Quarterly Activities Report
Summary
Battery Age Minerals Ltd (ASX: BM8, “Battery Age”, or the “Company”) wishes to provide the
following summary of activities undertaken during the quarter ending 30 June 2023 (“June
Quarter”).
Key highlights for the June Quarter include the following:
•
Commencement of Maiden Drill Programme at the Falcon Lake Lithium Project
•
Acquisition of the Jessie Lake Lithium Project in Ontario, Canada
•
Successful completion of Loyalty Option Offer to reward shareholder loyalty
•
Completion of maiden fieldwork programme at the Tidili Copper Project.
•
Additional claims staked at the Bleiberg Zinc Lead Germanium Project which
covers potential extensions of the historic mine mineralisation.
Commencement of Maiden Drill Programme at Falcon Lake (90% - 100% interest,
Canada)
During the June Quarter, the Company commenced its maiden drill programme at the highly
prospective Falcon Lake Lithium Project. Falcon Lake is located northeast of Thunder Bay on
the Caribou O’Sullvan Greenstone Belt and ideally located close to key infrastructure including
road, rail and proposed green power.
Battery Age Minerals Ltd
ASX: BM8
ACN 085 905 997
batteryageminerals.au
T: +61 (8) 6109 6689
E: info@batteryage.au
Level 50, 108 St Georges Terrace
Perth, WA 6000
PO Box 7310, Cloisters Square PO, WA 6850
1
Figure 1 - Falcon Lake & Jessie Lake Project Location
Falcon Lake hosts three known historical lithium occurrences as mapped by the Ontario
Geological Survey along with significant historical drilling results including intercepts of 24m
@ 1.43% Li20 1
1 For historical e xp loration re su lts re fe r to ASX Anno unce m e nt “Co m p any Prosp e ctus” Se ction 3.7.2 d ate d 7 De ce m b e r 2022
ASX Announcement
Released Released 31 July 2023
2
Figure 2 - Historical Drill Intercepts at Falcon Lake
The maiden drill campaign consists of ~5,000 meters of NQ drilling to be carried out by
Rodren Drilling supervised by Battery Age personnel and supported by Coast Mountain
Geological.
The purpose of the programme is to further understand the scale of mineralisation of known
lithium occurrences, geological setting and the structural controls, as well as explore the
potential of recently mapped spodumene bearing pegmatites at Falcon Lake. This maiden
drill programme will inform Battery Age and generate further drilling targets such that
additional drilling can be carried out in the near future.
Figure 3 - Rodren Drilling at Falcon Lake
ASX Announcement
Released Released 31 July 2023
3
Staking of Jessie Lake Lithium Project (100% interest, Canada)
During the June Quarter, Battery Age expanded its land holding in the Ontario region with the
strategic staking of an additional 27km2 of prospective lithium tenure, the Jessie Lake Project.
Figure 4 - Jessie Lake Project location map
The project area is strategically situated south of the Forgan Lake Lithium Occurrence and is
in close proximity to the Georgia Lake pegmatite field.
The Jessie Lake Project holds potential for Lithium-Caesium-Tantalum (LCT) pegmatites and
is host to extensive metasedimentary units of the Quetico Subprovince, the same bedrock that
host the Georgia Lake and Forgan Lake LCT pegmatites.
ASX Announcement
Released Released 31 July 2023
4
The Company aims to leverage this prospective ground to expand its land holding in Ontario
and diversify its presence in a region known for its proven mineral resources, including Rock
Tech Lithium Gorgia Lake project, which has a NI43-101 reported a mineral resource of 10.Mt
@0.88% Li2O (Indicated) and 4.2Mt @1% Li2O (Inferred) 2.
The Company intends to prospect the Jesse Lake Lithium tenure further, later in the year.
Execution of Early Exploration Agreements
During the quarter the Company executed key agreements with its First Nations Groups
Whitesand, AZA and Aroland.
Battery Age is grateful for the support and endorsement of its First Nation communities and is
committed to continuing to work closely with them throughout all stages of the project.
The Company believes that, by working collaboratively with Indigenous communities, it can
create long-lasting and mutually beneficial partnerships that generate significant economic
opportunities and contribute to the sustainable development of local communities.
Battery Age is grateful for the supportive collaboration and progressive discussions it has held
with Aroland and AZA since first meeting the groups in late 2022. The Company would like to
thank respective Chiefs and Council for their assistance in finalising this agreement.
Battery Age is grateful for the support and endorsement of Whitesand First Nation and is
committed to continuing to work closely with Whitesand throughout all stages of the project.
The Company would like to thank Chief Gustafson and the council for their ongoing support.
We feel that we are strongly supported by the groups and have enjoyed our engagement to
date and look forward to the development of strong relationships moving forward.
Successful Completion of Loyalty Option Offer
During the June Quarter, the Company completed its non-renounceable entitlement offer of
25,656,023 loyalty options as announced on 23 May 2023. The Loyalty Offer offered eligible
shareholders registered on the Record Date the ability to subscribe for Loyalty Options on the
basis of one (1) Option for every three (3) Shares held at an issue price of $0.005 per Option
to raise up to approximately $128,000 (before costs). Loyalty options have an exercise price
of $0.50 per Option and expiration date of 27 June 2026.
If exercised, these Loyalty Options will provide the Company with additional capital of up to
$12.8 million.
Tidili Project (85% interest, Morocco)
During the June Quarter the Company completed its maiden field work programme at the
highly prospective Tidili Copper Project in Morocco.
The maiden field work programme was designed to verify historical works and to undertake
further mapping and sampling, laying the foundations for the development of a more expansive
exploration campaign which will be executed later in the year.
2 Rock Tech Lithium Inc (TSX-V: RCK) Investor Presentation June 2023.
ASX Announcement
Released Released 31 July 2023
5
Battery Age engaged experienced consultant geologist Dr Simon Dorling of Rock Domain
Consulting to progress the exploration and evaluation of the Tidili Project.
Dr Dorling has extensive experience in exploration, development and mining spanning base
metals, precious metals, energy minerals and industrial minerals, having previously served as
Principal Geologist at CSA Global.
Dr Dorling brings specialist technical knowledge to the project and will work with the Battery
Age team to execute exploration programs at the Tidili Project.
Figure 5 - Dr Simon Dorling conducting fieldworks for BM8 at Tidili
ASX Announcement
Released Released 31 July 2023
6
During his site visit Dr Dorling mapped the project site and collected rock chip samples that
were sent for assay to determine mineralisation across the property.
Figure 6 - Project Location
Bleiberg Project (15% interest with a right to earn up to 80%, Austria)
The Company is aware of the announcement by Chinese authorities of new restrictions and
controls with respect to the export of Germanium and Gallium from China to other countries.
Bleiberg was a globally significant producer of Germanium and Gallium with historical grades
recorded of up to 200g/t Germanium at the Bleiberg mine.
Following early desktop assessments, the Company identified a trend hosting potential
extensions of the mineralisation to the west north-west of the old Bleiberg mine workings. In
light of this, post the Quarter end, the Company secured an extended land position by staking
additional exploration licences. Documentation for the staking process has been completed
and submitted to the Austrian Mining Department.
ASX Announcement
Released Released 31 July 2023
7
Figure 7 Identified potential mineralised trend located along strike from historical workings. Inset
table demonstrates historical operational data for the Bleiberg Mine from previous workings) .
Figure 8 New 100% staked claims identified in blue and existing earn-in claims shown in red.
ASX Announcement
Released Released 31 July 2023
8
Discussions have also progressed with Austrian based governmental and educational bodies
regarding the collation of all available data relating to the Bleiberg Project.
It is anticipated a systematic exploration programme will be commenced later in the year.
King Tut Project (100% interest, Argentina)
No exploration activities were conducted during the June Quarter.
Bloom Lake Project (100% interest, Canada)
No exploration activities were conducted during the June Quarter.
Finance
The Appendix 5B quarterly cashflow report for the June Quarter is submitted separately.
The Group closed the June Quarter with a cash balance of $3,200k. Exploration expenditure
during the June Quarter totalled $720k (unaudited).
Use of Funds
A comparison of the Company’s actual expenditure since readmission to the Official List of
ASX to 30 June 2023 against estimated expenditure in the use of funds statement in the
Prospectus is set out below in accordance with ASX Listing Rule 5.3.4. The table also shows
the Company’s expenditure for the June Quarter, as required by ASX Listing Rule 5.3.1:
Tidili Project
Falcon Lake Project
2023
Prospectus
1,295,000
2,050,000
Use until
30 Jun 23
495,665
1,240,356
Bloom Lake Project
30,000
-
King Tut Project
Bleiberg Project
100,000
1,215,000
10,972
143,968
Administration and corporate costs
Costs associated of the Public Offer
1,328,000
658,000
1,103,945
603,094
343,000
220,577
7,019,000
3,818,575
Working Capital & M&A budget for complementary assets
The material use of funds variance explanations are outlined below:
•
Variances to operational expenditures are as a result of the accelerated drilling
campaign at Falcon Lake. The maiden drill campaign of 5,000m at Falcon Lake has
deployed a 2 shift campaign with drilling continuing 24 hours a day. This has seen an
accelerated spend attributed to Falcon Lake exploration as this requires a higher level
of operational manning and supervision.
•
Variances to administration and corporate cost are as a result of the accelerated
operational campaign being deployed at Falcon Lake. A larger team has been
engaged to manage and advance the expanded operational drilling campaign at
Falcon Lake. Additional travel to site to advance the project along with a greater level
of operational administration has seen an increased spend in this area.
ASX Announcement
Released Released 31 July 2023
9
Variances in expenses of the offer relate to higher than estimated audit fees and legal
fees.
•
Payments to Related Parties
Pursuant to section 6 of the Company’s Appendix 5B, and as required under ASX Listing Rule
5.3.5, during the June Quarter the Company paid $56k to current Directors for remuneration.
Capital Structure
The capital structure at the end of the June Quarter is as follows:
•
76,966,493 Ordinary Shares.
•
41,906,023 Options.
•
1,000,000 Performance Rights.
•
7,000,000 Performance Shares.
The Company issued 25,656,023 Loyalty Options to raise up to approximately $128,000
(before costs).
Interests in Mining Tenements as at 30 June 2023
Acquired Interest
during Quarter
Interest at the end
of Quarter
M47/1450
221266, 221267, 229223
243759, 251792, 251793
251794, 287807, 308044
325202, 336173, 582713
582714, 716167, 716168,
716165, 716166, 716170,
716171, 716169
-
36.5%
100%
727287 to 727384
-
100%
-
100%
100%
Location
Tenement Reference
Western Australia1
Canada, Bloom Lake
Canada, Falcon Lake
- Central
2106057-106058, 121357-
- West
- East
ASX Announcement
Released Released 31 July 2023
121360, 122094, 132858132859, 134102, 136948,
136962, 142489, 148810,
164547-164548, 166603,
178073, 179345, 185376185377, 186114-186115,
208573, 209065, 215331,
224637-224639, 237714237716, 244810, 246081,
252181, 256393-256395,
274457, 281913, 289275,
291550, 301417-301418,
302155, 311782-311784
727385 – 727406
727409 – 727452
90%
10
Location
Tenement Reference
Canada, Jessie Lake
834651 – 834704
835652 - 835724
EP3842355, EP3842356,
ML383699
EL 476/22 (BB1) – 591/22
(BB116)
168-L-1939
66-C-2005
28-L-2011
Morocco, Tidili
Austria, Bleiberg3
Argentina
1.
2.
3.
Acquired Interest
during Quarter
100%
Interest at the end
of Quarter
100%
-
85%
-
15%
-
100%
100%
100%
Battery Age’s interest in the Hamersley Iron Ore Project is held indirectly by way of its investment held in Equinox Resources Limited.
The Company may acquire the final 10% of the above identified Falcon Lake tenements by paying an amount equal to the lower of
(i) the price determined by an independent valuation, or (ii) A$2,000,000.
The Company may acquire a further 46% interest (total 51%) in the above Bleiberg tenements within 24 months of acquiring its
original 15% interest by: (i) incurring a minimum of C$1,000,000 in expenditure on the project, and (ii) issuing the project vendors
C$377,5000 worth of BM8 shares calculated based on the greater of the 10 day VWAP or $0.40.
The Company may acquire a further 14% interest (total 65%) in the above Bleiberg tenements within 24 months of acquiring the
abovementioned 46% interest by incurring an additional C$3,500,000 in expenditure on the project.
The Company may acquire the final 15% interest (total 80%) in the above Bleiberg tenements within 6.5 years from executing the
Bleiberg Agreement upon completion of a Bankable Feasibility Study that is compliance to JORC and indicates the project will have
a production rate of at least 100,000 tonnes per year.
- END Release authorised by the Board of Battery Age Minerals Ltd.
Contacts
Investors / Shareholders
Gerard O’Donovan
Chief Executive Officer
P: +61 (8) 6109 6689
Compliance Statement
This quarterly report contains information on the Falcon Lake, Jessie Lake, Bleiberg and Tidili, Projects extracted from an ASX
market announcements dated 7 December 2022, 2 February 2023, 7 March 2023, 11 April 2023, 12 May 2023, 13 June 2023, 22
June 2022. 4 July 2023, 13 July 2023, 24 July 2023 and 26 July 2023. released by the Company and reported in accordance
with the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC
Code). The original market announcement is available to view on www.batteryage. au and www.asx.com.au. Battery Age is not
aware of any new information or data that materially affects the information included in the original market announcement and, in
the case of estimates of Mineral Resources (as that term is defined in the JORC Code) that all material assumptions and technical
parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed.
Forward Looking Statements
Information included in this release constitutes forward-looking statements. Often, but not always, forward looking statements can
generally be identified by the use of forward looking words such as “may”, “will”, “expect”, “intend”, “plan”, “estimate”, “anticipate”,
“continue”, and “guidance”, or other similar words and may include, without limitation, statements regarding plans, strategies and
objectives of management, anticipated production or construction commencement dates and expected costs or production
outputs. Forward looking statements inherently involve known and unknown risks, uncertainties and other factors that may cause
the Company’s actual results, performance and achievements to differ materially from any future results, performance or
achievements. Relevant factors may include, but are not limited to, changes in commodity prices, foreign exchange fluctuations
and general economic conditions, increased costs and demand for production inputs, the speculative nature of exploration and
project development, including the risks of obtaining necessary licenses and permits and diminishing quantities or grades of
reserves, political and social risks, changes to the regulatory framework within which the company operates or may in the future
ASX Announcement
Released Released 31 July 2023
11
operate, environmental conditions including extreme weather conditions, recruitment and retention of personnel, industrial
relations issues and litigation. Forward looking statements are based on the Company and its management’s good faith
assumptions relating to the financial, market, regulatory and other relevant environments that will exist and affect the Company’s
business and operations in the future. The Company does not give any assurance that the assumptions on which forward looking
statements are based will prove to be correct, or that the Company’s business or operations will not be affected in any material
manner by these or other factors not foreseen or foreseeable by the Company or management or beyond the Company’s control.
Although the Company attempts and has attempted to identify factors that would cause actual actions, events or results to differ
materially from those disclosed in forward looking statements, there may be other factors that could cause actual results,
performance, achievements or events not to be as anticipated, estimated or intended, and many events are beyond the reasonable
control of the Company. Accordingly, readers are cautioned not to place undue reliance on forward looking statements. Forward
looking statements in these materials speak only at the date of issue. Subject to any continuing obligations under applicable law
or any relevant stock exchange listing rules, in providing this information the company does not undertake any obligation to publicly
update or revise any of the forward-looking statements or to advise of any change in events, conditions or circumstances on which
any such statement is based.
ASX Announcement
Released Released 31 July 2023
12
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
BATTERY AGE MINERALS LTD
ABN
Quarter ended (“current quarter”)
80 085 905 997
30 June 2023
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date (12
months)
$A’000
-
-
(165)
(326)
(b) development
-
-
(c) production
-
-
(d) staff costs
(205)
(724)
(e) administration and corporate costs
(235)
(962)
(a) exploration & evaluation
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
-
-
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (provide details if material)
- Settlement of Litigation
-
-
(605)
(2,012)
(a) entities
-
-
(b) tenements
-
-
(7)
(84)
(555)
(1,430)
-
-
(38)
(100)
1.9
Net cash from / (used in) operating
activities
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(c) property, plant and equipment
(d) exploration & evaluation
(e) investments
(f)
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date (12
months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(600)
(1,614)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
128
6,628
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
(251)
(731)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
(123)
5,897
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
4,528
929
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(605)
(2,012)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(600)
(1,614)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
(123)
5,897
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
5.2
Current quarter
$A’000
Year to date (12
months)
$A’000
-
-
3,200
3,200
Current quarter
$A’000
Previous quarter
$A’000
3,200
4,528
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
3,200
4,528
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
(56)
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
(605)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(555)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(1,160)
8.4
Cash and cash equivalents at quarter end (item 4.6)
3,200
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
3,200
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
2.76
$A’000
-
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: N/A
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: N/A
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
31 July 2023
Authorised by: The Board of Battery Age Minerals Ltd
(Name of body or officer authorising release – see note 4)
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5.
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, that this report complies with the appropriate accounting standards
and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a
sound system of risk management and internal control which is operating effectively.