Small-Scale Drilling Program completed at Tidili Project
Released
Released
Announcement PDF
ASX Announcement
Released 28 March 2024
Small-Scale Drilling Program completed at
Tidili Project, Morocco
Battery Age Minerals Ltd (ASX: BM8; “Battery Age” or “the Company”) advises that it has
completed a limited drilling program at the Tidili Copper Project in Morocco, as foreshadowed
in the Company’s December 2023 Quarterly Report.
Six drill holes have been completed, which were designed to test the sub-surface geometry,
grade and scale of mineralisation at two of the three known locations where historic shallow
workings were mapped and copper oxide mineralisation was noted at the Tidili Project (Figure
1).
The drilling targeted the down-dip extension of copper oxide mineralisation associated with
fault breccias. Copper sulphide minerals (chalcopyrite and bornites) were intercepted in the
target intervals in 3 of the 6 holes completed. Visual estimates of copper sulphide minerals can
be found in Appendix 1, Table 2.
Location 2
Location 1
Figure 1 – Geological map and collar positions of the six holes completed at location 1 and 2.
Battery Age Minerals Ltd
ASX: BM8
ACN 085 905 997
batteryageminerals.au
T: +61 (8) 6109 6689
E: info@batteryage.au
Level 50, 108 St Georges Terrace
Perth, WA 6000
PO Box 7310, Cloisters Square Po, WA 6850
1
The Company is of the view that the drilling program has proven the Company’s geological
concept for the Tidili Project, however the visual estimates of the mineralised zones logged
are at the lower end of the spectrum and the intercepts are narrow.
In light of this, the Company has concluded the drilling program early as the Tidili Project is
deemed to have low prospectivity for an economic deposit and has been downgraded
accordingly as a non-core asset within Battery Age’s portfolio.
The Board has determined to focus on its primary assets – the Falcon Lake Lithium Project in
Ontario, Canada and the Bleiberg Zinc-Lead-Germanium Project in Austria – and does not
plan on conducting further drilling activities at Tidili in the near term.
Release authorised by the Board of Battery Age Minerals Ltd.
Contacts
Investors / Shareholders
Nigel Broomham
Chief Executive Officer
P: +61 (0)8 6109 6689
E: info@batteryage.au
Media
Nicholas Read – Read Corporate
P: +61 (0)8 9388-1474 / (0419) 929 046
E: nicholas@readcorporate.com.au
Competent Person Statement
The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the ‘JORC
Code’) sets out minimum standards, recommendations and guidelines for Public Reporting in Australasia of
Exploration Results, Mineral Resources and Ore Reserves.
The information in this release that relates to Exploration Results is based on information prepared by Dr Simon
Dorling. Dr Dorling is a member of the Australasian Institute of Geoscientists (Member Number: 3101). Dr Dorling
has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration
and to the activity which they are undertaking to qualify as a Competent Person as defined in the 2012 Edition of
the JORC Code (Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves).
Dr Dorling consents to the inclusion in the release of the matters based on their information in the form and context
in which it appears.
Forward-Looking Statement
This announcement may contain certain forward-looking statements and projections. Such forward looking
statements/projections are estimates for discussion purposes only and should not be relied upon. Forward looking
statements/projections are inherently uncertain and may therefore differ materially from results ultimately achieved.
Battery Age Minerals Limited does not make any representations and provides no warranties concerning the
accuracy of the projections and disclaims any obligation to update or revise any forward-looking statements/projects
based on new information, future events or otherwise except to the extent required by applicable laws. While the
information contained in this report has been prepared in good faith, neither Battery Age Minerals Limited or any of
its directors, officers, agents, employees or advisors give any representation or warranty, express or implied, as to
the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this
announcement.
Cautionary Statement – Visual Estimates
This announcement contains references to visual results and visual estimates of mineralisation. The Company
draws attention to uncertainty in reporting visual results. Visual estimates of mineral abundance should never be
considered a proxy or substitute for laboratory analyses where concentrations or grades are the factor of principal
economic interest. Visual estimates also potentially provide no information regarding impurities or deleterious
physical properties relevant to valuations.
ASX Announcement
Released 28 March 2024
2
Appendix 1
Hold_ID
East_UTM
North_UTM
RL
Depth (m) Dip
Azimuth
TD_PDH_001
629278.04
3441625.66
2085.88
50
-60
330
TD_PDH_002
629296.83
3441597.49
2082.62
100
-60
330
TD_PDH_003
629334.15
3441632.43
2065.04
100
-60
330
TD_PDH_004
630467.68
3443358.57
2025.32
50
-65
140
TD_PDH_005
630467.57
3443358.71
2025.05
86
-85
140
TD_PDH_008
630504.79
3443399.45
2036.84
100
-70
140
Table 1 - Drill Collar Details
Hold_ID
From_m
To_m
Interval_m
Copper Minerals %
TD_PDH_001
33
42
9
0.1-0.5%
TD_PDH_003
60
63.9
3.9
0.1-0.3%
TD_PDH_005
39.85
41
1.15
0.1-0.3%
Table 2 – Mineralised Intervals. Intervals are down hole length, true width not known. Copper Minerals % are
based on visual estimates.1
This announcement contains references to visual results and visual estimates of
mineralisation. The Company draws attention to uncertainty in reporting visual results. Visual
estimates of mineral abundance should never be considered a proxy or substitute for
laboratory analyses where concentrations or grades are the factor of principal economic
interest. Visual estimates also potentially provide no information regarding impurities or
deleterious physical properties relevant to valuations.
Appendix 2 – JORC CODE, 2012 EDITION – TABLE 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
Sampling
techniques
JORC Code explana�on
• Nature and quality of sampling
(eg cut channels, random chips,
or specific specialised industry
standard measurement tools
appropriate to the minerals
under investigation, such as
down hole gamma sondes, or
handheld XRF instruments, etc).
These examples should not be
ASX Announcement
Released 28 March 2024
Commentary
• Competent Persons will be assessing
drilling results to determine sample
intervals.
3
Criteria
JORC Code explana�on
taken as limiting the broad
meaning of sampling.
• Include reference to measures
taken to ensure sample
representivity and the
appropriate calibration of any
measurement tools or systems
used.
• Aspects of the determination of
mineralisation that are Material
to the Public Report.
• In cases where ‘industry
standard’ work has been done
this would be relatively simple
(eg ‘reverse circulation drilling
was used to obtain 1 m samples
from which 3 kg was pulverised
to produce a 30 g charge for fire
assay’). In other cases more
explanation may be required,
such as where there is coarse
gold that has inherent sampling
problems. Unusual commodities
or mineralisation types (eg
submarine nodules) may
warrant disclosure of detailed
information.
Drilling
• Drill type (eg core, reverse
techniques
circulation, open-hole hammer,
rotary air blast, auger, Bangka,
sonic, etc) and details (eg core
diameter, triple or standard
tube, depth of diamond tails,
face-sampling bit or other type,
whether core is oriented and if
so, by what method, etc).
Drill sample
• Method of recording and
recovery
assessing core and chip sample
recoveries and results assessed.
• Measures taken to maximise
sample recovery and ensure
representative nature of the
samples.
ASX Announcement
Released 28 March 2024
Commentary
•
•
All holes are NQ diamond drill holes.
A Gyro based system has been used
for both rig alignment and downhole
measurements on all holes.
•
All core is depth marked and
oriented to check against drillers
measurements (blocks), ensuring
that all core loss is considered.
Diamond core recovery is recorded
into the database.
4
Criteria
Logging
JORC Code explana�on
• Whether a relationship exists
between sample recovery and
grade and whether sample bias
may have occurred due to
preferential loss/gain of
fine/coarse material.
• Whether core and chip samples
have been geologically and
geotechnically logged to a level
of detail to support appropriate
Mineral Resource estimation,
mining studies and metallurgical
studies.
• Whether logging is qualitative or
quantitative in nature. Core (or
costean, channel, etc)
photography.
• The total length and percentage
of the relevant intersections
logged.
Commentary
•
Each hole loca�on was recorded by
GPS in UTM Zone 29N
•
All drill cores have been geologically
logged.
Geological logging is completed for
all holes, and it is representa�ve.
The lithology, altera�on,
geotechnical and structural
characteris�cs of drill samples are
logged following standard
procedures and using standardised
geological codes.
Logging is both qualita�ve and
quan�ta�ve depending on field
being logged.
All drill-holes are logged in full.
All drill core are digitally
photographed and stored.
No sampling has been undertaken
Competent Persons will be assessing
drilling results to determine sample
intervals.
•
•
•
•
•
Subsampling
techniques
and sample
preparation
•
•
•
•
•
ASX Announcement
Released 28 March 2024
If core, whether cut or sawn and
whether quarter, half or all core
taken.
If non-core, whether riffled, tube
sampled, rotary split, etc and
whether sampled wet or dry.
For all sample types, the nature,
quality and appropriateness of
the sample preparation
technique.
Quality control procedures
adopted for all sub-sampling
stages to maximise
representivity of samples.
Measures taken to ensure that
the sampling is representative of
the in situ material collected,
including for instance results for
•
•
5
Criteria
Quality of
assay data
and
laboratory
tests
Verification
of sampling
and
assaying
Location of
data points
JORC Code explana�on
field duplicate/second-half
sampling.
• Whether sample sizes are
appropriate to the grain size of
the material being sampled.
• The nature, quality and
appropriateness of the assaying
and laboratory procedures used
and whether the technique is
considered partial or total.
• For geophysical tools,
spectrometers, handheld XRF
instruments, etc, the parameters
used in determining the analysis
including instrument make and
model, reading times,
calibrations factors applied and
their derivation, etc.
• Nature of quality control
procedures adopted (eg
standards, blanks, duplicates,
external laboratory checks) and
whether acceptable levels of
accuracy (ie lack of bias) and
precision have been established.
• The verification of significant
intersections by either
independent or alternative
company personnel.
• The use of twinned holes.
• Documentation of primary data,
data entry procedures, data
verification, data storage
(physical and electronic)
protocols.
• Discuss any adjustment to assay
data.
• Accuracy and quality of surveys
used to locate drill holes (collar
and down-hole surveys),
trenches, mine workings and
other locations used in Mineral
Resource estimation.
ASX Announcement
Released 28 March 2024
Commentary
•
•
•
•
•
•
No sampling has been
undertaken
Competent Persons will be
assessing drilling results to
determine sample intervals.
No sampling has been
undertaken
Competent Persons will be
assessing drilling results to
determine sample intervals.
All drilling loca�ons have been
located by handheld GPS.
All waypoint loca�ons were
recorded in WGS84, UTM Zone
20N grid reference system.
6
Criteria
Data
spacing
and
distribution
Orientation
of data in
relation to
geological
structure
Sample
security
JORC Code explana�on
• Specification of the grid system
used.
• Quality and adequacy of
topographic control.
• Data spacing for reporting of
Exploration Results.
• Whether the data spacing and
distribution is sufficient to
establish the degree of
geological and grade continuity
appropriate for the Mineral
Resource and Ore Reserve
estimation procedure(s) and
classifications applied.
• Whether sample compositing
has been applied.
• Whether the orientation of
sampling achieves unbiased
sampling of possible structures
and the extent to which this is
known, considering the deposit
type.
• If the relationship between the
drilling orientation and the
orientation of key mineralised
structures is considered to have
introduced a sampling bias, this
should be assessed and reported
if material.
• The measures taken to ensure
sample security.
Commentary
•
This is a preliminary drilling
campaign and therefore the
selected distribu�on of collar
posi�ons are of a suitable
spacing and distribu�on as
designed to test the scale of
mineralisa�on at the Tidili target
areas.
•
Drilling has been carried out in
order to sample across the strike
of the mineralisa�on, based on
surface mapping. However, as
this drilling is preliminary,
further drilling is required to
determine the orienta�on of
mineralisa�on in this area.
•
No sampling has been
undertaken
Competent Persons will be
assessing drilling results to
determine sample intervals.
No external audit has been
undertaken at this stage.
•
Audits or
reviews
•
The results of any audits or
reviews of sampling techniques
and data.
•
Section 2 Reporting of Exploration Results
ASX Announcement
Released 28 March 2024
7
(Criteria listed in the preceding section also apply to this section.)
Criteria
Mineral
tenement and
land tenure
status
Exploration
done by other
parties
JORC Code explana�on
• Type, reference name/number,
location and ownership
including agreements or
material issues with third
parties such as joint ventures,
partnerships, overriding
royalties, native title interests,
historical sites, wilderness or
national park and
environmental settings.
• The security of the tenure held
at the time of reporting along
with any known impediments
to obtaining a licence to
operate in the area.
• Acknowledgment and
appraisal of exploration by
other parties.
Geology
ASX Announcement
Released 28 March 2024
•
Deposit type, geological
setting and style of
mineralisation.
Commentary
• All claims rela�ng to the Tidili
Project minerals claims are in
good standing the company
holds an 85% interest
• Please refer to the Company’s
Prospectus (dated 7 December
2022) Annexure A Sec�on 5.4
Table 5:1 for full table of Tidili
mineral claims.
• No known impediments.
•
•
The project area is covered by
regional map sheet 1:50,000
Douar Cor. The only previous
explora�on ac�vity was carried
out by the previous permit
holder and included stream
sediment and rock chip
sampling. These results have
been published in the company
prospectus.
The project area is located over
the southern contact zone of
the Central High-Atlas mountain
domain which separates it from
the Precambrian shield of the
An�-Atlas to the southeast (see
above). Adjacent to the project
area, the High-Atlas domain is
composed of a gneissic
basement overlain by metasedimentary rock of metapelites, arkoses, andesi�c tuffs
and epiclas�c rocks. The
permits overly predominantly
Precambrian and Cambrian
meta-sedimentary and intrusive
rocks of the Central High-Atlas
8
Criteria
JORC Code explana�on
Drill hole
Information
•
•
ASX Announcement
Released 28 March 2024
A summary of all information
material to the understanding
of the exploration results
including a tabulation of the
following information for all
Material drill holes:
o easting and northing
of the drill hole collar
o elevation or RL
(Reduced Level –
elevation above sea
level in metres) of the
drill hole collar
o dip and azimuth of the
hole
o down hole length and
interception depth
o hole length.
If the exclusion of this
information is justified on the
basis that the information is
Commentary
to the north northwest of the
major contact zone with the
Mesozoic sedimentary strata
preserved over a basement
graben structure. These rocks
cover about 90% of the project
area and are intruded by
younger grani�c and
granodiori�c magmas.
• The Atlas Mountains evolved
from the inversion of a ri�
during the collision of the
African and European
con�nents. The central por�on
of the project area is transected
by a major britle-duc�le
structure which is interpreted
to be a branch of the southAtlas margin Tizi’n Test Shear
Zone.
• The project area is targeted
from structurally controlled
base metal mineraliza�on.
• All drill hole collar loca�ons and
mineralised intercepts have been
reported in this report for all holes
completed to date.
• No relevant data has been excluded
from this report.
9
Criteria
JORC Code explana�on
not Material and this exclusion
does not detract from the
understanding of the report,
the Competent Person should
clearly explain why this is the
case.
Data
• In reporting Exploration
aggregation
Results, weighting averaging
methods
techniques, maximum and/or
minimum grade truncations
(eg cutting of high grades) and
cut-off grades are usually
Material and should be stated.
• Where aggregate intercepts
incorporate short lengths of
high grade results and longer
lengths of low grade results,
the procedure used for such
aggregation should be stated
and some typical examples of
such aggregations should be
shown in detail.
• The assumptions used for any
reporting of metal equivalent
values should be clearly
stated.
Relationship
• These relationships are
between
particularly important in the
mineralisation
reporting of Exploration
widths and
Results.
intercept
• If the geometry of the
lengths
mineralisation with respect to
the drill hole angle is known,
its nature should be reported.
• If it is not known and only the
down hole lengths are
reported, there should be a
clear statement to this effect
(eg ‘down hole length, true
width not known’).
Diagrams
• Appropriate maps and sections
(with scales) and tabulations
of intercepts should be
included for any significant
ASX Announcement
Released 28 March 2024
Commentary
•
•
•
•
•
All visual mineralised intervals
reported.
All drill hole collar details
included in Appendix 1
No low/high cuts
Only downhole lengths are
reported.
The exact geometry of the
mineralisa�on is not known as such
true width is not known.
•
•
Appropriate plan views
included.
Site loca�on plans are provided
in company prospectus.
10
Criteria
Balanced
reporting
Other
substantive
exploration
data
Further work
JORC Code explana�on
Commentary
discovery being reported These
should include, but not be
limited to a plan view of drill
hole collar locations and
appropriate sectional views.
• Where comprehensive
• All available results and relevant
reporting of all Exploration
technical field informa�on is
Results is not practicable,
provided.
representative reporting of
both low and high grades
and/or widths should be
practiced to avoid misleading
reporting of Exploration
Results.
• Other exploration data, if
• All previous explora�on data
meaningful and material,
completed to date have been
should be reported including
reported
(but not limited to): geological
observations; geophysical
survey results; geochemical
survey results; bulk samples –
size and method of treatment;
metallurgical test results; bulk
density, groundwater,
geotechnical and rock
characteristics; potential
deleterious or contaminating
substances.
• The nature and scale of
• Competent Persons will be
planned further work (eg tests
assessing drilling results to
for lateral extensions or depth
determine sample intervals.
extensions or large-scale step• The company has no further
out drilling).
explora�on programs planned
at this �me at Tidili.
• Diagrams clearly highlighting
the areas of possible
extensions, including the main
geological interpretations and
future drilling areas, provided
this information is not
commercially sensitive.
ASX Announcement
Released 28 March 2024
11
Share your feedback
Discover