Regional Discovery expands mineralisation across Falcon Lake
Released
Released
Announcement PDF
ASX Announcement
Released 6 September 2023
Mineralisation identified at Falcon North
expands exploration potential of Falcon
Lake Lithium Project
Summer Prospecting concludes with a total of 30 pegmatites identified
including significant discovery of mineralised pegmatite in the Falcon North
property located ~1.2km north of Falcon Main
Highlights
• Mineralisation has been confirmed at Falcon North, a previously unexplored area
which has further expanded the exploration potential of the Falcon Lake Property
beyond the main focus area at Falcon Main
• A total of 30 new pegmatites have been discovered over the whole prospecting
campaign, including 15 containing visible spodumene ranging from <5 to 20%
content1.
• The Summer Prospecting campaign has now been completed with the field
exploration team about to commence further systematic exploration including,
ground magnetics and geochemical transects with a focus on Falcon Main.
Battery Age Minerals Ltd (ASX: BM8; “Battery Age” or “the Company”) is pleased to report
further significant outcomes from its maiden Summer Fieldwork Programme at the Falcon
Lake Lithium Project in Ontario, Canada with a significant new discovery made by the
fieldwork team in Falcon North, a previously unexplored portion of the Falcon Lake Project.
Surface mineralisation has been confirmed at Falcon North following the discovery of outcrop
R23FL-EH07, which contains 5% visible spodumene1 and is located approximately 1.2km
north of the Falcon Main Property.
Further to the Company’s announcement on 16 August 2023, the field team has now identified
an additional 21 new pegmatites of which 10 are mineralised bringing the total number of
pegmatites identified over the short 3.5 week campaign to 30 with 15 being mineralised1.
See Figure 1 below.
1 In relation to the disclosure of visual mineralisation, the Company cautions that visual estimates of mineral abundance should
never be considered a proxy or substitute for laboratory analysis where concentrations or grades are the factor of principal
economic interest. Visual estimates also potentially provide no information regarding impurities or deleterious physical
properties relevant to valuations. The presence of pegmatite rock does not necessarily indicate the presence of lithium,
caesium, tantalum (LCT) mineralisation. Laboratory chemical assays are required to determine the grade of mineralisation.
Refer to Cautionary Note – Visual Estimates
Battery Age Minerals Ltd
ASX: BM8
ACN 085 905 997
batteryageminerals.au
T: +61 (8) 6109 6689
E: info@batteryage.au
Level 50, 108 St Georges Terrace
Perth, WA 6000
PO Box 7310, Cloisters Square Po, WA 6850
1
Falcon North
Falcon Main
Figure 1 – Pegmatites mapped as part of the Summer Fieldwork campaign with Falcon North included1.
ASX Announcement
Released 6 September 2023
2
This new find at Falcon North confirms the presence of mineralisation outside the Metavolcanic
corridor at Falcon Main and provides another target area for the Company to explore moving
forward this summer season and into next year.
This along with the other additional finds within Falcon Main will continue to be explored
through continued drilling over winter. Additional permitting will be submitted in the coming
weeks to enable the continuation of drilling across the entire Falcon main property with an
existing permit already in place for a portion of the Falcon North property, including the area
where mineralisation has been discovered. The full extent of Falcon North will continue to be
explored next summer to further define additional targets.
Samples for all mapped pegmatites have been taken and sent to the laboratory for testing with
results anticipated in 6-8 weeks.
Figure 2 – Spodumene crystals in outcrop F09317 located in Falcon North1
ASX Announcement
Released 6 September 2023
3
Figure 3 – Field Exploration Team taking samples at Falcon Lake.
Battery Age Managing Director Gerard O’Donovan commented:
"This is another fantastic development stemming from the Summer Fieldwork campaign.”
“This significant discovery at Falcon North which is located ~1.2km from our main focus area
at Falcon Main further expands the exploration potential of the Falcon Lake Project”.
“Coupled with the additional 25 pegmatites identified at Falcon Main, we now have a large
quantity of drill targets to test over the winter period and further areas to prospect both this
season and next.”
“We are very excited to keep the rig turning into the winter months and continue to define the
broader scale and potential of the Falcon Lake Project”.
[ENDS]
Release authorised by the Board of Battery Age Minerals Ltd.
Contacts
Investors / Shareholders
Gerard O’Donovan
Managing Director
P: +61 (0)8 6109 6689
E: info@batteryage.au
ASX Announcement
Released 6 September 2023
Media
Nicholas Read – Read Corporate
P: +61 (0)8 9388-1474 / (0419) 929 046
E: nicholas@readcorporate.com.au
4
Cautionary Statement – Visual Estimates
This announcement contains references to visual results and visual estimates of mineralisation. The Company
draws attention to uncertainty in reporting visual results. Visual estimates of mineral abundance should never be
considered a proxy or substitute for laboratory analyses where concentrations or grades are the factor of principal
economic interest. Visual estimates also potentially provide no information regarding impurities or deleterious
physical properties relevant to valuations. The presence of pegmatite rock does not necessarily indicate the
presence of lithium, caesium, tantalum (LCT) mineralisation. Laboratory chemical assays are required to determine
the grade of mineralisation.
Competent Person Statement
The information in this Report that relates to Exploration and Geological Data for the Falcon Lake Lithium Project
is based on, and fairly represents, information and supporting documentation compiled and reviewed by Mr Nigel
Broomham (BSc (Hons) Geology & Resource Economics) who is a Member of the Australasian Institute of Mining
and Metallurgy (AusIMM) and holds a Professional Certificate in JORC Code Reporting. Mr Broomham is the
General Manager – Exploration of Battery Age Minerals. Mr Broomham has sufficient experience which is relevant
to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to
qualify as a Competent Person as defined in the 2012 Edition of the Joint Ore Reserves Committee (JORC)
"Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr Broomham
consents to the inclusion in this report of the matters based on information in the form and context in which they
appear. Mr Broomham holds securities in the Company.
Compliance Statement
This report contains information on the Falcon Lake Project extracted from an ASX market announcements dated
7 December 2022, 31 July 2023, 2 August 2023 and 16 August 2023, released by the Company and reported in
accordance with the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves” (JORC Code). The original market announcement is available to view on www.batteryage.au
and www.asx.com.au. Battery Age is not aware of any new information or data that materially affects the information
included in the original market announcement.
Forward-Looking Statement
This announcement may contain certain forward-looking statements and projections. Such forward looking
statements/projections are estimates for discussion purposes only and should not be relied upon. Forward looking
statements/projections are inherently uncertain and may therefore differ materially from results ultimately achieved.
Battery Age Minerals Limited does not make any representations and provides no warranties concerning the
accuracy of the projections and disclaims any obligation to update or revise any forward-looking statements/projects
based on new information, future events or otherwise except to the extent required by applicable laws. While the
information contained in this report has been prepared in good faith, neither Battery Age Minerals Limited or any of
its directors, officers, agents, employees or advisors give any representation or warranty, express or implied, as to
the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this
announcement.
ASX Announcement
Released 6 September 2023
5
Table 1 – Mapped Pegmatites
Station_ID
Sample_ID Northing Easting
R23FL-EH01
F009304
R23FL-EH03
F009308
R23FL-EH04
F009309
5591366 421079.4 PEGMATITE
R23FL-EH05
F009312
5591547 420712.1 PEGMATITE
R23FL-EH06
F009314
5591553 420675.3
R23FL-EH07
F009316
R23FL-EH08
F009318
5592609 421270.1 PEGMATITE
R23FL-EH09
F009320
5592655 421348.9 PEGMATITE
R23FL-EH10
F009321
5592706
R23FL-EH11
F009322
5591655 420227.9
R23FL-EH12
R009323
5591477
420429 PEGMATITE
R23FL-HH01
F069801
5591430
421377
R23FL-HH02
F069802
5591421
421364 PEGMATITE
R23FL-HH03
F069803
5591428
421344 PEGMATITE
R23FL-HH04
F069804
5591174
R23FL-HH05
F069805
R23FL-MD01
F009301
R23FL-MD02
F009302
5591645 421071.4 PEGMATITE
R23FL-MD03
F009303
5591795 421247.1 PEGMATITE
R23FL-MD04
F009306
5591366 421077.7 PEGMATITE
R23FL-MD05
F009307
5591377 421494.5
R23FL-MD06
F009310
5591481 423068.1 PEGMATITE
ASX Announcement
Released 6 September 2023
Lithology
LCT
PEGMATITE
LCT
5591377 421111.7
PEGMATITE
5591378 421111.8
LCT
PEGMATITE
LCT
5592915 420906.4
PEGMATITE
421569 PEGMATITE
LCT
PEGMATITE
LCT
PEGMATITE
LCT
PEGMATITE
LCT
5591172
420970
PEGMATITE
LCT
5591384 421502.8
PEGMATITE
420973
LCT
PEGMATITE
Metallics
Spd_pct
Spodumene
<5%
Spodumene
<5%
Not
Observed
Not
Observed
0%
0%
Spodumene
<5%
Spodumene
<5%
Not
Observed
Not
Observed
Not
Observed
0%
0%
0%
Spodumene
<5%
Not
Observed
0%
Spodumene
<5%
Not
Observed
Not
Observed
0%
0%
Spodumene
5-10%
Spodumene
5-10%
Spodumene
<5%
Not
Observed
Not
Observed
Not
Observed
0%
0%
0%
Spodumene
<5%
Not
Observed
0%
6
Station_ID
Sample_ID Northing Easting
Lithology
Metallics
R23FL-MD07
F009311
5591676 420961.1
LCT
PEGMATITE
Spodumene
R23FL-MD10
F009317
5592914 420895.3 PEGMATITE
R23FL-MD11
F009319
5592611 421269.7 PEGMATITE
R23FL-MD12
F069806
5591958 420227.5 PEGMATITE
R23FL-PS01
F069851
5591426 421381.2 PEGMATITE
R23FL-PS02
F069852
5591421 421375.5
R23FL-PS03
F069853
5591424 421337.9 PEGMATITE
R23FL-PS06
F069854
5591427
R23FL-PS06
F069855
R23FL-PS06
F069856
ASX Announcement
Released 6 September 2023
LCT
PEGMATITE
LCT
PEGMATITE
LCT
5591427
422942
PEGMATITE
LCT
5591427 422941.5
PEGMATITE
422943
Not
Observed
Not
Observed
Not
Observed
Not
Observed
Spd_pct
<5%
0%
0%
0%
0%
Spodumene
<5%
Not
Observed
0%
Spodumene
15%
Spodumene
20%
Spodumene
15%
7
Appendix 1 – JORC CODE, 2012 EDITION – TABLE 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
Sampling
techniques
Drilling
techniques
Drill sample
recovery
JORC Code explanation
• Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
• Aspects of the determination of
mineralisation that are Material to the Public
Report.
• In cases where ‘industry standard’ work has
been done this would be relatively simple
(eg ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation
may be required, such as where there is
coarse gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (eg submarine nodules)
may warrant disclosure of detailed
information.
• Drill type (eg core, reverse circulation, openhole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
• Method of recording and assessing core and
chip sample recoveries and results
assessed.
• Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
ASX Announcement
Released 6 September 2023
Commentary
• Rock Chip sampling has
occurred on the outcrops
referenced in Figure 1,2, 3
and Table 1.
• The company will submit
these samples imminently to
AGAT laboratories and report
the results once received.
• A summary of historical
exploration activities is
included in the Independent
Geologists Report within the
Company’s Prospectus
(dated 7 Dec 2022)
Annexure A.
• Outside of the Company’s
release “Maiden Assays”
(dated 26th July 2023), no
drilling has occurred on the
outcrops referenced in Figure
1-3.
• The company intends to drill
these targets in the near
future.
• A summary of historical
exploration activities is
included in the Independent
Geologists Report within the
Company’s Prospectus
(dated 7 Dec 2022)
Annexure A.
• Outside of the Company’s
release “Maiden Assays”
(dated 26th July 2023), no
drilling has occurred on the
outcrops referenced in Figure
1-3.
8
Criteria
JORC Code explanation
• Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
Logging
• Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
• Whether logging is qualitative or quantitative
in nature. Core (or costean, channel, etc)
photography.
• The total length and percentage of the
relevant intersections logged.
Subsampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether
quarter, half or all core taken.
• If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the sampling
is representative of the in situ material
collected, including for instance results for
field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the
grain size of the material being sampled.
• The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied
and their derivation, etc.
• Nature of quality control procedures adopted
(eg standards, blanks, duplicates, external
Quality of
assay data
and
laboratory
tests
ASX Announcement
Released 6 September 2023
Commentary
• The company intends to drill
these targets in the near
future.
• A summary of historical
exploration activities is
included in the Independent
Geologists Report within the
Company’s Prospectus
(dated 7 Dec 2022)
Annexure A.
• Outside of the Company’s
release “Maiden Assays”
(dated 26th July 2023), no
drilling has occurred on the
outcrops referenced in Figure
1-3.
• The company intends to drill
these targets in the near
future.
• A summary of historical
exploration activities is
included in the Independent
Geologists Report within the
Company’s Prospectus
(dated 7 Dec 2022)
Annexure A.
• Outside of the Company’s
release “Maiden Assays”
(dated 26th July 2023), no
drilling has occurred on the
outcrops referenced in Figure
1-3.
• The company intends to drill
these targets in the near
future.
•
A summary of historical
exploration activities is
included in the Independent
Geologists Report within the
Company’s Prospectus
(dated 7 Dec 2022)
Annexure A.
• Outside of the Company’s
release “Maiden Assays”
(dated 26th July 2023), no
sampling has occurred on
the outcrops referenced in
Figure 1-3.
• The company intends to drill
these targets in the near
future.
• A summary of historical
exploration activities is
included in the Independent
9
Criteria
Verification
of sampling
and
assaying
JORC Code explanation
laboratory checks) and whether acceptable
levels of accuracy (ie lack of bias) and
precision have been established.
• The verification of significant intersections by
either independent or alternative company
personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
• Discuss any adjustment to assay data.
•
•
•
Location of
data points
Data spacing
and
distribution
Orientation
of data in
relation to
geological
structure
Commentary
Geologists Report within the
Company’s Prospectus
(dated 7 Dec 2022)
Annexure A.
Outside of the Company’s
release “Maiden Assays”
(dated 26th July 2023), no
sampling has occurred on
the outcrops referenced in
Figure 1-3.
The company intends to drill
these targets in the near
future.
A summary of historical
exploration activities is
included in the Independent
Geologists Report within the
Company’s Prospectus
(dated 7 Dec 2022)
Annexure A.
The outcrops referenced in
Figure 1-3 have been located
by handheld GPS.
These data points are listed
in table 1.
The grid datum is NAD83
Zone 16N.
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
•
• Data spacing for reporting of Exploration
Results.
• Whether the data spacing and distribution is
sufficient to establish the degree of
geological and grade continuity appropriate
for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications
applied.
• Whether sample compositing has been
applied.
• Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
• If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
• This is a preliminary
prospecting campaign.
ASX Announcement
Released 6 September 2023
•
•
• Outside of the Company’s
release “Maiden Assays”
(dated 26th July 2023), no
sampling has occurred on
the outcrops referenced in
Figure 1-3.
• The company intends to drill
these targets in the near
future.
• A summary of historical
exploration activities is
included in the Independent
Geologists Report within the
Company’s Prospectus
(dated 7 Dec 2022)
Annexure A.
10
Criteria
Sample
security
JORC Code explanation
• The measures taken to ensure sample
security.
Audits or
reviews
• The results of any audits or reviews of
sampling techniques and data.
Commentary
• Outside of the Company’s
release “Maiden Assays”
(dated 26th July 2023), no
sampling has occurred on
the outcrops referenced in
Figure 1-3.
• The company intends to drill
these targets in the near
future.
• A summary of historical
exploration activities is
included in the Independent
Geologists Report within the
Company’s Prospectus
(dated 7 Dec 2022)
Annexure A.
• No external audit has been
undertaken at this stage.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
Mineral
tenement
and land
tenure status
Exploration
done by
other parties
JORC Code explanation
• Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint
ventures, partnerships, overriding royalties,
native title interests, historical sites,
wilderness or national park and
environmental settings.
• The security of the tenure held at the time of
reporting along with any known impediments
to obtaining a licence to operate in the area.
• Acknowledgment and appraisal of
exploration by other parties.
•
•
•
•
•
•
•
ASX Announcement
Released 6 September 2023
Commentary
All claims relating to the
Falcon Lake Lithium Project
minerals claims are in good
standing and are 90%
owned by the company.
Please refer to the company
prospectus (dated 7 Dec
2022) Annexure A, Table
3:1 for full table of Falcon
Lake mineral claims.
No known impediments.
British Canadian Lithium
Mines Ltd (“BCLM”)
completed diamond drill (DD)
holes in 1956. No core or
collars have been located.
Canadian Ore Bodies
completed 3 DD holes in
2010.
Argonaut Resources NL
drilled six holes in 2016.
Core and collars have been
located.
A summary of historical
exploration activities is
included in the Independent
Geologists Report within the
Company’s Prospectus
(dated 7 Dec 2022)
Annexure A.
11
Criteria
Geology
JORC Code explanation
• Deposit type, geological setting and style of
mineralisation.
Drill hole
Information
• A summary of all information material to the
understanding of the exploration results
including a tabulation of the following
information for all Material drill holes:
o easting and northing of the drill hole
collar
o elevation or RL (Reduced Level –
elevation above sea level in metres) of
the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified
on the basis that the information is not
Material and this exclusion does not detract
from the understanding of the report, the
Competent Person should clearly explain
why this is the case.
• In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (eg cutting of
high grades) and cut-off grades are usually
Material and should be stated.
• Where aggregate intercepts incorporate
short lengths of high grade results and
longer lengths of low grade results, the
procedure used for such aggregation should
be stated and some typical examples of
such aggregations should be shown in
detail.
• The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
• These relationships are particularly
important in the reporting of Exploration
Results.
• If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
Data
aggregation
methods
Relationship
between
mineralisatio
n widths and
intercept
lengths
ASX Announcement
Released 6 September 2023
Commentary
• The Falcon Lake Project is
underlain by Archean
supracrustal and plutonic
rocks of the Eastern
Wabigoon Sub-province of
the Superior Province along
the northern edge of Lake
Nipigon
• The Falcon Lake Pegmatite
Group consists of several
pegmatite dykes that intrude
amphibolitised mafic metavolcanic rocks.
• These pegmatites are
spodumene-subtype and are
tantalum-rich.
• All drill hole collar locations
and mineralised intercepts
have been reported
previously by the company.
• No relevant data has been
excluded from this report.
• No assay values are reported
in this announcement.
• No metal equivalent values
are reported.
• Outside of the Company’s
release “Maiden Assays”
(dated 26th July 2023), no
sampling has occurred on
the outcrops referenced in
Figure 1-3.
12
Criteria
Diagrams
Balanced
reporting
JORC Code explanation
• If it is not known and only the down hole
lengths are reported, there should be a clear
statement to this effect (eg ‘down hole
length, true width not known’).
• Appropriate maps and sections (with scales)
and tabulations of intercepts should be
included for any significant discovery being
reported These should include, but not be
limited to a plan view of drill hole collar
locations and appropriate sectional views.
• Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
Other
substantive
exploration
data
• Other exploration data, if meaningful and
material, should be reported including (but
not limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples – size and
method of treatment; metallurgical test
results; bulk density, groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
substances.
Further work
• The nature and scale of planned further
work (eg tests for lateral extensions or depth
extensions or large-scale step-out drilling).
• Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
ASX Announcement
Released 6 September 2023
Commentary
• The company intends to drill
these targets in the near
future.
• A summary of historical
exploration activities is
included in the Independent
Geologists Report within the
Company’s Prospectus
(dated 7 Dec 2022)
Annexure A.
• Appropriate plan views are
included.
• Outside of the Company’s
release “Maiden Assays”
(dated 26th July 2023), no
sampling has occurred on
the outcrops referenced in
Figure 1-3.
• The company intends to drill
these targets in the near
future.
• A summary of historical
exploration activities is
included in the Independent
Geologists Report within the
Company’s Prospectus
(dated 7 Dec 2022)
Annexure A.
• All previous exploration data
completed to date have
been reported within the
Independent Geologists
Report within the
Company’s Prospectus
(dated 7 Dec 2022) and the
Company’s release “Maiden
Assays” (dated 26th July
2023).
• No other substantive
exploration data is available
at this time.
• Further work planned at
Falcon Lake Lithium Project
includes exploration drilling,
field mapping, geochemistry,
geophysics and prospecting
works.
13
Share your feedback
Discover