline of kilometre-scale gold–silver targets, including Profundo, Aguila
South Central, Aguila Main East Extension, Verbena, and Lagoon. These targets are
characterised by coincident precious-metal anomalism (soil Au to 134 ppb and Ag to 35.6
ppm), elevated pathfinders (As to 428 ppm), and strong geophysical responses
(chargeability/resistivity/magnetic trends), many of which have not yet been drill tested.
Several of these anomalies directly extend or link known high-grade systems:
• Aguila Main / Aguila South: surface rock chips include up to 174.6 g/t Au and 4,739 g/t
Ag, and historical intercepts include 0.55 m @ 40.55 g/t Au and 7.0 m @ 2.48 g/t Au
(incl. 1.7 m @ 9.02 g/t Au).
• Aguila Main East Extension / San Cristóbal linkage: geochemistry and IP outline ~1.2
km of continuous northeast-trending anomalism, highlighting the potential for a district-
scale mineralised corridor rather than isolated shoots.
Environmental Impact Assessment (EIA) and drill planning
During the quarter BM8 finalised environmental baseline work, submitted its EIA and lodged
its maiden drilling application with the Santa Cruz Mining Ministry. All logistics including RC
rig, field geologists, technicians, sample preparation route (ALS Global, Mendoza), comms and
environmental monitoring protocols were prepared so drilling can commence rapidly on
approval.
Subsequent to quarter-end, the Santa Cruz Mining Ministry issued BM8 with initial drilling
authorisation for El Aguila, confirming provincial support for the program. The ~2,000 m RC
program is designed to:
• Infill around known high-grade shoots at Aguila Main and Aguila South to generate
early resource-style geological control;
• Test strike and depth extensions for potential ounces growth; and
• Drill-test “blue-sky” structural targets such as Verbena and San Cristóbal, where
coincident gold-in-soil and IP signatures suggest larger-scale vein systems under
shallow cover.
ASX Announcement
Released 31 October 2025 6
Figure 4: El Aguila – located in the rich gold and silver mining region of Santa Cruz. Proximal to large scale operating
Au and Ag mines.
Figure 5: Geophysical and surface geochemistry survey areas
ASX Announcement
Released 31 October 2025 7
Figure 6: El Aguila project geology. Kilometre scale interpreted mineralised veins outlined in red.
Falcon Lake Lithium Project (Ontario, Canada)
Technical review
BM8 completed a comprehensive multi-element database review of Falcon Lake drill core and
pulps. The work confirmed that the spodumene-bearing pegmatites at Falcon Lake are highly
fractionated LCT pegmatites, consistently enriched in high-value critical metals in addition to
lithium:
• Rubidium up to 11,400 ppm (mean 1,872 ppm across pegmatite samples);
• Caesium up to 2,600 ppm;
• Tantalum up to 2,300 ppm; and
• Gallium up to 95.6 ppm.
These critical metal signatures sit alongside thick, high-grade lithium intercepts such as:
• 54.1 m @ 1.74% Li₂O (hole 24FL-107);
• 55.95 m @ 1.47% Li₂O (hole 24FL-108);
• 43.0 m @ 1.62% Li₂O (hole 24FL-114); and
• 22.55 m @ 1.74% Li₂O (hole 24FL-113).
Geological significance
This geochemical signature - lithium plus rubidium/caesium/tantalum/gallium - is characteristic
of evolved LCT pegmatite systems comparable to other tier-one Canadian hard-rock lithium
camps. It also introduces strategic upside beyond lithium alone, given rubidium, caesium,
tantalum and gallium are increasingly important in advanced electronics, aerospace, optics
and AI hardware supply chains.
ASX Announcement
Released 31 October 2025 8
Exploration maturity
Despite delivering some of the Project’s best-ever lithium intercepts during 3Q FY2025, BM8
has drill tested only 5 of 30 high-priority targets defined by geophysics and surface
mapping/sampling, leaving the broader 5 km Falcon Lake corridor vastly under-explored and
open at depth and along strike.
Project consolidation
Subsequent to the quarter-end, BM8 exercised the final stage of its option agreement to
increase its interest in the Falcon Extension properties from 80% to 100%. Consideration for
the final stage comprised CAD$15,000 in cash and 250,000 BM8 shares at $0.40 per share,
consistent with the staged earn-in terms agreed in 2023.
This transaction links Falcon Main, Falcon North and Falcon Extension into a single contiguous
51 km² land position across the Caribou O’Sullivan Greenstone Belt in Ontario, the same belt
that has already delivered BM8’s thick, high-grade spodumene intercepts. Consolidation
materially strengthens BM8’s control of a district-scale, lithium-endowed corridor with multi-
commodity upside, and positions Falcon Lake for future resource definition drilling when lithium
market sentiment improves.
Apex Germanium Gallium Project (Utah, USA)
Subsequent to the end of the quarter, Battery Age announced the staking of 129 unpatented
lode mining claims covering approximately 2,660 acres adjacent to the historic Apex Mine in
southern Utah, USA, marking the Company’s first germanium- and gallium-focused asset in
North America.
The Apex Mine – also known as the Dixie Mine – was the world’s first operation developed
primarily for germanium and gallium production, historically reporting grades up to 0.7 % Ge
(7,000 g/t) and 2 % Ga (20,000 g/t), together with significant silver by-production. Battery Age’s
newly secured tenure captures the key structural corridors and stratigraphic horizons
associated with the Apex Fault Zone and the brecciated Callville Limestone–Pakoon Dolomite
contact, the principal host to mineralisation at the historic mine.
Apex represents one of the only known high-grade Ge–Ga systems in the United States and
is strategically positioned amid ongoing U.S. initiatives to re-establish secure domestic supply
chains for semiconductor-critical metals. The Project directly complements the Company’s
Bleiberg Project in Austria, establishing a strong, Western-aligned germanium footprint
spanning the United States and the European Union.
The addition of Apex North and South forms a cornerstone of Battery Age’s Trans-Atlantic
Critical Metals Strategy, progressing the Company’s goal to develop an integrated germanium
supply platform across discovery, extraction and downstream technology development. The
initiative is further supported by BM8’s collaboration with the University of Sydney, which is
testing advanced germanium recovery and recycling technologies for potential application
across the Company’s project portfolio.
ASX Announcement
Released 31 October 2025 9
University of Sydney Collaboration
Subsequent to the end of the quarter, Battery Age executed a Consultancy Agreement and
exclusive option with the University of Sydney’s School of Chemical and Biomolecular
Engineering, led by Professor Kourosh Kalantar-Zadeh, Dr Francois Allioux and Mr Luis
Gustavo Campos, to test and assess advanced recovery techniques for germanium.
The project will evaluate innovative electromagnetic-based processing methods for
germanium extraction, with arrangements allowing Battery Age to access the research
outcomes for testing and evaluation. Should BM8 wish to pursue long-term use, the Company
holds an exclusive option to negotiate a licence to use both any resulting project IP and
specified University background IP, limited to the field of germanium extraction.
This initiative provides Battery Age with exposure to cutting-edge recovery and recycling
research, complementing its exploration and development programs and supporting its
broader strategy to establish a vertically integrated germanium supply platform across its
Bleiberg and Apex projects.
Jesse Lake Lithium Project (Ontario, Canada)
No exploration activities were conducted during the Quarter.
King Tut Project (Argentina)
No exploration activities were conducted during the Quarter.
Bloom Lake Project (Bloom Lake, Canada)
No exploration activities were conducted during the Quarter.
Next Steps
• Ongoing drilling at Bleiberg: Diamond drilling continues at the Company’s flagship
Zinc–Germanium Project in Austria.
• Maiden drilling at El Aguila: Preparations underway for the commencement of the
Company’s first gold–silver drilling program in Santa Cruz, Argentina, following receipt
of regulatory approvals post-quarter. Drilling to commence this quarter.
• Apex Project integration: Planning of initial field reconnaissance and baseline studies
at the newly staked Apex Germanium–Gallium Project in Utah to define priority targets
for follow-up exploration.
• University of Sydney collaboration: Advancement of the Company’s germanium
extraction and recycling research program, with direct relevance to both Bleiberg and
Apex.
• Strategic partnerships and downstream engagement: Continued evaluation of
collaboration opportunities with EU and U.S. specialty chemical refiners, technology
manufacturers and strategic investors to support Battery Age’s vertically integrated
germanium platform.
ASX Announcement
Released 31 October 2025 10
Battery Age remains focused on advancing a diversified portfolio of critical-mineral and
precious-metal assets across Austria, Argentina, Canada and the United States. With drilling
ongoing at Bleiberg, maiden drilling at El Aguila imminent, and the Apex Project adding North
American exposure, the Company is well positioned to deliver value-accretive milestones
through the remainder of 2025.
Corporate and Finance
Corporate
Battery Age announced on 2 July a $3 million (before costs) placement to investors via the
issue of 60,000,000 ordinary shares at $0.05 per share, together with one free-attaching option
for every three new shares subscribed for under the placement (exercisable at $0.10 with a
three year expiry), to advance exploration activities and support working capital expenditure.
Business Development
The Company continues to actively identify and review potential strategic opportunities that
are value accretive and complement existing assets to build a portfolio of highly prospective
projects across a suite of commodities in-line with the Company’s strategic objectives. There
is no certainty that current discussions will result in new project acquisitions.
Appendix 5B
The Appendix 5B quarterly cashflow report for the Quarter is submitted separately.
The Group closed the Quarter with a cash balance of $1,115k. Exploration expenditure during
the Quarter totalled $1,105k (unaudited).
The Company currently holds 34.5m shares in Equinox Resources (EQN) which has a cash
value at the end of the Quarter of: $2.76m at $0.08 per share (share price 30 September 2025).
Payments to Related Parties
Pursuant to section 6 of the Company’s Appendix 5B, and as required under ASX Listing Rule
5.3.5, during the Quarter the Company paid $32k to the Directors for remuneration.
Capital Structure
The capital structure at the end of the Quarter was as follows:
• 121,891,823 Ordinary Shares.
• 44,404,923 Options.
• 1,535,000 Performance Rights.
• 7,000,000 Performance Shares.
ASX Announcement
Released 31 October 2025 11
Interests in Mining Tenements as at 30 September 2025
Location Tenement Reference
Interest during
Quarter
Interest at the end
of Quarter
Western Australia1
M47/1450 (0.09%) 22.22%
Canada, Bloom Lake 221266, 221267, 229223
243759, 251792, 251793
251794, 287807, 308044
325202, 336173, 582713
582714, 716167, 716168,
716165, 716166, 716170,
716171, 716169
- 100%
Canada, Falcon Lake
- Central
727287 to 727384
2
668831, 670166, 670168,
721084, 721085, 746214,
754668
3
106057-106058, 121357-
121360, 122094, 132858-
132859, 134102, 136948,
136962, 142489, 148810,
164547-164548, 166603,
178073, 179345, 185376-
185377, 186114-186115,
208573, 209065, 215331,
224637-224639, 237714-
237716, 244810, 246081,
252181, 256393-256395,
274457, 281913, 289275,
291550, 301417-301418,
302155, 311782-311784
-
-
-
100%
100%
90%
- West 881301 - 100%
- East 881299, 881300 - 100%
Canada, Jessie Lake 834651 – 834704
835652 - 835724
- 100%
Austria, Bleiberg4
EL 476/22 (BB1) – 591/22
(BB116)
1524/23 (1/23) – 1583/23
(60/23) 1413/24 – 1542/24
(545/24 - 674/24)
-
-
51%
100%
Austria, Hochibir 774/24 (1/24) - 1387/24
(614/24)
1389/24 (615/24) – 1412/24
(638/24)
- 100%
Argentina5
168-L-1939 - 100%
66-C-2005 - 100%
28-L-2011 - 100%
1. Battery Age’s interest in the Hamersley Iron Ore Project is held indirectly by way of its investment held in Equinox
Resources Limited. Reduced interest as a result of dilution due to equity placements completed by EQN during the period.
2. In October 2023, the Company acquired a 2 year option over these tenements, (i) an initial 40% interest by making a cash
payment of CAD$100k and issuing 250k fully paid ordinary shares (completed); (ii) acquisition of an addition 40% interest
by making a cash payment of CAD$75k and issuing 250k fully paid ordinary shares on or before the first anniversary of
stage (i) (completed) and (iii) acquisition of an addition 10% interest by making a cash payment of CAD$15k and issuing
250k fully paid ordinary shares on or before the second anniversary of stage (i) (outstanding). The Company will retain
ASX Announcement
Released 31 October 2025 12
the respective % interest acquired under the respective staged option, in the event that the subsequent option(s) are not
exercised.
3. The Company may acquire the final 10% of the above identified Falcon Lake tenements by paying an amount equal to
the lower of (i) the price determined by an independent valuation, or (ii) A$2,000,000.
4. The Company may acquire a further 14% interest (total 65%) in the above Bleiberg tenements within 36 months of
acquiring the abovementioned 36% interest by incurring an additional C$3,500,000 in expenditure on the project.
The Company may acquire the final 15% interest (total 80%) in the above Bleiberg tenements within 6.5 years from
executing the Bleiberg Addendum Agreement upon completion of a Bankable Feasibility Study that is compliance to JORC
and indicates the project will have a production rate of at least 100,000 tonnes per year.
5. As announced on 31 January 2025, the Company has entered into a Farm-In Agreement with Fredonia Mining Inc. to
earn up to 80% to 100% ownership of the El Aguilia Project in the Santa Cruz province, Argentina. Refer to announcement
dated 31 January 2025 for full terms and conditions of the Farm-In Agreement.
- END -
Release authorised by the Board of Battery Age Minerals Ltd.
Contacts
Investors / Shareholders
Nigel Broomham
Chief Executive Officer
P: +61 (0) 8 6109 6689
E: info@batteryage.au
Media
Kelly-Jo Fry
P: +61 (0) 8 6109 6689
E: info@batteryage.au
ASX Announcement
Released 31 October 2025 13
References:
1. Refer to earn-in terms and structure set out in the Company’s Prospectus dated 7 December 2022, and announcement 16
May 2024.
2. Schroll,e. (2006). Neues zur Genese der Blei-Zink Lagerstätte Bleiberg. Carinthia II 196./116. Jahrgang Seiten 483-500
Klagenfurt 2006
3. Cerny,I. (1991). Lagerstättenforschung in Kärnten Neuergebnisse und Aspekte für die Zukunft. Carinthiall 181./101.
Jahrgang S. 119-129 Klagenfurt 1991, Cerny,I. and Schroll,E. (1995). Spezialmetallgehalte in ZnS-Konzentraten der
Lagerstätte Bleiberg-Kreuth. Arch. f. Lagerst.forsch. Geol. B.-A. ISSN 0253-097X Band 18 S. 5–33 Wien, Juni 1995;
Schroll,e. (2006). Neues zur Genese der Blei-Zink Lagerstätte Bleiberg. Carinthia II 196./116. Jahrgang Seiten 483-500
Klagenfurt 2006
4. Germanium-based transistors for future high performance and low ... (2015) TSMC Logic. Available at:
https://research.tsmc.com/page/high-mobility-channel/14.html.
5. Multi-Met (2023) Bleiberg Project - Multi-Met, Multi. Available at: https://multimetdev.com/projects/bleiberg-project/
6. Leach. D, Taylor. R, Fey. D et al.(2010), , A deposit model for Mississippi Valley-Type lead-zinc ores, USGS Scientific
Investigations Report 2010-5070-A
7. Schor, D. (2021) TSMC details 5 nm, WikiChip Fuse. Available at: https://fuse.wikichip.org/news/3398/tsmc-details-5-nm/
(Accessed: 25 February 2024).
Compliance Statement
This report contains information on the Falcon Lake and Jessie Lake Projects extracted from an ASX market announcement dated
8 December 2022, 2 February 2023, 13 June 2023, 4 July 2023, 26 July 2023, 31 July 2023, 2 August 2023, 16 August 2023, 6
September 2023, 14 September 2023, 5 October 2023, 10 October 2023, 16 October 2023, 25 October 2023, 1 November 2023,
30 November 2023, 13 December 2023, 18 April 2024, 8 July 2024, 11 July 2024, 12 August 2024, 12 September 2024, 20
November 2024, 22 January 2025, 28 January 2025 and 14 August 2025 released by the Company and reported in accordance
with the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC
Code).
This report contains information on the Bleiberg and Hochobir Projects extracted from an ASX market announcement dated 8
December 2022, 2 February 2023, 13 July 2023, 21 August 2023, 26 February 2024, 26 March 2024, 23 April 2024, 16 May 2024,
29 August 2024, 18 December 2024, 22 January 2025, 29 January 2025 and 17 April 2025 released by the Company and reported
in accordance with the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves” (JORC Code). The original market announcement is available to view on www.batteryage.au and www.asx.com.au.
Battery Age is not aware of any new information or data that materially affects the information included in the original market
announcement.
This report contains information on the El Aguila Project extracted from an ASX market announcement dated 31 January 2025,
28 May 2025 and 5 September 2025 released by the Company and reported in accordance with the 2012 edition of the
“Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). The original market
announcement is available to view on www.batteryage.au and www.asx.com.au. Battery Age is not aware of any new information
or data that materially affects the information included in the original market announcement.
Forward Looking Statements
Information included in this release constitutes forward-looking statements. Often, but not always, forward looking statements
can generally be identified by the use of forward looking words such as “may”, “will”, “expect”, “intend”, “plan”, “estimate”,
“anticipate”, “continue”, and “guidance”, or other similar words and may include, without limitation, statements regarding plans,
strategies and objectives of management, anticipated production or construction commencement dates and expected costs or
production outputs. Forward looking statements inherently involve known and unknown risks, uncertainties and other factors
that may cause the Company’s actual results, performance and achievements to differ materially from any future results,
performance or achievements. Relevant factors may include, but are not limited to, changes in commodity prices, foreign
exchange fluctuations and general economic conditions, increased costs and demand for production inputs, the speculative
nature of exploration and project development, including the risks of obtaining necessary licenses and permits and diminishing
quantities or grades of reserves, political and social risks, changes to the regulatory framework within which the company
operates or may in the future operate, environmental conditions including extreme weather conditions, recruitment and retention
of personnel, industrial relations issues and litigation. Forward looking statements are based on the Company and its
management’s good faith assumptions relating to the financial, market, regulatory and other relevant environments that will exist
and affect the Company’s business and operations in the future. The Company does not give any assurance that the
assumptions on which forward looking statements are based will prove to be correct, or that the Company’s business or
operations will not be affected in any material manner by these or other factors not foreseen or foreseeable by the Company or
management or beyond the Company’s control. Although the Company attempts and has attempted to identify factors that
would cause actual actions, events or results to differ materially from those disclosed in forward looking statements, there may
be other factors that could cause actual results, performance, achievements or events not to be as anticipated, estimated or
intended, and many events are beyond the reasonable control of the Company. Accordingly, readers are cautioned not to place
undue reliance on forward looking statements. Forward looking statements in these materials speak only at the date of issue.
Subject to any continuing obligations under applicable law or any relevant stock exchange listing rules, in providing this
information the company does not undertake any obligation to publicly update or revise any of the forward-looking statements or
to advise of any change in events, conditions or circumstances on which any such statement is based.
ASX
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
BATTERY AGE MINERALS LTD
ABN Quarter ended (“current quarter”)
80 085 905 997 30 September 2025
Consolidated statement of cash flows Current quarter
$A’000
Year to date (3
months)
$A’000
1. Cash flows from operating activities
- -
1.1 Receipts from customers
1.2 Payments for
(1) (1)
(a) exploration & evaluation
(b) development - -
(c) production - -
(d) staff costs (242) (242)
(e) administration and corporate costs (427) (427)
1.3 Dividends received (see note 3) - -
1.4 Interest received - -
1.5 Interest and other costs of finance paid - -
1.6 Income taxes paid - -
1.7 Government grants and tax incentives - -
1.8 Other (provide details if material - -
1.9 Net cash from / (used in) operating
activities
(670) (670)
2. Cash flows from investing activities
- -
2.1 Payments to acquire or for:
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) exploration & evaluation (1,065) (1,065)
(e) investments - -
(f) other non-current assets - -
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (3
months)
$A’000
2.2 Proceeds from the disposal of:
- -
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) investments - -
(e) other non-current assets - -
2.3 Cash flows from loans to other entities - -
2.4 Dividends received (see note 3) - -
2.5 Other (provide details if material) - -
2.6 Net cash from / (used in) investing
activities
(1,065) (1,065)
3. Cash flows from financing activities
3,000 3,000
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
- -
3.3 Proceeds from exercise of options - -
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
(184) (184)
3.5 Proceeds from borrowings - -
3.6 Repayment of borrowings (7) (7)
3.7 Transaction costs related to loans and
borrowings
- -
3.8 Dividends paid - -
3.9 Other (provide details if material) - -
3.10 Net cash from / (used in) financing
activities
2,809 2,809
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period
41 41
4.2 Net cash from / (used in) operating
activities (item 1.9 above)
(670) (670)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
(1,065) (1,065)
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
2,809 2,809
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 3
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (3
months)
$A’000
4.5 Effect of movement in exchange rates on
cash held
- -
4.6 Cash and cash equivalents at end of
period
1,115 1,115
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 1,115 41
5.2 Call deposits - -
5.3 Bank overdrafts - -
5.4