Summer drilling campaign commences at Falcon Lake
Released
Released
Announcement PDF
ASX Announcement
Released 11 July 2024
Summer drilling campaign commences at
Falcon Lake
Drilling re-commences to test multiple newly identified targets across the
highly prospective 5km long corridor at Falcon Lake
Highlights:
• Drilling program will aim to expand on the successful 2023 drilling programs, which
returned significant high-grade intercepts including:
o 31.75 metres @ 1.45% Li2O (23FL-031)
o 27.6 metres @ 1.37% Li2O (23FL-001)
o 21.9 metres @ 1.44% Li2O (23FL-004)
o 20.65 metres @ 1.48% Li2O (23FL-081)
o 18.95 metres @ 1.65% Li2O (23FL-076)
• Drill targets have been prioritised across the 5km mineralised corridor at the Falcon
Lake Lithium Project, with the program designed to unlock the broader potential of
the asset.
• Drilling will be undertaken by the Rodren Drilling – Whitesand First Nation JV, a
joint venture between BM8’s incumbent drilling contractor and the local First Nation
group.
Battery Age Minerals Ltd (ASX: BM8; Battery Age or the Company) is pleased to advise that
drilling activities have re-commenced at its Falcon Lake Lithium Project in Ontario, Canada.
Battery Age has remobilised personnel to Falcon Lake to oversee the drilling program. The
program has been designed to further delineate and expand the high-grade lithium zones
identified last year, as well as to test new pegmatite discoveries within other high-priority zones
across the 5km mineralised corridor.
The drilling program has been designed and prioritised based on the results of the 2023 and
2024 summer field exploration campaign, which included lidar, ortho-imagery, ground
magnetics, prospecting, rock chip sampling, and litho-geochemical transects across the Falcon
Main tenure.
Battery Age Minerals Ltd
ASX: BM8
ACN 085 905 997
batteryageminerals.au
T: +61 (8) 6109 6689
E: info@batteryage.au
Level 50, 108 St Georges Terrace
Perth, WA 6000
PO Box 7310, Cloisters Square Po, WA 6850
1
Figure 1 – Rodren-Whitesand JV Drill Rig in position at Falcon Lake.
Figure 2 – 2024 Falcon Extension discovery & 2023 mineralised pegmatites at Falcon Lake.
ASX Announcement
Released 11 July 2024
2
5km
Falcon West
Falcon
Discovery
Falcon East
Figure 2 – Prioritised 2024 drill collars designed on 2023 and 2024 field program results at Falcon Lake.
Figure 3 – BM8 Exploration Manager Nick Mitchell marking collar positions at Falcon Lake.
ASX Announcement
Released 11 July 2024
3
Battery Age CEO Nigel Broomham commented:
"We are excited to kick off our 2024 drilling program at Falcon Lake, building on the success
of our 2023 efforts. The upcoming program has been designed to further delineate and expand
the high-grade lithium zones identified last year, including the standout intercepts such as
31.75 metres at 1.45% Li2O and 18.95 metres at 1.65% Li2O, as well as to start to test the 30
additional targets we have identified within the broader 5km mineralised corridor.
“The re-commencement of drilling operations at Falcon Lake underscores our commitment to
unlock the full potential of this asset. We are also proud to continue our collaboration with the
Rodren Drilling-Whitesand First Nation JV, ensuring that our operations benefit the local
communities. We look forward to reporting on the results from this drill program.”
Release authorised by the Board of Directors of Battery Age Minerals Ltd.
Contacts
Investors / Shareholders
Nigel Broomham
Chief Executive Officer
P: +61 (0)8 6109 6689
E: info@batteryage.au
ASX Announcement
Released 11 July 2024
Media
Kelly-Jo Fry
Battery Age Minerals
P: (08) 9465 1044
E: kjfry@batteryage.au
4
Compliance Statement
This report contains information on the Falcon Lake Projects extracted from an ASX market announcement dated
8 December 2022, 2 February 2023, 13 June 2023, 26 July 2023, 2 August 203, 16 August 2023, 6 September
2023, 14 September 2023, 5 October 2023, 10 October 2023, 16 October 2023, 25 October 2023, 1 November
2023, 30 November 2023, 13 December 2023 and 8 July 2024 released by the Company and reported in
accordance with the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves” (JORC Code). The original market announcement is available to view on www.batteryage.au
and www.asx.com.au. Battery Age is not aware of any new information or data that materially affects the information
included in the original market announcement.
Forward-Looking Statement
This announcement may contain certain forward-looking statements and projections. Such forward looking
statements/projections are estimates for discussion purposes only and should not be relied upon. Forward looking
statements/projections are inherently uncertain and may therefore differ materially from results ultimately achieved.
Battery Age Minerals Limited does not make any representations and provides no warranties concerning the
accuracy of the projections and disclaims any obligation to update or revise any forward-looking statements/projects
based on new information, future events or otherwise except to the extent required by applicable laws. While the
information contained in this report has been prepared in good faith, neither Battery Age Minerals Limited or any of
its directors, officers, agents, employees or advisors give any representation or warranty, express or implied, as to
the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this
announcement.
ASX Announcement
Released 11 July 2024
5
Share your feedback
Discover