Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
1
DECEMBER 2025
ASX Announcement
Battery Age Minerals Ltd
ASX: BM8
ACN 085 905 997
batteryageminerals.au
T: +61 (8) 6109 6689
E: info@batteryage.au
Level 50, 108 St Georges Terrace
Perth, WA 6000
PO Box 7310, Cloisters Square PO, WA 6850 2
Released 30 January 2026
December 2025 Quarterly Activities Report
Key highlights:
• Bleiberg Maiden Drilling Program Finalised
The Company completed its first modern diamond drilling program at Bleiberg, comprising
six diamond drill holes for approximately 1,685 metres, testing multiple high-priority targets
within the historic Bleiberg–Kreuth mining district. Assays are pending.
• Maiden RC Drilling Program Completed at El Aguila
At El Aguila, Battery Age completed a 23-hole reverse circulation drilling program totalling
more than 2,500 metres, testing multiple kilometre-scale gold–silver targets. Geological
logging confirmed widespread alteration consistent with a large epithermal system, with
assays pending.
• Falcon Lake Consolidated to 100% Ownership
The Company secured 100% ownership of the Falcon Extension, consolidating a
contiguous 51 km² district-scale lithium landholding at Falcon Lake, Ontario, strengthening
the project’s long-term resource and expansion potential.
• Strong Balance Sheet Following $5.5 Million Capital Raising
Battery Age completed a A$5.5 million capital raising, providing funding to support drilling
at Bleiberg and El Aguila, early-stage exploration at the Apex Germanium–Gallium Project
(USA), and broader portfolio advancement.
• US Germanium-Gallium at Apex
Battery Age advanced early-stage exploration at the Apex Germanium–Gallium Project in
Utah, securing a strategic position adjacent to one of the only known high-grade
germanium–gallium systems in the United States.
• Leadership Transition Announced
Subsequent to Quarter end, the Company announced the appointment of Mr Sebastian
Kneer as Chief Executive Officer, with an orderly transition process underway with Mr Nigel
Broomham to ensure continuity as Battery Age enters its next phase of growth.
Battery Age Minerals Ltd (ASX: BM8, “Battery Age”, or “the Company”) is pleased to present
this Quarterly Activities Report, providing a summary of the exploration, corporate, and
operational milestones achieved during the three-month period ending 31 December 2025
(“Quarter”), across the Company’s exploration portfolio in Austria, Argentina, US and Canada.
During the December 2025 Quarter, Battery Age successfully completed its 2025 drilling
programs across its two core growth assets: the Bleiberg Zinc–Germanium Project in Austria
and the El Aguila Gold–Silver Project in Santa Cruz Province, Argentina. The completion of
these programs represents a major technical and operational milestone for the Company,
transitioning both projects into a results-driven phase.
Across the broader portfolio, the Company also progressed strategic land consolidation in
Canada, advanced early-stage exploration activities in the United States and strengthened its
corporate platform ahead of the 2026 field season.
ASX Announcement
Released 30 January 2026 3
Project Activities
Bleiberg Zinc-Germanium Project (Bad Bleiberg, Austria)
Completion of 2025 Diamond Drilling Program
During the Quarter, Battery Age completed its maiden modern diamond drilling program at
the Bleiberg Zinc–Germanium Project, marking the first drilling undertaken in the district
since mining ceased in the early 1990s.
The 2025 program comprised six (6) diamond drill holes for a total of approximately 1,685
metres, completed by European drilling contractor GEOPS Bohrgesellschaft mbH. Drilling
targeted multiple high-priority zones within the historically productive Bleiberg–Kreuth mining
district, identified through detailed reinterpretation of historical mine records, geological
mapping and structural analysis.
Geological logging identified zones of brecciation, alteration and sulphide mineralisation
consistent with the Company’s geological model (visual observations only). All drill core has
been logged, cut and submitted to ALS Laboratories for analysis. Assay results were pending
at the end of the reporting period and will be reported to the market following receipt, validation
and interpretation.
The successful completion of the 2025 program represents a foundational step in modern
exploration at Bleiberg and will inform the next phase of target refinement and drilling.
The Bleiberg Project remains central to Battery Age’s European critical-minerals strategy,
providing the Company with a unique opportunity to establish a secure, EU-based source of
germanium, a critical element for semiconductors, fibre optics, and defence technologies.
Figure 1: Bleiberg Zinc Lead Germanium Project located in the state of Carinthia, Austria.
ASX Announcement
Released 30 January 2026 4
Figure 2: Bleiberg maiden drilling program – permitted drilling locations
Forward work program
Three historically referenced high-grade zones west of the Sattler Shaft, Josefischolle,
Riedhartscholle and Kalkscholle – which were historically reported to contain some of the
highest Zn–Ge grades within the wider Bleiberg corridor, are being incorporated into BM8’s
next drilling permit application, scheduled for lodgement in Q1 2026.
Figure 3: Battery Age exploration tenure, historic mining corridor and production shafts, including Antoni shaft
(X474158.8; Y 5165543.6). Inset table demonstrates historical data for the Bleiberg Mine from previous
workings1
. 100% staked claims identified in blue & orange (Bleiberg West concessions) and existing earn-in
claims shown in red (Bleiberg concessions).
ASX Announcement
Released 30 January 2026 5
El Aguila Gold-Silver Project (Santa Cruz, Argentina)
Completion of 2025 Maiden RC Drilling Program
During the Quarter, Battery Age completed its maiden reverse circulation (RC) drilling program
at the El Aguila Gold–Silver Project, located within the Deseado Massif of Santa Cruz Province,
Argentina.
The program comprised 23 RC drill holes for more than 2,500 metres, completed across the
Aguila Main, Aguila South and San Cristobal target areas. Drilling was designed to test near-
surface mineralisation and assess strike continuity across multiple kilometre-scale structural
corridors.
Geological logging identified widespread hydrothermal alteration and veining consistent with a
low-sulphidation epithermal gold–silver system, supporting the interpretation of a large and
well-preserved mineralised system. More than 2,400 samples were collected and submitted to
ALS Global for assay.
All drilling was completed safely and in accordance with approved permits. Assay results
remain pending at the end of the Quarter and will be reported once received and validated.
Permits remain in place to continue drilling at El Aguila, with additional approvals being
progressed to support future diamond drilling programs targeting depth extensions and
structurally controlled zones largely untested below approximately 100 metres.
Figure 4: El Aguila – located in the rich gold and silver mining region of Santa Cruz. Proximal to large scale
operating Au and Ag mines.
ASX Announcement
Released 30 January 2026 6
Figure 5: El Aguila project geology. Kilometre scale interpreted mineralised veins outlined in red.
Forward work program
The Company plans to commence diamond drilling at the El Aguila Gold–Silver Project in the
first half of calendar year 2026, subject to receipt of final assay results, permitting and logistical
readiness. The proposed diamond drilling program is intended to build on the outcomes of the
2025 maiden RC program, with a focus on testing depth extensions, structural controls and
priority zones largely untested below approximately 100 metres, as well as selected strike
extensions across the Aguila Main, Aguila South and San Cristobal target areas. Results from
the RC drilling program will be used to refine collar locations and optimise drill design ahead
of commencement.
Falcon Lake Lithium Project (Ontario, Canada)
Falcon Extension – 100% Ownership
During the Quarter, the Company completed the final stage of its earn-in to secure 100%
ownership of the Falcon Extension properties in Ontario, Canada. The consolidation of the
Falcon Extension strengthens Battery Age’s control over the broader Falcon Lake Lithium
Project, forming a contiguous and highly prospective land package within a proven lithium-
bearing greenstone belt.
This transaction links Falcon Main, Falcon North and Falcon Extension into a single contiguous
51 km² land position across the Caribou O’Sullivan Greenstone Belt in Ontario, the same belt
that has already delivered BM8’s thick, high-grade spodumene intercepts. Consolidation
materially strengthens BM8’s control of a district-scale, lithium-endowed corridor with multi-
commodity upside, and positions Falcon Lake for future resource definition and expansion.
ASX Announcement
Released 30 January 2026 7
Previous drilling within the Falcon Lake Project has returned thick, high-grade spodumene-
bearing pegmatite intercepts, with additional multi-element geochemistry confirming
enrichment in several critical metals. The Company continues to maintain the project in good
standing while assessing future exploration timing in line with market conditions.
Previous drilling at Falcon Lake has returned multiple thick, high-grade spodumene-bearing
pegmatite intercepts, reinforcing the scale and quality of the mineralised system. Notable
intersections include:
• 54.1 m @ 1.74% Li₂O (hole 24FL-107);
• 55.95 m @ 1.47% Li₂O (hole 24FL-108);
• 43.0 m @ 1.62% Li₂O (hole 24FL-114); and
• 22.55 m @ 1.74% Li₂O (hole 24FL-113).
These results highlight the potential for substantial lithium mineralisation across the Falcon
Lake Project and support its continued advancement in 2026.
Apex Germanium Gallium Project (Utah, USA)
Battery Age announced the staking of 129 unpatented lode mining claims covering
approximately 2,660 acres adjacent to the historic Apex Mine in southern Utah, USA, marking
the Company’s first germanium- and gallium-focused asset in North America.
The Apex Mine – also known as the Dixie Mine – was the world’s first operation developed
primarily for germanium and gallium production, historically reporting grades up to 0.7 % Ge
(7,000 g/t) and 2 % Ga (20,000 g/t), together with significant silver by-production. Battery Age’s
newly secured tenure captures the key structural corridors and stratigraphic horizons
associated with the Apex Fault Zone and the brecciated Callville Limestone–Pakoon Dolomite
contact, the principal host to mineralisation at the historic mine.
Apex Mine represents one of the only known high-grade Ge–Ga systems in the United States
and is strategically positioned amid ongoing U.S. initiatives to re-establish secure domestic
supply chains for semiconductor-critical metals. The Project directly complements the
Company’s Bleiberg Project in Austria, establishing a strong, Western-aligned germanium
footprint spanning the United States and the European Union.
During the Quarter, Battery Age advanced early-stage exploration activities at the Apex
Germanium Project in the United States. Initial field programs commenced to verify historical
germanium occurrences and assess the broader geological setting.
University of Sydney Collaboration
Battery Age executed a Consultancy Agreement and exclusive option with the University of
Sydney’s School of Chemical and Biomolecular Engineering, led by Professor Kourosh
Kalantar-Zadeh, Dr Francois Allioux and Mr Luis Gustavo Campos, to test and assess
advanced recovery techniques for germanium.
The project will evaluate innovative electromagnetic-based processing methods for
germanium extraction, with arrangements allowing Battery Age to access the research
outcomes for testing and evaluation. Should BM8 wish to pursue long-term use, the Company
holds an exclusive option to negotiate a licence to use both any resulting project IP and
specified University background IP, limited to the field of germanium extraction.
ASX Announcement
Released 30 January 2026 8
This initiative provides Battery Age with exposure to cutting-edge recovery and recycling
research, complementing its exploration and development programs and supporting its
broader strategy to establish a vertically integrated germanium supply platform across its
Bleiberg and Apex projects.
Jesse Lake Lithium Project (Ontario, Canada)
No exploration activities were conducted during the Quarter.
King Tut Project (Argentina)
No exploration activities were conducted during the Quarter.
Bloom Lake Project (Bloom Lake, Canada)
No exploration activities were conducted during the Quarter.
Next Steps
Battery Age enters 2026 following the completion of its 2025 drilling programs at Bleiberg and
El Aguila, and with a strengthened technical and corporate platform.
Key priorities for the coming period include:
• Submission of a follow-up drilling application at the Bleiberg Zinc–Germanium Project,
informed by receipt and interpretation of assay results from the 2025 diamond drilling
program, and ongoing refinement of the geological and structural model.
• Diamond drilling at the El Aguila Gold–Silver Project in H1 CY2026, subject to
permitting and final results from the maiden RC program, targeting depth and strike
extensions of the system.
• Preparation for future drilling operations at the Falcon Lake Lithium Project, including
target refinement, permitting and logistical planning, with a view to recommencing
drilling during 2026 when conditions are appropriate.
• Continued disciplined capital management and stakeholder engagement to support
exploration activities across the Company’s portfolio.
Corporate
Leadership Transition and Continuity
Subsequent to Quarter end, the Company announced the appointment of Mr Sebastian Kneer
as Chief Executive Officer, effective 2 February 2026. Mr Kneer brings extensive international
exploration and project development experience across multiple commodities and jurisdictions
and is well positioned to lead the Company through its next phase of growth.
The outgoing Chief Executive Officer, Mr Nigel Broomham, will work closely with Mr Kneer
during a transition period to ensure continuity and effective handover. The Board
acknowledged Mr Broomham’s contribution to the Company, particularly in establishing
Battery Age’s critical minerals portfolio and advancing the Falcon Lake, Bleiberg and El Aguila
projects through key permitting and drilling milestones.
ASX Announcement
Released 30 January 2026 9
Capital Raising
During the Quarter, Battery Age completed a capital raising of A$5.5 million (before costs) to
strengthen its balance sheet and fund ongoing exploration activities across its global portfolio.
Proceeds are being applied to accelerate drilling at the Bleiberg Zinc–Lead–Germanium
Project in Austria, advance drilling at the El Aguila Gold–Silver Project in Argentina, commence
exploration at the Apex Germanium–Gallium Project in the United States, and for general
working capital and corporate purposes.
Business Development
The Company continues to review potential strategic opportunities that are complementary to
its existing asset base and aligned with its stated strategic objectives. The Company is actively
assessing additional germanium enrichment, recycling and application technologies to
complement its Ge focus, further aligning the Company with emerging Western initiatives in
semiconductor and advanced-materials supply chains. Any such opportunities are assessed
with a focus on value creation and portfolio balance. There is no certainty that these reviews
or discussions will result in the acquisition of additional projects.
Appendix 5B
The Appendix 5B quarterly cashflow report for the Quarter is submitted separately.
The Group closed the Quarter with a cash balance of $4,492k. Exploration expenditure during
the Quarter totalled $1,084k (unaudited).
The Company currently holds 34.5m shares in Eminence Minerals (EMA) which has a cash
value at the end of the Quarter of: $2.07m at $0.06 per share (share price 31 December 2025).
Payments to Related Parties
Pursuant to section 6 of the Company’s Appendix 5B, and as required under ASX Listing Rule
5.3.5, during the Quarter the Company paid $49k to the Directors for remuneration.
Capital Structure
The capital structure at the end of the Quarter was as follows:
• 221,427,559 Ordinary Shares.
• 76,404,928 Options.
• 1,535,000 Performance Rights.
Interests in Mining Tenements as at 31 December 2025
Location Tenement Reference
Interest during
Quarter
Interest at the
end of Quarter
Western Australia1
M47/1450 (0.03%) 22.19%
Canada, Bloom Lake 221266, 221267, 229223
243759, 251792, 251793
251794, 287807, 308044
325202, 336173, 582713
582714, 716167, 716168, 716165,
716166, 716170, 716171, 716169
- 100%
ASX Announcement
Released 30 January 2026 10
Location Tenement Reference
Interest during
Quarter
Interest at the
end of Quarter
Canada, Falcon Lake
- Central
727287 to 727384
668831, 670166, 670168, 721084,
721085, 746214, 754668
2
106057-106058, 121357-121360,
122094, 132858-132859, 134102,
136948, 136962, 142489, 148810,
164547-164548, 166603, 178073,
179345, 185376-185377, 186114-
186115, 208573, 209065, 215331,
224637-224639, 237714-237716,
244810, 246081, 252181, 256393-
256395, 274457, 281913, 289275,
291550, 301417-301418, 302155,
311782-311784
-
-
-
100%
100%
90%
- West 881301 - 100%
- East 881299, 881300 - 100%
Canada, Jessie Lake 834651 – 834704
835652 - 835724
- 100%
Austria, Bleiberg3
EL 476/22 (BB1) – 591/22 (BB116)
1524/23 (1/23) – 1583/23 (60/23)
1413/24 – 1542/24 (545/24 - 674/24)
-
-
51%
100%
Austria, Hochibir 774/24 (1/24) - 1387/24 (614/24)
1389/24 (615/24) – 1412/24 (638/24)
- 100%
Argentina4
168-L-1939 - 100%
66-C-2005 - 100%
28-L-2011 - 100%
1. Battery Age’s interest in the Hamersley Iron Ore Project is held indirectly by way of its investment held in Eminence
Minerals Limited. Reduced interest as a result of dilution due to equity placements completed by EMA during the period.
2. The Company may acquire the final 10% of the above identified Falcon Lake tenements by paying an amount equal to
the lower of (i) the price determined by an independent valuation, or (ii) A$2,000,000.
3. The Company may acquire a further 14% interest (total 65%) in the above Bleiberg tenements within 36 months of
acquiring the abovementioned 36% interest by incurring an additional C$3,500,000 in expenditure on the project.
The Company may acquire the final 15% interest (total 80%) in the above Bleiberg tenements within 6.5 years from
executing the Bleiberg Addendum Agreement upon completion of a Bankable Feasibility Study that is compliance to JORC
and indicates the project will have a production rate of at least 100,000 tonnes per year.
4. As announced on 31 January 2025, the Company has entered into a Farm-In Agreement with Fredonia Mining Inc. to
earn up to 80% to 100% ownership of the El Aguilia Project in the Santa Cruz province, Argentina. Refer to announcement
dated 31 January 2025 for full terms and conditions of the Farm-In Agreement.
- END -
Release authorised by the Board of Battery Age Minerals Ltd.
Contacts
Investors / Shareholders
Nigel Broomham
Chief Executive Officer
P: +61 (0) 8 6109 6689
E: info@batteryage.au
ASX Announcement
Released 30 January 2026 11
References:
1. Refer to earn-in terms and structure set out in the Company’s Prospectus dated 7 December 2022, and announcement 16
May 2024.
2. Schroll,e. (2006). Neues zur Genese der Blei-Zink Lagerstätte Bleiberg. Carinthia II 196./116. Jahrgang Seiten 483-500
Klagenfurt 2006
3. Cerny,I. (1991). Lagerstättenforschung in Kärnten Neuergebnisse und Aspekte für die Zukunft. Carinthiall 181./101.
Jahrgang S. 119-129 Klagenfurt 1991, Cerny,I. and Schroll,E. (1995). Spezialmetallgehalte in ZnS-Konzentraten der
Lagerstätte Bleiberg-Kreuth. Arch. f. Lagerst.forsch. Geol. B.-A. ISSN 0253-097X Band 18 S. 5–33 Wien, Juni 1995;
Schroll,e. (2006). Neues zur Genese der Blei-Zink Lagerstätte Bleiberg. Carinthia II 196./116. Jahrgang Seiten 483-500
Klagenfurt 2006
4. Germanium-based transistors for future high performance and low ... (2015) TSMC Logic. Available at:
https://research.tsmc.com/page/high-mobility-channel/14.html.
5. Multi-Met (2023) Bleiberg Project - Multi-Met, Multi. Available at: https://multimetdev.com/projects/bleiberg-project/
6. Leach. D, Taylor. R, Fey. D et al.(2010), , A deposit model for Mississippi Valley-Type lead-zinc ores, USGS Scientific
Investigations Report 2010-5070-A
7. Schor, D. (2021) TSMC details 5 nm, WikiChip Fuse. Available at: https://fuse.wikichip.org/news/3398/tsmc-details-5-nm/
(Accessed: 25 February 2024).
Compliance Statement
This report contains information on the Falcon Lake and Jessie Lake Projects extracted from an ASX market announcement dated
8 December 2022, 2 February 2023, 13 June 2023, 4 July 2023, 26 July 2023, 31 July 2023, 2 August 2023, 16 August 2023, 6
September 2023, 14 September 2023, 5 October 2023, 10 October 2023, 16 October 2023, 25 October 2023, 1 November 2023,
30 November 2023, 13 December 2023, 18 April 2024, 8 July 2024, 11 July 2024, 12 August 2024, 12 September 2024, 20
November 2024, 22 January 2025, 28 January 2025 and 14 August 2025 released by the Company and reported in accordance
with the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC
Code).
This report contains information on the Bleiberg and Hochobir Projects extracted from an ASX market announcement dated 8
December 2022, 2 February 2023, 13 July 2023, 21 August 2023, 26 February 2024, 26 March 2024, 23 April 2024, 16 May 2024,
29 August 2024, 18 December 2024, 22 January 2025, 29 January 2025, 17 April 2025 and 18 December 2025 released by the
Company and reported in accordance with the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves” (JORC Code). The original market announcement is available to view on www.batteryage.au and
www.asx.com.au. Battery Age is not aware of any new information or data that materially affects the information included in the
original market announcement.
This report contains information on the El Aguila Project extracted from an ASX market announcement dated 31 January 2025, 28
May 2025, 5 September 2025 and 18 December 2025 released by the Company and reported in accordance with the 2012 edition
of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). The original
market announcement is available to view on www.batteryage.au and www.asx.com.au. Battery Age is not aware of any new
information or data that materially affects the information included in the original market announcement.
This report contains information on the Apex Project extracted from an ASX market announcement dated 31 October 2025 released
by the Company and reported in accordance with the 2012 edition of the “Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves” (JORC Code). The original market announcement is available to view on www.batteryage.au
and www.asx.com.au. Battery Age is not aware of any new information or data that materially affects the information included in the
original market announcement.
Forward Looking Statements
Information included in this release constitutes forward-looking statements. Often, but not always, forward looking statements can
generally be identified by the use of forward looking words such as “may”, “will”, “expect”, “intend”, “plan”, “estimate”, “anticipate”,
“continue”, and “guidance”, or other similar words and may include, without limitation, statements regarding plans, strategies and
objectives of management, anticipated production or construction commencement dates and expected costs or production outputs.
Forward looking statements inherently involve known and unknown risks, uncertainties and other factors that may cause the
Company’s actual results, performance and achievements to differ materially from any future results, performance or achievements.
Relevant factors may include, but are not limited to, changes in commodity prices, foreign exchange fluctuations and general
economic conditions, increased costs and demand for production inputs, the speculative nature of exploration and project
development, including the risks of obtaining necessary licenses and permits and diminishing quantities or grades of reserves,
political and social risks, changes to the regulatory framework within which the company operates or may in the future operate,
environmental conditions including extreme weather conditions, recruitment and retention of personnel, industrial relations issues
and litigation. Forward looking statements are based on the Company and its management’s good faith assumptions relating to the
financial, market, regulatory and other relevant environments that will exist and affect the Company’s business and operations in
the future. The Company does not give any assurance that the assumptions on which forward looking statements are based will
prove to be correct, or that the Company’s business or operations will not be affected in any material manner by these or other
factors not foreseen or foreseeable by the Company or management or beyond the Company’s control. Although the Company
attempts and has attempted to identify factors that would cause actual actions, events or results to differ materially from those
disclosed in forward looking statements, there may be other factors that could cause actual results, performance, achievements or
events not to be as anticipated, estimated or intended, and many events are beyond the reasonable control of the Company.
Accordingly, readers are cautioned not to place undue reliance on forward looking statements. Forward looking statements in these
materials speak only at the date of issue. Subject to any continuing obligations under applicable law or any relevant stock exchange
listing rules, in providing this information the company does not undertake any obligation to publicly update or revise any of the
forward-looking statements or to advise of any change in events, conditions or circumstances on which any such statement is based.
ASX
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
BATTERY AGE MINERALS LTD
ABN Quarter ended (“current quarter”)
80 085 905 997 31 December 2025
Consolidated statement of cash flows Current quarter
$A’000
Year to date (6
months)
$A’000
1. Cash flows from operating activities
- -
1.1 Receipts from customers
1.2 Payments for
(102) (103)
(a) exploration & evaluation
(b) development - -
(c) production - -
(d) staff costs (208) (449)
(e) administration and corporate costs (593) (1,021)
1.3 Dividends received (see note 3) - -
1.4 Interest received - -
1.5 Interest and other costs of finance paid - -
1.6 Income taxes paid - -
1.7 Government grants and tax incentives - -
1.8 Other (provide details if material - -
1.9 Net cash from / (used in) operating
activities
(903) (1,573)
2. Cash flows from investing activities
- -
2.1 Payments to acquire or for:
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) exploration & evaluation (982) (2,047)
(e) investments - -
(f) other non-current assets - -
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (6
months)
$A’000
2.2 Proceeds from the disposal of:
- -
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) investments - -
(e) other non-current assets - -
2.3 Cash flows from loans to other entities - -
2.4 Dividends received (see note 3) - -
2.5 Other (provide details if material) - -
2.6 Net cash from / (used in) investing
activities
(982) (2,047)
3. Cash flows from financing activities
5,500 8,500
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
- -
3.3 Proceeds from exercise of options - -
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
(230) (414)
3.5 Proceeds from borrowings - -
3.6 Repayment of borrowings (8) (15)
3.7 Transaction costs related to loans and
borrowings
- -
3.8 Dividends paid - -
3.9 Other (leases) - -
3.10 Net cash from / (used in) financing
activities
5,262 8,071
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period
1,115 41
4.2 Net cash from / (used in) operating
activities (item 1.9 above)
(903) (1,573)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
(982) (2,047)
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
5,262 8,071
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 3
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (6
months)
$A’000
4.5 Effect of movement in exchange rates on
cash held
- -
4.6 Cash and cash equivalents at end of
period
4,492 4,492
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 4,492 1,115
5.2 Call deposits - -
5.3 Bank overdrafts - -
5.4 Other (Directors Capital Raise Feb 25) - -
5.5 Cash and cash equivalents at end of
qu