High-Grade Rubidium Identified at Falcon Lake
Released
Released
Announcement PDF
ASX Announcement
Released 14 August 2025
High-Grade Rubidium, Caesium, Gallium
and Tantalum Identified at Falcon Lake
Highlights
• Multi-element assays analysis confirms significant enrichment in critical metals
within the Falcon Lake pegmatites drilled:
o Rubidium (Rb) up to 11,400 ppm; mean 1,872 ppm.
o Caesium (Cs) up to 2,600 ppm; mean 86.5 ppm.
o Tantalum (Ta) up to 2,300 ppm; mean 51.4 ppm.
o Gallium (Ga) up to 95.6 ppm; mean 51.1 ppm.
• These critical element results complement exceptional lithium drilling results
achieved to date, including:
o 54.1 metres @ 1.74% Li2O from 100.85m down-hole, 24FL-107
o 55.95 metres @ 1.47% Li2O from 222.2m down-hole, 24FL-108
o 43.0 metres @ 1.62% Li2O from 62.2m down-hole, 24FL-114
o 22.55 metres @ 1.74% Li2O from 39.3m down-hole, 24FL-113
o 19.7 metres @ 1.62% Li2O from 57.5m down-hole, 24FL-112
o 21.6 metres @ 1.46% Li2O from 115.7m down-hole, 24FL-110
• Exploration Upside: Only 5 of the 30 high-priority targets identified through geophysical
surveys and surface sampling have been drill tested, leaving substantial scope for further
discoveries.
• Well-Positioned for Market Upside: With lithium prices showing signs of recovery,
Battery Age remains strategically placed to recommence on-ground work at Falcon Lake
as commodity markets continue to strengthen, leveraging high-grade discoveries and
multi-element potential.
Battery Age Minerals Ltd (ASX: BM8; “Battery Age” or “the Company”) is pleased to
announce multi-element assay analysis from its Falcon Lake Lithium Project in Ontario,
Canada, confirming high-value concentrations of tantalum, cesium, rubidium and gallium in
addition to previously reported high-grade spodumene mineralisation.
These results highlight Falcon Lake as not only a premier hard-rock lithium project but also a
potential source of multiple critical metals, strengthening its strategic significance.
Battery Age Minerals Ltd
ASX: BM8
ACN 085 905 997
batteryageminerals.au
T: +61 (8) 6109 6689
E: info@batteryage.au
Level 50, 108 St Georges Terrace
Perth, WA 6000
PO Box 7310, Cloisters Square Po, WA 6850
1
Maximum assay (ppm)
Element
Hole ID
Rb (ppm)
11,400
23FL-024
Cs (ppm)
2,600
Ta (ppm)
Ga (ppm)
Database
Mean (ppm)
From_To_m
50.55-51.3m
1,872
23FL-027
23.24-23.5m
86.5
2,300
24FL-111
113.9-114.81m
51.4
95.6
24FL-104
86.9-87.9m
51.1
Comment
37.7% of samples exceed
2,000 ppm (751 of 1,994
samples)
Significantly elevated
compared to regional LCT
pegmatites
Max assays high relative
to many operating
tantalum mines
Above cut-off grades
used at major North
American gallium projects
Table 1 – Falcon Lake Multi-Element Assay Results (Pegmatite Lithologies only – 1,994 samples).
Drilling Success to Date
Since acquisition, Battery Age has delivered outstanding drilling results at Falcon Lake, with
intercepts demonstrating exceptional thickness and grade of spodumene-bearing pegmatites:
Hole
24FL-107
From_m
1
1
24FL-108
24FL-1141
23FL-0312
24FL-1131
23FL-0013
24FL-0874
24FL-1004
24FL-0984
24FL-1121
100.85
222.2
62.2
14.65
39.3
16.65
53.9
55
18.95
57.5
To_m
154.95
278.15
105.2
46.4
61.85
44.25
82.15
73.4
43.85
77.2
Interval_m
54.10
55.95
43.00
31.75
22.55
27.6
28.25
18.4
24.9
19.70
Li2O (%)
1.74
1.47
1.62
1.45
1.74
1.37
1.30
1.88
1.34
1.62
Table 2 – Falcon Lake Drilling Highlights. Intervals are down hole length, true width not known.
The late 2024 Falcon Little Lake discovery remains open to the south and at depth with
significant untested potential along the 5km mineralised corridor. The Falcon Lake Lithium
Project offers exceptional exploration upside, with only 5 of the 30 high-priority targets
identified through fieldwork tested to date. This leaves a vast proportion of the project area
largely untested and highly prospective. Early drilling has already confirmed the presence of
thick, high-grade spodumene-bearing pegmatites, while the remaining targets defined by
geophysical surveys and surface mapping and sampling, present outstanding opportunities to
extend known mineralised zones and discover new pegmatite bodies. Upcoming drilling
campaigns will systematically evaluate these targets to unlock the full-scale potential of the
Falcon Lake Project.
ASX Announcement
Released 14 August 2025
2
Figure 1 – Falcon Little Lake discovery plan view. 2024 Winter drilling highlighted.
A
A1
Falcon
Little Lake
Figure 2 – Plan view of the completed and planned drill hole collars across the Falcon Lake Mineralised corridore
ASX Announcement
Released 14 August 2025
3
Geological & Strategic Significance
The combined lithium and critical metal enrichment confirms Falcon Lake as a highly evolved
LCT pegmatite system, comparable to other Canadian systems such as Green Technology
Metals’ Aubry pegmatites and the Tanco Mine in Manitoba.
From a strategic perspective:
•
Tantalum – critical in electronics, aerospace and defence.
•
Caesium – used in atomic clocks, specialist drilling fluids, and imaging.
•
Rubidium – vital for quantum computing, fibre optics, and advanced glass.
•
Gallium – a key semiconductor and AI chip material; global supply dominated by
China.
Rubidium Market & Strategic Importance
Rubidium is a highly specialised alkali metal with no large-scale primary production, typically
recovered as a by-product from lithium or caesium operations. Prices for high-purity rubidium
compounds can exceed US$1,000/kg, reflecting the limited supply and specialised demand.
Rubidium is designated a critical mineral in Canada, the United States, and Japan,
underscoring its strategic importance and supply risk. It is increasingly valued for emerging
high-technology and defence applications.
With 37.7% of Falcon Lake pegmatite samples exceeding 2,000 ppm Rb, rubidium offers a
strategic dimension to the Project and the potential to deliver additional value as a future
source of this rare and critical element.
Next Steps
Battery Age will:
•
Apply targeted geochemistry and geophysics to vector towards additional highly
fractionated pegmatites.
•
Scope metallurgical test work to evaluate recovery of Ta, Cs, Rb and Ga alongside
spodumene concentrate production.
CEO Nigel Broomham commented:
Battery Age CEO, Nigel Broomham, commented:
“Falcon Lake has consistently delivered exceptional results. The multi-element database
review confirm we are defining not just a potential high-grade lithium system, but a project
enriched in several critical metals that are in high demand globally. This combination of scale,
grade, and multi-commodity potential makes Falcon Lake a standout asset in the critical
minerals space.”
References:
1.
Refer ASX Announcement dated 28 January 2025.
2.
Refer ASX Announcement dated 14 September 2023.
3.
Refer ASX Announcement dated 26 July 2023.
4.
Refer ASX Announcement dated 12 September 2024.
ASX Announcement
Released 14 August 2025
4
[ENDS]
Release authorised by the Board of Battery Age Minerals Ltd.
Contacts
Investors / Shareholders
Nigel Broomham
Chief Executive Officer
P: +61 (0)8 6109 6689
E: info@batteryage.au
Media
Kelly-Jo Fry
Battery Age Minerals
P: +61 (0)8 6109 6689
E: kjfry@batteryage.au
Competent Person Statement
The information in this Report that relates to Geological Data and Exploration Results for the Falcon Lake Lithium
Project is based on, and fairly represents, information and supporting documentation compiled and reviewed by Mr
Nigel Broomham (BSc (Hons) Geology & Resource Economics) who is a Member of the Australasian Institute of
Mining and Metallurgy (AusIMM) and holds a Professional Certificate in JORC Code Reporting. Mr Broomham is
the Chief Executive Officer of Battery Age Minerals. Mr Broomham has sufficient experience which is relevant to
the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to
qualify as a Competent Person as defined in the 2012 Edition of the Joint Ore Reserves Committee (JORC)
"Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr Broomham
consents to the inclusion in this report of the matters based on information in the form and context in which they
appear. Mr Broomham holds securities in the Company.
The Company confirms that it is not aware of any new information or data that materially affects the information
included in any original announcement and that all material assumptions and technical parameters underpinning
the estimates in the original market announcement continue to apply and have not materially changed.
Compliance Statement
This report contains information on the Falcon Lake Project extracted from an ASX market announcement dated 7
December 2022, 2 February 2023, 4 July 2023, 26 July 2023, 31 July 2023, 2 August 2023, 16 August 2023, 6
September 2023, 14 September 2023, 5 October 2023, 10 October 2023, 16 October 2023, 25 October 2023, 30
November 2023, 13 December 2023, 8 July 2024, 12 August 2024, 12 September 2024, 20 November 2024 and
28 January 2025 released by the Company and reported in accordance with the 2012 edition of the “Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). The original
market announcement is available to view on www.batteryage.au and www.asx.com.au. Battery Age is not aware
of any new information or data that materially affects the information included in the original market announcement.
Forward-Looking Statement
This announcement may contain certain forward-looking statements and projections. Such forward looking
statements/projections are estimates for discussion purposes only and should not be relied upon. Forward looking
statements/projections are inherently uncertain and may therefore differ materially from results ultimately achieved.
Battery Age Minerals Limited does not make any representations and provides no warranties concerning the
accuracy of the projections and disclaims any obligation to update or revise any forward-looking statements/projects
based on new information, future events or otherwise except to the extent required by applicable laws. While the
information contained in this report has been prepared in good faith, neither Battery Age Minerals Limited or any of
its directors, officers, agents, employees or advisors give any representation or warranty, express or implied, as to
the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this
announcement.
ASX Announcement
Released 14 August 2025
5
Appendix 1 – Drill Collar Positions & Mineralised Intercepts
Hole
From_m
To_m
Interval_m
Li2O (%)
Rb ppm
Cs ppm
Ga ppm
Ta ppm
23FL-001
16.65
44.25
27.6
1.37
2443
213
61
73
23FL-002
7.5
16.2
8.7
1.24
2691
125
58
107
23FL-002
62
86
24
0.32
1771
85
56
42
23FL-004
5.7
27.62
21.92
1.44
2571
228
61
58
23FL-005
46.3
76.05
29.75
0.81
2082
134
57
55
23FL-017
23.2
29.09
5.89
1.23
3057
581
51
74
23FL-018
3.6
12.25
8.65
2.04
1506
196
53
75
23FL-018
13.75
19.8
6.05
1.23
1885
61
60
30
23FL-020
22.05
33.5
11.45
1.33
2572
97
48
70
23FL-023
56.05
63.21
7.16
1.63
2810
355
63
68
23FL-024
5.4
18.75
13.35
1.50
1160
146
59
49
23FL-030
3.7
18.4
14.7
1.50
3577
130
57
82
23FL-031
14.65
46.4
31.75
1.45
2269
148
56
38
23FL-033
57.03
64.5
7.47
1.02
2402
183
58
45
23FL-047
77.7
83.2
5.5
0.73
1968
42
52
36
23FL-058
11.1
27
15.9
0.95
1915
33
49
23
23FL-059
19.65
47
27.35
0.83
2081
36
54
28
23FL-060
23.85
31
7.15
1.06
2110
37
56
30
23FL-061
11.95
30
18.05
1.02
1785
51
58
34
23FL-063
10.65
17
6.35
1.06
1652
27
53
25
23FL-065
26.6
37.75
11.15
1.05
1851
45
50
26
23FL-067
28.5
47.6
19.1
1.34
1782
116
51
73
23FL-069
32.7
38.3
5.6
1.27
1949
100
54
71
23FL-070
38.2
43.4
5.2
1.75
1192
90
57
90
23FL-071
46.8
64
17.2
0.92
2116
67
54
33
23FL-072
48.8
69
20.2
0.58
2192
46
51
27
23FL-075
26.7
39.6
12.9
1.36
2292
46
47
41
23FL-076
1.75
20.7
18.95
1.65
1604
33
47
33
23FL-077
37.8
56.25
18.45
1.40
1911
42
44
40
23FL-081
66.6
87.25
20.65
1.48
2133
43
51
39
23FL-082
91.55
99.45
7.9
1.40
2048
46
53
45
24FL-087
53.9
82.15
28.25
1.30
2260
44
48
28
24FL-087
88.7
112
23.3
1.13
1880
91
46
177
24FL-087
39.5
46.85
7.35
1.38
1585
69
41
51
24FL-088
99.8
116.6
16.8
0.99
1190
35
42
32
24FL-088
82.15
95.9
13.75
1.15
1299
38
40
34
24FL-089
148.1
159
10.9
0.97
1698
30
48
25
24FL-091
155.1
158.1
3
1.19
1453
51
45
44
24FL-092
28
30.9
2.9
1.25
2028
91
50
28
24FL-098
18.95
43.85
24.9
1.34
1551
62
47
30
ASX Announcement
Released 14 August 2025
6
24FL-100
55
73.4
18.4
1.88
1331
63
56
26
24FL-102
57.5
83.1
25.6
0.93
1207
28
51
32
24FL-103
64.55
99.25
34.7
0.53
1618
28
58
22
24FL-104
71.1
93.2
22.1
0.80
1607
31
58
25
24FL-105
88.7
129.5
40.8
0.49
1764
30
57
17
24FL-107
100.85
154.95
54.10
1.74
2107
93
54
45
24FL-107
42.05
49.95
7.90
1.01
1642
67
53
34
24FL-108
222.2
278.15
55.95
1.47
2751
142
56
32
24FL-108
59.7
71
11.30
0.74
1814
52
53
30
24FL-109
211.15
218
6.85
1.57
2682
67
53
32
24FL-109
178.05
184.5
6.45
1.19
1780
53
55
51
24FL-109
87.65
91.65
4.00
1.71
2170
71
58
43
24FL-109
44.58
52.4
7.82
0.82
2063
47
59
19
24FL-110
115.7
137.3
21.60
1.46
1688
97
49
41
24FL-111
30.6
37.2
6.60
1.72
1655
52
49
51
24FL-111
41.3
46.85
5.55
1.56
2052
122
48
40
24FL-112
57.5
77.2
19.70
1.62
1909
63
52
43
24FL-113
39.3
61.85
22.55
1.74
1962
65
49
42
24FL-114
62.2
105.2
43.00
1.62
1782
69
48
40
Azimuth
300
300
300
300
300
300
300
300
300
300
300
300
300
300
300
300
300
300
300
300
300
300
Dip
60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-80
-60
-60
-60
-60
-60
-60
-60
Table 1 – Significant Intercepts at Falcon Lake to date.
Hole
23FL-001
23FL-002
23FL-003
23FL-004
23FL-005
23FL-006
23FL-007
23FL-008
23FL-009
23FL-010
23FL-011
23FL-012
23FL-013
23FL-014
23FL-015
23FL-016
23FL-017
23FL-018
23FL-020
23FL-021
23FL-022
23FL-023
Length_m
56
125
122
44
101
145
50
101
140
41
122
53
101
140
305
140
41
86
92
101
41
110
ASX Announcement
Released 14 August 2025
UTM_East
418403.3
418363.7
418434.4
418391.8
418430.2
418473.8
418337.6
418381.2
418424.7
418416.1
418476.5
418313.1
418356.6
418400.2
418440
418443.8
418350
418393.5
418396.4
418440
418399
418442.5
UTM_North
5591981
5592004.3
5591962.6
5592037.4
5592021.9
5591997.4
5591959.3
5591934.7
5591910.2
5592069.5
5592053.2
5591915.7
5591891.2
5591866.6
5591987.7
5591842.1
5591981.1
5591956.5
5592012.3
5591987.7
5592068.2
5592043.7
UTM_Elevation
359
360
359
363
361
360
358
359
361
362
362
359
361
362
356
361
357
354
355
356
361
364
7
Hole
23FL-024
23FL-025
23FL-026
23FL-029
Length_m
77
95
89
74
UTM_East
418347.1
418390.6
418434.4
418420.4
UTM_North
5591925.3
5591900.7
5591876
5592056.1
UTM_Elevation
358
358
362
361
Azimuth
300
300
300
300
Dip
-60
-60
-60
-60
23FL-030
50
418397
5592051.9
361
300
-60
23FL-031
53
418360
5592029
362
210
-60
23FL-032
68
418360
5592029
362
300
-60
23FL-033
86
418342
5592034
361
210
-60
23FL-034
83.2
420012.6
5591877
339.03
300
-60
23FL-035
50
419988.1
5591834
341.19
300
-60
23FL-036
152
420056.8
5591853
341.41
300
-60
23FL-037
197
420053.5
5591797
342.45
300
-60
23FL-038
185
419957
5591661
356
300
-55
23FL-039
176
419905
5591680
300
300
-60
23FL-040
176
419977
5591675
412
300
-55
23FL-041
194
419949
5591636
412
300
-55
23FL-042
185
419979
5591713
343
300
-55
23FL-043
185
419995
5591830
340
300
-60
23FL-044
155
42062.69
5591388
388
300
-55
23FL-045
122
420673
5591419
388
300
-55
23FL-046
101
420602
5591344
376
300
-55
23FL-047
116
420698
5591463
392
300
-55
23FL-048
101
420734
5591528
391
300
-55
23FL-049
101
420704
5591648
390
300
-55
23FL-050
98
420737
5591584
389
300
-55
23FL-051
77
420663
5591545
384
300
-55
23FL-052
101
420784
5591562
381
300
-55
23FL-053
101
420430
5591471
383
310
-50
23FL-054
110
420484
5591443
335
310
-50
23FL-055
149
420527
5591468
393
290
-60
23FL-056
152
420474
5591408
379
300
-50
23FL-057
287
420474
5591408
379
310
-80
23FL-058
50
420675
5591531
390
300
-55
23FL-059
89
420675
5591531
390
300
-75
23FL-060
98
420675
5591505
391
300
-55
23FL-061
86
420682
5591505
390
300
-55
23FL-062
92
420688
5591579
388
300
-55
23FL-063
80
420661
5591482
390
300
-55
23FL-064
74
420655
5591458
390
300
-55
23FL-065
95
420696
5591575
389
260
-55
23FL-066
89
420762
5591584
380
270
-55
23FL-067
23FL-068
62
110
420758
420758
5591589
5591589
380
388
70
70
-45
-60
ASX Announcement
Released 14 August 2025
8
Hole
Length_m
UTM_East
UTM_North
UTM_Elevation
Azimuth
Dip
23FL-069
80
420804
5591585
375
270
-45
23FL-070
101
420804
5591585
375
270
-65
23FL-071
110
420705
5591560
390
270
-55
23FL-072
107
420694
5591518
390
270
-60
23FL-073
80
420720
5591656
390
270
-55
23FL-074
101
420745
5591656
389
270
-55
23FL-075
107
420745
5591682
391
270
-55
23FL-076
119
420745
5591707
394
270
-55
23FL-077
92
420770
5591706
395
270
-55
23FL-078
101
420770
5591732
395
270
-55
23FL-079A
19
420795.5
5591757
395
270
-55
23FL-079B
122
420796.5
5591757
395
270
-55
23FL-080
122
420769.8
5591681
387
270
-55
23FL-081
122
420795
5591706
387
275
-55
23FL-082
131
420819
5591706
386
270
-55
23FL-083
107
420770.6
5591655
387
270
-55
23FL-084
140
420826
5591621
386
270
-45
23FL-085
140
420852
5591609
386
270
-45
24FL-086
24FL-087
24FL-088
24FL-089
24FL-090
24FL-091
24FL-092
24FL-093
24FL-094
24FL-095
24FL-096
24FL-097
24FL-098
24FL-099
24FL-100
24FL-101
24FL-102
24FL-103
24FL-104
24FL-105
24FL-106A
24FL-106B
24FL-107
24FL-108
24FL-109
140
152
200
215
173
221
92
101
128
131
176
119
101
161
164
164
122
140
113
161
14
80
194
302
263
420846
420795
420821
420847
420796
420869
421400
421387
421422
421406
421430
421436
421523
421558
421558
421558
421457
421430
421430
421430
418952
418952
421364
421364
421364
5591702
5591683
5591683
5591683
5591662
5591683
5591416
5591395
5591403
5591374
5591358
5591432
5591371
5591390
5591390
5591390
5591384
5591358
5591358
5591358
5591954
5591954
5591220
5591220
5591220
390
392
392
391
388
387
371
370
369
365
366
377
368
365
365
365
369
366
366
366
355
355
365
365
365
270
270
270
270
270
270
300
300
300
300
300
300
300
300
265
265
120
120
150
120
110
290.2
83
83
122
-55
-55
-55
-55
-55
-55
-55
-55
-55
-55
-55
-55
-55
-55
-55
-70
-45
-45
-45
-60
-55
-55
-45
-60
-45
ASX Announcement
Released 14 August 2025
9
Hole
Length_m
24FL-110
24FL-111
24FL-112
24FL-113
24FL-114
24FL-115
24FL-116
24FL-117
24FL-118
299
272
299
305
125
83
110
86
101
UTM_East
421364
421350
421350
421350
421350
421132
421151
421170
421132
UTM_North
5591220
5591186
5591186
5591186
5591186
5591186
5591352
5991401
5591342
UTM_Elevation
365
363
363
363
363
300
371
371
370
Table 2 – Falcon Lake Completed Holes to date, Drill Collar Details. UTM Grid: NAD83_Z16N
Azimuth
Dip
122
130
130
165
300
300
300
300
290
-60
-45
-60
-45
-55
-55
-55
-55
-55
Hole
From_m
To_m
Interval
Li2O_%
23FL-001
23FL-002
23FL-002
23FL-003
23FL-004
23FL-005
23FL-007
23FL-007
23FL-008
23FL-008
23FL-008
23FL-010
23FL-014
23FL-017
23FL-017
23FL-018
23FL-018
23FL-018
23FL-020
23FL-020
23FL-021
23FL-023
23FL-024
23FL-024
23FL-024
23FL-030
23FL-031
23FL-033
23FL-033
23FL-034
23FL-034
23FL-037
23FL-037
23FL-038
16.65
7.5
62
40.18
5.7
46.3
9.05
29
29.8
33.7
39.43
28.75
13.38
14.3
23.2
3.6
13.75
69.5
22.05
29
46.52
56.05
5.4
26.8
37.8
3.7
14.65
53.9
57.03
30.05
32.44
97.45
160.55
112.5
44.25
16.2
86
43.62
27.62
76.05
15.64
32.52
32.5
34.55
47.28
29.3
14.95
19
29.09
12.25
19.8
80.5
33.5
33
48.37
63.21
18.75
30.5
39.6
18.4
46.4
56.54
64.5
32.19
32.89
98.5
161.7
117.95
27.6
8.7
24
3.44
21.92
29.75
6.59
3.52
2.7
0.85
7.85
0.55
1.57
4.7
5.89
8.65
6.05
11
11.45
4
1.85
7.16
13.35
3.7
1.8
14.7
31.75
2.64
7.47
2.14
0.45
1.05
1.15
5.45
1.36
1.3
0.32
1.09
1.45
0.81
0.33
1.48
1
0.42
0.24
1.34
0.54
1
1.23
2.04
1.23
0.12
1.33
1.93
1.16
1.63
1.5
0.91
0.32
1.5
1.45
1.18
1.02
0.83
1.32
0.14
0.13
0.23
ASX Announcement
Released 14 August 2025
10
23FL-040
23FL-040
23FL-041
23FL-041
23FL-041
23FL-041
23FL-041
23FL-044
23FL-045
23FL-045
23FL-047
23FL-048
23FL-050
23FL-053
23FL-054
23FL-054
23FL-056
23FL-058
23FL-059
23FL-060
23FL-061
23FL-063
23FL-065
23FL-067
23FL-069
23FL-069
23FL-070
23FL-070
23FL-071
23FL-072
23FL-073
23FL-074
23FL-075
23FL-076
23FL-077
23FL-078
23FL-079B
23FL-080
23FL-080
23FL-081
23FL-082
23FL-082
24FL-086
24FL-087
24FL-087
24FL-087
24FL-087
24FL-088
24FL-088
ASX Announcement
Released 14 August 2025
134
141.2
105.25
112.85
118
121.75
133.8
2.75
17.25
24.7
77.7
38.99
2.5
2.85
17.6
73.2
98.45
11.1
19.55
23.85
11.95
10.65
26.6
28.5
29.2
32.7
38.2
46.2
46.8
48.8
3.8
35
26.7
1.75
37.8
17
85.8
50.95
57.8
66.6
91.55
100.85
119.95
39.5
53.9
88.7
120
82.15
99.8
139.95
143.75
107.4
116.15
120.25
122.95
143.6
4.6
19.45
27.15
83.2
41.92
5.41
4.05
18.6
73.9
100.15
27
47
31
30
17
37.75
47.6
31.65
38.3
43.4
47.55
64
69
9.1
39.5
39.6
20.7
56.25
20
87.5
55.6
60.5
87.25
99.45
104.5
121.3
46.85
82.15
112
121.6
95.9
116.6
5.95
2.55
2.15
3.3
2.25
1.2
9.8
1.85
2.2
2.45
5.5
2.93
2.91
1.2
1
0.7
1.7
15.9
27.45
7.15
18.05
6.35
11.15
19.1
2.45
5.6
5.2
1.35
17.2
20.2
5.3
4.5
12.9
18.95
18.45
3
1.7
4.65
2.7
20.65
7.9
3.65
1.35
7.35
28.25
23.3
1.6
13.75
16.8
0.69
0.29
0.72
0.21
1.95
1.02
0.14
1.21
0.83
0.61
0.73
1.16
1.03
0.48
0.42
0.27
1.24
0.95
0.83
1.06
1.02
1.06
1.05
1.34
1.6
1.27
1.75
0.38
0.92
0.58
0.48
0.03
1.36
1.65
1.4
0.32
0.13
1.43
1.58
1.48
1.4
1.02
0.20
1.38
1.30
1.13
0.68
1.15
0.99
11
24FL-089
24FL-091
24FL-092
24FL-094
24FL-095
24FL-098
24FL-100
24FL-102
24FL-103
24FL-104
24FL-105
24FL-107
24FL-107
24FL-108
24FL-108
24FL-109
24FL-109
24FL-109
24FL-109
24FL-109
24FL-109
24FL-110
24FL-111
24FL-111
24FL-111
24FL-111
24FL-111
24FL-112
24FL-113
24FL-114
24FL-115
24FL-116
24FL-118
148.1
155.1
28
59
82.2
18.95
55
57.5
64.55
71.1
88.7
42.05
100.85
59.7
222.2
44.58
87.65
178.05
201.85
211.15
225.75
115.7
30.6
41.3
154.8
112.95
132.6
57.5
39.3
62.2
64.3
61.05
79.75
159
158.1
30.9
64.85
86
43.85
73.4
83.1
99.25
93.2
129.5
49.95
154.95
71
278.15
52.4
91.65
184.5
205.3
218
227.95
137.3
37.2
46.85
160.7
116.05
149.05
77.2
61.85
105.2
65.9
62.6
81.15
10.9
3
2.9
5.85
3.8
24.9
18.4
25.6
34.7
22.1
40.8
1.01
1.74
0.74
1.47
0.82
1.71
1.19
0.25
1.57
0.81
1.46
1.72
1.56
0.12
0.95
0.11
1.62
1.74
1.62
1.33
1.26
1.51
0.97
1.19
1.25
0.13
0.12
1.34
1.88
0.93
0.53
0.80
0.49
7.9
54.1
11.3
55.95
7.82
4
6.45
3.45
6.85
2.2
21.6
6.6
5.55
5.9
3.1
16.45
19.7
22.55
43
1.6
1.55
1.4
Table 3 –Mineralised Intervals (>0.1% Li2O) and greater than 0.45m. Intervals are down hole length, true width
not known.
Appendix 2 – JORC CODE, 2012 EDITION – TABLE 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
Sampling
techniques
JORC Code explanation
• Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
ASX Announcement
Released 14 August 2025
Commentary
• All diamond drill core is NQ
(76mm) in this drilling
program.
• Diamond core sample
intervals are logged for
lithology, structural and
geotechnical information,
measured, photographed,
12
Criteria
Drilling
techniques
Drill sample
recovery
Logging
JORC Code explanation
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
• Aspects of the determination of
mineralisation that are Material to the Public
Report.
• In cases where ‘industry standard’ work has
been done this would be relatively simple
(eg ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation
may be required, such as where there is
coarse gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (eg submarine nodules)
may warrant disclosure of detailed
information.
• Drill type (eg core, reverse circulation, openhole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
• Method of recording and assessing core and
chip sample recoveries and results
assessed.
• Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
• Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
• Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
• Whether logging is qualitative or quantitative
in nature. Core (or costean, channel, etc)
photography.
• The total length and percentage of the
relevant intersections logged.
ASX Announcement
Released 14 August 2025
•
•
•
•
•
•
Commentary
and placed into numbered
trays prior to sampling.
Core has been sampled on
nominal ~1m intervals (0.80
– 1.20m) where possible
unless geological boundaries
dictate otherwise.
Geological boundaries have
not been crossed by sample
intervals.
½ core samples have been
split by core saw, collected,
and submitted for analysis to
AGAT Laboratories along
with regular duplicates,
standards and blanks in line
with QAQC procedures.
The same side of the core is
always sampled in-line with
procedure.
All holes are NQ diamond
drill holes.
A Gyro based system has
been used for both rig
alignment and downhole
measurements on all holes.
• All core is depth marked and
oriented to check against
drillers measurements
(blocks), ensuring that all
core loss is considered.
Diamond core recovery is
recorded into the database.
• No significant core loss has
been observed to date.
• All drill cores have been
geologically logged.
• Geological logging is
completed for all holes, and it
is representative.
• The lithology, alteration,
geotechnical and structural
characteristics of drill
samples are logged following
standard procedures and
using standardised
geological codes.
• Logging is both qualitative
and quantitative depending
on field being logged.
• All drill-holes are logged in
full.
• All drill core are digitally
photographed and stored.
13
Criteria
Subsampling
techniques
and sample
preparation
•
•
•
•
•
•
Quality of
assay data
and
laboratory
tests
Verification
of sampling
and
assaying
Location of
data points
Data spacing
and
distribution
JORC Code explanation
If core, whether cut or sawn and whether
quarter, half or all core taken.
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the sampling
is representative of the in situ material
collected, including for instance results for
field duplicate/second-half sampling.
Whether sample sizes are appropriate to the
grain size of the material being sampled.
•
•
•
•
• The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied
and their derivation, etc.
• Nature of quality control procedures adopted
(eg standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (ie lack of bias) and
precision have been established.
•
• The verification of significant intersections by
either independent or alternative company
personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
• Discuss any adjustment to assay data.
•
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic
control.
• Data spacing for reporting of Exploration
Results.
• Whether the data spacing and distribution is
sufficient to establish the degree of
•
ASX Announcement
Released 14 August 2025
•
•
•
•
•
•
•
•
Commentary
All core has been cut and
sampled at the core
processing facility in
Armstrong, Ontario.
NQ core was split by saw in
half, always using the same
half for sampling purposes.
Duplicate sampling is carried
out routinely throughout the
drilling campaign in line with
QAQC procedure. The
laboratory will carry out
routine internal repeat
assays on crushed samples.
Considering the grain size,
half core NQ samples are
believed to be a
representative of the sample.
Samples have been
submitted to AGAT
laboratories.
AGAT is an internationally
certified independent
service provider. Industry
Share your feedback
Discover