September 2026 Quarterly Activities Report
Key highlights:
• Bleiberg Zn-Pb-Ge Drilling Permits Advancing
The Company's deep drilling permit applications targeting potential strike extensions west
of the historic Bleiberg mine progressed through the Austrian mining authority process
during the Quarter. Oral hearings were held on 12 October 2026, subsequent to Quarter
end. Over its 700-year history the Bleiberg mine is reported to have produced
approximately 3 million tonnes of zinc and lead metal at average grades of about 5% zinc
and 1% lead, together with approximately 172 tonnes of germanium, ranking it the world’s
sixth-largest germanium producer at its closure in 19931
.
• First Fieldwork Completed at Apex
The Company completed its first field program at the Apex Germanium-Gallium Project in
Utah, comprising geological mapping and prospecting across the priority target areas
defined by the remote sensing and structural study.
• University of Sydney Germanium Program Nearing Completion
The laboratory-scale program with the University of Sydney, assessing advanced
germanium recovery techniques from mineral concentrates and electronic waste, is
nearing completion. The Company is working through a licensing agreement for the
technology with the University.
• Germanium Strategy Aligned to AI Infrastructure Demand
The Company advanced work under its exclusive NTUitive germanium technology licence,
with a focus on Ge-based optical interconnects. A Research Collaboration Agreement is
being progressed to further develop this work.
• Falcon Lake Landholding Expanded to ~60 km²
Staked 46 additional mineral claims at the Falcon Lake Lithium Project in Ontario, Canada,
extending the Company's landholding by approximately 7 km along strike to the east and
consolidating a contiguous district-scale position of approximately 60 km² within the
Caribou Lake–O'Sullivan Greenstone Belt.
Battery Age Minerals Ltd (ASX: BM8, “Battery Age” or “the Company”) presents its
Quarterly Activities Report for the three-month period ended 30 September 2026 (“Quarter”),
summarising exploration, technical, financial and corporate activities undertaken across the
Company’s project portfolio in Austria, Argentina, the United States and Canada and progress
of its integrated germanium initiatives to build exposure to a secure, Western-aligned supply
of germanium, a critical material used across advanced technology supply chains.
ASX Announcement
Released 30 October 2026 2
Project Activities
Bleiberg Zinc-Lead-Germanium Project (Carinthia, Austria)
During the Quarter, the Company progressed its drilling permit applications with the Austrian
mining authority for deep drill holes targeting potential strike extensions of mineralisation
immediately west of the historic Bleiberg operation (Bleiberg West Target). Subsequent to
Quarter end, the applications were considered at oral hearings held by the authority on 12
October 2026, attended by the authority’s official expert assessors. The Company is awaiting
the authority’s formal decision on the applications. The historical Bleiberg mine produced
approximately 172 tonnes of germanium over its operating life, ranking it as the world's sixth-
largest germanium producer at the time of its closure in 19931
. With germanium designated a
critical raw material by the European Union and refined supply concentrated in China, Bleiberg
stands out as one of very few brownfield germanium opportunities within Europe.
Figure 1: Bleiberg target areas
Figure 2: Bleiberg concessions and target area. Illustrating exploration tenure, historic mining corridor and shafts
(GBK tenure) in green. 100% staked claims identified in blue & orange (Bleiberg West concessions) and existing
earn-in claims shown in red (Bleiberg concessions).
ASX Announcement
Released 30 October 2026 3
Apex Germanium-Gallium Project (Utah, USA)
The Apex Germanium-Gallium Project comprises 186 unpatented lode mining claims
(approximately 3,728 acres / 15.09 km²) in Washington County, south-western Utah,
surrounding the historic Apex Mine, which operated in the 1980s as the first mine in the world
developed primarily for germanium and gallium. Mineralisation at the Apex Mine is hosted in
brecciated and oxidised dolomite along structural zones, and the Company’s claims cover the
interpreted extensions of that setting along strike and across the adjoining structures. Apex
forms the North American upstream component of the Company’s germanium strategy,
alongside Bleiberg in Austria.
Figure 3: Location of the Apex claim blocks.
ASX Announcement
Released 30 October 2026 4
During the Quarter, the Company undertook initial field work at Apex, comprising geological
mapping and field checking of the priority targets defined by the satellite remote sensing and
structural interpretation study completed in the prior Quarter (refer announcement 22 June
2026). Initial field observations did not confirm the remote sensing anomalies on the ground.
NTUitive Germanium Technology Licence
The Company continued work under its Exclusive Patent and Know-How Licence Agreement
with NTUitive Pte Ltd, the innovation and enterprise company of Nanyang Technological
University, Singapore, covering a portfolio of germanium-related technologies.
The licence supports Battery Age’s integrated germanium strategy, which links exploration at
its Bleiberg (Austria) and Apex (Utah, USA) projects with a downstream workstream focused
on two areas:
• End-market specification: understanding the product parameters and qualification
requirements of germanium end users in semiconductor and optoelectronic
applications; and
• Processing optionality: assessing pathways that reduce chemical and energy
intensity while improving consistency and responsible sourcing outcomes.
Figure 4: Evaluation program across materials, device and platform levels
A key focus of the end-market work is optical interconnects. As AI data centres scale, copper
wiring is approaching its practical limits for high-speed, short-distance data transmission, and
the industry is increasingly moving to light-based connections. Germanium is used in the
photodetectors and modulators at the core of silicon photonics, which positions it as an
enabling material for this transition. This sits alongside germanium’s established roles in
infrared optics and fibre-optic dopants.
Building on this focus, the Company is progressing a Research Collaboration Agreement to
advance germanium-based optical interconnect technologies.
ASX Announcement
Released 30 October 2026 5
University of Sydney Collaboration
During the Quarter, the Company's laboratory-scale consulting program with the University of
Sydney's School of Chemical and Biomolecular Engineering, which is assessing advanced
germanium recovery techniques from mineral concentrates and electronic waste, continued to
progress and is nearing completion. The Company is working through a proposed licensing
agreement with the University.
Together, the NTUitive technology licence and the University of Sydney program are intended
to ensure that development decisions across the Company’s germanium projects reflect both
end-market requirements and practical recovery pathways.
Falcon Lake Lithium Project (Ontario, Canada)
During the Quarter, the Company staked an additional 46 single cell mining claims
(approximately 9 km²) at the Falcon Lake Lithium Project in Ontario, Canada (refer
announcement 22 July 2026). The new claims extend the Company's landholding by
approximately 7 km along strike to the east over prospective metavolcanic stratigraphy,
increasing the contiguous Project area to approximately 60 km² within the Caribou Lake–
O'Sullivan Greenstone Belt, host to the Falcon Lake spodumene pegmatites.
Figure 5: Location of the Falcon Lake Project, including the newly staked claims (yellow).
The expanded landholding builds on previously reported results from the Company's 2024
winter diamond drilling program, including
• 54.1m @ 1.74% Li₂O from 100.85m (24FL-107),
ASX Announcement
Released 30 October 2026 6
• 55.95m @ 1.47% Li₂O from 222.2m (24FL-108); and
• 43.0m @ 1.62% Li₂O from 62.2m (24FL-114) (refer announcement 28 January 2025;
intervals are down-hole lengths, true widths not known). Multi-element assays from the Project
have also returned elevated rubidium, caesium, tantalum and gallium (refer announcement 14
August 2025).
Additionally, the Company undertook a desktop review of the Falcon Lake Project, integrating
existing geological, geophysical and geochemical datasets across the expanded landholding
to refine and prioritise targets for follow-up field exploration. The Company conducted limited
field work activity during the Quarter.
King Tut Gold Project (La Rioja, Argentina)
No field exploration activities were conducted during the Quarter. The Company has
commenced a review of the King Tut Project, including its historical data, and is assessing
options for the potential reactivation of exploration at the Project.
El Aguila Gold-Silver Project (Santa Cruz, Argentina)
No field exploration activities were conducted during the Quarter. The El Aguila Project
continues to be reviewed in-house, with the Company integrating geological, geochemical and
geophysical data to refine interpretation of the broader mineralised corridor and prioritise areas
for follow-up exploration.
Jessie Lake Lithium Project (Ontario, Canada)
No exploration activities were conducted during the Quarter.
Bloom Lake Project (Ontario, Canada)
No exploration activities were conducted during the Quarter.
Corporate
Annual General Meeting
The Company's 2026 Annual General Meeting will be held at the Boorloo Meeting Room,
Ground Floor, 108 St Georges Terrace, Perth, Western Australia on Monday, 30 November
2026. The Notice of Meeting was dispatched on 30 October 2026.
The meeting materials may also be viewed and downloaded at the Company’s website:
https://batteryage.au/ or online at the ASX Company Announcements Platform.
Appointment of Chief Financial Officer
Mr Jay Stephenson commenced as Chief Financial Officer effective 1 August 2026. Mr
Stephenson brings more than 35 years' experience in business development and corporate
advisory roles, including approximately 29 years as a Director, CFO and Company Secretary
across listed and unlisted resources-sector entities in Australia and overseas, and holds an
MBA along with Chartered Accountant, CPA Australia, Chartered Professional Accountant
(Canada), Certified Management Accountant (Canada) and Governance Institute of Australia
credentials.
ASX Announcement
Released 30 October 2026 7
Business Development
During the Quarter, the Company continued to evaluate business development opportunities
aligned with its strategy and complementary to its existing asset base. In addition to its
germanium-related initiatives, the Company reviewed advanced projects across a broader
range of commodities and jurisdictions, including under-explored or overlooked regions that
may offer potential for the discovery of large-scale, high-quality mineral resources.
Future reviews are expected to focus on geological prospectivity, technical merit and
jurisdictional factors, with the objective of identifying opportunities that could enhance portfolio
quality and long‑term value creation. All such opportunities will remain subject to further
technical, commercial and strategic assessment. There is no certainty that these
forward‑looking reviews or discussions will result in the acquisition of any additional projects
or assets.
Appendix 5B
The Appendix 5B quarterly cashflow report for the Quarter is submitted separately.
The Group closed the Quarter with a cash balance of $1,117k. Exploration expenditure during
the Quarter totalled $396k (unaudited).
The Company currently holds 34.5m shares in Eminence Minerals Ltd (ASX: EMA), which had
a market value at the end of the Quarter of $1.45m at $0.042 per share (share price 30
September 2026).
Payments to Related Parties
Pursuant to section 6 of the Company's Appendix 5B, and as required under ASX Listing Rule
5.3.5, during the Quarter the Company paid $50k to the Directors for remuneration.
Capital Structure
The capital structure at the end of the Quarter was as follows:
• 221,477,559 Ordinary Shares.
• 34,500,005 Options.
• 2,550,000 Performance Rights.
Interests in Mining Tenements as at 30 September 2026
Location Tenement Reference
Interest
during
Quarter
Interest at the
end of
Quarter
Canada, Bloom
Lake
221266, 221267, 229223
243759, 251792, 251793
251794, 287807, 308044
325202, 336173, 582713
582714, 716167, 716168, 716165, 716166,
716170, 716171, 716169
- 100%
Canada, Falcon
Lake
- Central
727287 - 727384
668831, 670166, 670168, 721084, 721085,
746214, 754668
- 100%
ASX Announcement
Released 30 October 2026 8
Location Tenement Reference
Interest
during
Quarter
Interest at the
end of
Quarter
2106057-106058, 121357-121360, 122094,
132858-132859, 134102, 136948, 136962,
142489, 148810, 164547-164548, 166603,
178073, 179345, 185376-185377, 186114-
186115, 208573, 209065, 215331, 224637-
224639, 237714-237716, 244810, 246081,
252181, 256393-256395, 274457, 281913,
289275, 291550, 301417-301418, 302155,
311782-311784
- 90%
- West 881301 - 100%
- East 881299, 881300 - 100%
- East extension6
1053789 – 1053834 100% 100%
Canada, Jessie
Lake
834651 – 834704
835652 - 835724
- 100%
Austria, Bleiberg3 EL 476/22 (BB1) – 591/22 (BB116)
1524/23 (1/23) – 1583/23 (60/23) 1413/24 –
1542/24 (545/24 - 674/24)
-
-
51%
100%
Austria, Hochobir 774/24 (1/24) - 1387/24 (614/24)
1389/24 (615/24) – 1412/24 (638/24)
- 100%
USA, Apex4 UT106756674 – UT106756808
UT106794179 –
UT106794229
- 100%
Argentina 168-L-1939 - 100%
66-C-2005 - 100%
28-L-2011 - 100%
1. In addition to the tenements listed above, the Company holds an indirect interest in the tenements of Eminence Minerals
Limited (ASX: EMA) by way of its approximately 18% shareholding in EMA.
2. The Company may acquire the final 10% of the above identified Falcon Lake tenements by paying an amount equal to
the lower of (i) the price determined by an independent valuation, or (ii) A$2,000,000.
3. The Company may acquire a further 14% interest (total 65%) in the above Bleiberg tenements within 36 months of
acquiring the abovementioned 36% interest (May 2024) by incurring an additional C$3,500,000 in expenditure on the
project. The Company may acquire the final 15% interest (total 80%) in the above Bleiberg tenements within 6.5 years
from executing the Bleiberg Addendum Agreement upon completion of a Bankable Feasibility Study that is compliance to
JORC and indicates the project will have a production rate of at least 100,000 tonnes per year. Refer to Bleiberg earn-in
terms and structure set out in the Company’s Prospectus dated 7 December 2022, and announcement 16 May 2024.
4. As announced on 31 March 2026, BM8 has staked an additional 51 unpatented lode mining claims
5. As announced on 31 January 2025, the Company has entered into a Farm-In Agreement with Fredonia Mining Inc. to
earn up to 80% to 100% ownership of the El Aguila Project in the Santa Cruz province, Argentina (Aguila I,
No423.460/W/10., Aguila II No427.885/W/11. and Winki No406.199/W/02.) . Refer to announcement dated 31 January
2025 for full terms and conditions of the Farm-In Agreement. At 30 September 2026, the Company is at stage 1 of the
earn-in agreement, earning up to 51% interest over time.
6. As announced on 22 July 2026, the Company staked 46 additional single cell mining claims at Falcon Lake, held by
Falcon Mining Inc.
- END -
Release authorised by the Board of Battery Age Minerals Ltd.
Contacts
Investors / Shareholders
Sebastian Kneer
Chief Executive Officer
P: +61 (0) 8 9465 1041
E: info@batteryage.au
ASX Announcement
Released 30 October 2026 9
References
1. Refer to Bleiberg earn-in terms and structure set out in the Company’s announcement dated 16 May 2024 and Prospectus
dated 7 December 2022. Zeeh, S. and Bechstadt,T. (1994). Carbonate-Hosted Pb-Zn Mineralisation at Bleiberg-Kreuth
(Austria): Compilation of Data0253-097X and New Aspects. In: Fontbote,L. and Boni,M. editors, Sediment Hosted Pb-Zn
Ores, Special Publication No. 10 of the Society for Geology Applied to Mineral Deposits. pp. 271-296. Cerny, I. (1991).
Lagerstättenforschung in Kärnten Neuergebnisse und Aspekte für die Zukunft. Carinthia ll 181./101. Jahrgang S. 119-129
Klagenfurt 1991. Cerny, I. and Schroll, E. (1995). Spezialmetallgehalte in ZnS-Konzentraten der Lagerstätte Bleiberg Kreuth.
Arch. f. Lagerstforsch. Geol. B.-A. ISSN 0253-097X Band 18 S. 5–33 Wien, Juni 1995. Schroll, E. (2006). Neues zur Genese
der Blei-Zink Lagerstätte Bleiberg. Carinthia II 196./116. Jahrgang Seiten 483-500 Klagenfurt 2006. Multi-Met (2023) Bleiberg
Project – Multi-Met, Multi. Available at: https://multimetdev.com/projects/bleiberg-project/. Schor, D. (2021) TSMC details 5
nm, WikiChip Fuse. Available at: https://fuse.wikichip.org/news/3398/tsmc-details-5-nm/ (Accessed: 25 February 2024).
Leach. D, Taylor. R, Fey. D et al.(2010), , A deposit model for Mississippi Valley-Type lead-zinc ores, USGS Scientific
Investigations Report 2010-5070-A. Mining Insights Pty Ltd, Independent Geologists Report, 1 December 2022. Refer also to
the Company’s ASX announcements dated 17 April 2025 (“Breakthrough Germanium Grades up to 1,500 g/t Identified in
Bleiberg Concentrates”) and 4 July 2025 (“Maiden Drilling Commences at Bleiberg”) for the reported historical germanium
production.
Compliance Statement
This report contains information on the Falcon Lake and Jessie Lake Projects extracted from an ASX market announcement dated
8 December 2022, 2 February 2023, 13 June 2023, 4 July 2023, 26 July 2023, 31 July 2023, 2 August 2023, 16 August 2023, 6
September 2023, 14 September 2023, 5 October 2023, 10 October 2023, 16 October 2023, 25 October 2023, 1 November 2023,
30 November 2023, 13 December 2023, 18 April 2024, 8 July 2024, 11 July 2024, 12 August 2024, 12 September 2024, 20
November 2024, 22 January 2025, 28 January 2025, 14 August 2025 and 22 July 2026 released by the Company and reported in
accordance with the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves” (JORC Code). The original market announcement is available to view on www.batteryage.au and www.asx.com.au.
Battery Age is not aware of any new information or data that materially affects the information included in the original market
announcement.
This report contains information on the Bleiberg and Hochobir Projects extracted from an ASX market announcement dated 8
December 2022, 2 February 2023, 13 July 2023, 21 August 2023, 26 February 2024, 26 March 2024, 23 April 2024, 16 May 2024,
29 August 2024, 18 December 2024, 22 January 2025, 29 January 2025, 17 April 2025, 18 December 2025 and 24 March 2026
released by the Company and reported in accordance with the 2012 edition of the “Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves” (JORC Code). The original market announcement is available to view on
www.batteryage.au and www.asx.com.au. Battery Age is not aware of any new information or data that materially affects the
information included in the original market announcement.
This report contains information on the El Aguila Project extracted from an ASX market announcement dated 31 January 2025, 28
May 2025, 5 September 2025,18 December 2025 and 5 March 2026 released by the Company and reported in accordance with the
2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code).
The original market announcement is available to view on www.batteryage.au and www.asx.com.au. Battery Age is not aware of
any new information or data that materially affects the information included in the original market announcement.
This report contains information on the Apex Project extracted from an ASX market announcement dated 31 October 2025, 6
November 2025, 31 March 2026 and 22 June 2026 released by the Company and reported in accordance with the 2012 edition of
the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). The original
market announcement is available to view on www.batteryage.au and www.asx.com.au. Battery Age is not aware of any new
information or data that materially affects the information included in the original market announcement.
Forward Looking Statements
Information included in this release constitutes forward-looking statements. Often, but not always, forward looking statements can
generally be identified by the use of forward looking words such as “may”, “will”, “expect”, “intend”, “plan”, “estimate”, “anticipate”,
“continue”, and “guidance”, or other similar words and may include, without limitation, statements regarding plans, strategies and
objectives of management, anticipated production or construction commencement dates and expected costs or production outputs.
Forward looking statements inherently involve known and unknown risks, uncertainties and other factors that may cause the
Company’s actual results, performance and achievements to differ materially from any future results, performance or achievements.
Relevant factors may include, but are not limited to, changes in commodity prices, foreign exchange fluctuations and general
economic conditions, increased costs and demand for production inputs, the speculative nature of exploration and project
development, including the risks of obtaining necessary licenses and permits and diminishing quantities or grades of reserves,
political and social risks, changes to the regulatory framework within which the company operates or may in the future operate,
environmental conditions including extreme weather conditions, recruitment and retention of personnel, industrial relations issues
and litigation. Forward looking statements are based on the Company and its management’s good faith assumptions relating to the
financial, market, regulatory and other relevant environments that will exist and affect the Company’s business and operations in
the future. The Company does not give any assurance that the assumptions on which forward looking statements are based will
prove to be correct, or that the Company’s business or operations will not be affected in any material manner by these or other
factors not foreseen or foreseeable by the Company or management or beyond the Company’s control. Although the Company
attempts and has attempted to identify factors that would cause actual actions, events or results to differ materially from those
disclosed in forward looking statements, there may be other factors that could cause actual results, performance, achievements or
events not to be as anticipated, estimated or intended, and many events are beyond the reasonable control of the Company.
Accordingly, readers are cautioned not to place undue reliance on forward looking statements. Forward looking statements in these
materials speak only at the date of issue. Subject to any continuing obligations under applicable law or any relevant stock exchange
listing rules, in providing this information the company does not undertake any obligation to publicly update or revise any of the
forward-looking statements or to advise of any change in events, conditions or circumstances on which any such statement is based.
ASX
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Battery Age Minerals Limited
ABN Quarter ended (“current quarter”)
80 085 905 997 30 September 2026
Consolidated statement of cash flows Current
quarter
$A’000
Year to date
(3 months)
$A’000
1. Cash flows from operating activities
1.1 Receipts from customers - -
1.2 Payments for
(a) exploration & evaluation (320) (320)
(b) development - -
(c) production - -
(d) staff costs (159) (159)
(e) administration and corporate costs (290) (290)
1.3 Dividends received (see note 3) - -
1.4 Interest received 11 11
1.5 Interest and other costs of finance paid - -
1.6 Income taxes paid - -
1.7 Government grants and tax incentives - -
1.8 Other (provide details if material) - -
1.9 Net cash from / (used in) operating activities (758) (758)
2. Cash flows from investing activities
2.1 Payments to acquire or for:
(a) entities - -
(b) tenements - -
(c) property, plant and equipment - -
(d) exploration & evaluation (76) (76)
(e) investments - -
(f) other non-current assets - -
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current
quarter
$A’000
Year to date
(3 months)
$A’000
2.2 Proceeds from the disposal of:
(a) entities - -
(b) tenements - -
(c) property, plant and equipment - -
(d) investments - -
(e) other non-current assets - -
2.3 Cash flows from loans to other entities - -
2.4 Dividends received (see note 3) - -
2.5 Other (provide details if material) - -
2.6 Net cash from / (used in) investing activities (76) (76)
3. Cash flows from financing activities
3.1 Proceeds from issues of equity securities (excluding
convertible debt securities) - -
3.2 Proceeds from issue of convertible debt securities - -
3.3 Proceeds from exercise of options - -
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
- -
3.5 Proceeds from borrowings - -
3.6 Repayment of borrowings (5) (5)
3.7 Transaction costs related to loans and borrowings - -
3.8 Dividends paid - -
3.9 Other (provide details if material) - -
3.10 Net cash from / (used in) financing activities (5) (5)
4. Net increase / (decrease) in cash and cash
equivalents for the period
4.1 Cash and cash equivalents at beginning of period 1,955 1,955
4.2 Net cash from / (used in) operating activities
(item 1.9 above)
(758) (758)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
(76) (76)
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
(5) (5)
4.5 Effect of movement in exchange rates on cash held 1 1
4.6 Cash and cash equivalents at end of period 1,117 1,117
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 3
+ See chapter 19 of the ASX Listing Rules for defined terms.
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 65 55
5.2 Call deposits 1,052 1,900
5.3 Bank overdrafts - -
5.4 Other (provide details) - -
5.5 Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
1,117 1,955
6. Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1 Aggregate amount of payments to related parties and their
associates included in item 1
50
6.2 Aggregate amount of payments to related parties and their
associates included in item 2
-
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
7. Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1 Loan facilities - -
7.2 Credit standby arrangements - -
7.3 Other (please specify) - -
7.4 Total financing facilities - -
7.5 Unused financing facilities available at quarter end -
7.6 Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
Not applicable - the Company has no financing facilities at quarter end (insurance premium
funding excluded).
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 4
+ See chapter 19 of the ASX Listing Rules for defined terms.
8. Estimated cash available for future operating activities $A’000
8.1 Net cash from / (used in) operating activities (item 1.9) (758)
8.2 (Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(76)
8.3 Total relevant outgoings (item 8.1 + item 8.2) (834)
8.4 Cash and cash equivalents at quarter end (item 4.6) 1,117
8.5 Unused finance facilities available at quarter end (item 7.5) -
8.6 Total available funding (item 8.4 + item 8.5) 1,117
8.7 Estimated quarters of funding available (item 8.6 divided by
item 8.3)
1.34
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8 If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1 Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: No. Net operating cash outflows for the quarter of $758k included non-recurring
payments of approximat