Battery Age Unlocks Critical Metals
Potential in Historic Bleiberg District
HIGHLIGHTS
• Maiden drilling has confirmed a mineralised zinc-lead-germanium system at the Rubland
and Tschöklnock targets, validating Battery Age’s exploration model in one of Europe’s
most prolific mining districts.
• Higher-grade mineralisation intersected at Rubland, including 2.5m @ 3.96% Zn+Pb,
reinforcing the potential for structurally controlled, higher-grade zones within a broader
mineralised system.
• The exploration program comprised of a 6-hole, 1,685m diamond drill program tested two
greenfield targets (Rubland and Tschöklnock) within the historic Bleiberg mining corridor -
one of the most significant zinc-lead–germanium districts globally.
• Future exploration programs to be more focussed on extension of historically productive
areas within the Bleiberg complex. Additional drilling permit applications well underway,
incorporating Rubland extensions and zones west of the Antoni Shaft.
• Company is also seeking to drill its high priority Windisch Alp target in subsequent
exploration program, which is the most proximal westerly target to the historic operating
Bleiberg mine. The Company has received its drill approval for this target, but was unable
to access it during the Phase 1 drilling campaign.
• CEO site-visit planned for April 2026 to engage with local stakeholders in order to position
Bleiberg as part of the European Union’s Critical Raw Materials Act framework.
• Bleiberg is a historically significant European mining district with approximately 700 years
of production, reported historic average mined grades of ~5% Zn, ~1% Pb and ~200 ppm
Ge, and reported historic germanium concentrate grades up to 1,500g/t germanium,
ranking it among the world’s most significant Zn/Pb/Ge-producing districts at the time of
closure.
Battery Age Minerals Ltd (ASX: BM8; “Battery Age” or “the Company”) is pleased to report
an exploration update from drilling activities during the 2025 field season at the Bleiberg Zinc–
Lead-Germanium Project in Austria.
ASX Announcement
Released 24 March 2026 2
BLEIBERG ZINC–GERMANIUM PROJECT (AUSTRIA)
2025 Diamond Drilling Program
Battery Age Minerals designed and executed a surface diamond drilling program targeting
areas surrounding the historic Bleiberg–Kreuth zinc-lead–germanium mining district, which
was mined for over 700 years and is recognised for carbonate-hosted, replacement-style
sulphide mineralisation with documented germanium enrichment.
The program comprised six (6) diamond drill holes for a total of 1,685 metres. Drilling was
undertaken by GEOPS Bohrgesellschaft GmbH and utilised existing forestry access designed
for minimum environmental impact.
Figure 1: Bleiberg maiden drilling program – planned drilling locations.
ASX Announcement
Released 24 March 2026 3
Figure 2: Bleiberg maiden drilling program – drill hole locations.
Target Areas Tested – Tschöklnock
The Tschöklnock target was historically exploited for its zinc-dominant mineralisation
associated with the Rauhwacke facies of the 3rd Cardita carbonate horizon within the Raibl
Formation (Figure 2). Three diamond drill holes tested the lower limb of a syncline over
approximately 2 km of strike (Figure 3). Drilling intersected folded and fault-bounded carbonate
stratigraphy consistent with the Company’s geological model.
A zinc anomaly was intersected at the Tschöklnock drilling in hole 25BBDH_001, which
penetrated a major structure (Schliewa Fault). The observed anomalism is associated with
moderately to strongly oxidised gossanous and brecciated carbonate rocks as a result of
faulting. At a 0.20% Zn cut off, the anomaly extends over 40m.
The anomalism in 2025BBDH_001 is open at depth. An interval of 6 consecutive meters (292-
298m), near the end of the drill hole were selected for germanium analysis by fusion method
at ALS laboratory, Ireland. Despite the relative low levels of zinc and the high mobility of
germanium in oxidised rocks up to 9 ppm Ge were consistently recorded.
Under Austrian mining regulations, the 2025 work permits only permitted drilling holes to a
depth of <300m. The result is seen as a significant Zn-dominated, geochemical anomaly
associated with deformation and mineralisation along the northwest-striking Schliewa Fault.
The northwest striking fault breccia can be traced for several 100’s of meters on the surface.
It is interpreted that it warrants further investigation. At this stage the mineralisation has to be
considered open at depth and along strike.
ASX Announcement
Released 24 March 2026 4
Figure 3: Cross section of the Tschöklnock geology and drill target setting including laboratory results from the
first drill hole.
Target Areas Tested – Rubland
The Rubland target forms part of the historic Bleiberg–Kreuth mining district and was subject
to underground exploration and development during the historical operation at the historical
Bleiberg mine. Mineralisation at Rubland is associated with the Plattenkalk facies of the 3rd
Cardita carbonate horizon, developed immediately below the Hauptdolomite and locally
influenced by brecciation and structural deformation.
Historical mine records show that Rubland was accessed via underground development during
the late 20th century, and connected to the broader Bleiberg underground network. These
historic activities identified zinc–lead mineralisation that were undertaken prior to the
application of modern geological models and exploration techniques.
The 2025 diamond drilling program targeted the southern limb of a regional synclinal structure
beneath and adjacent to areas of historic underground development (Figure 5). Three closely
spaced drill holes were collared to test the geometry, continuity and controls on mineralisation
interpreted from historical data and modern reinterpretation.
Core logging identified intervals containing sulphide minerals, locally associated with
carbonate breccias, fault zones and brittle–ductile deformation (Figure 4).
ASX Announcement
Released 24 March 2026 5
The best intercepts include:
o 2025BBDH_004: 11.00m @ 0.58 % Zn+Pb from 124.00m
o 2025BBDH_005: 6.50m @ 1.77% Zn+Pb from 140.00m
incl. 2.50m @ 3.96% Zn+Pb from 141.00m
The elevated zinc-lead samples indicate a positive correlation with germanium albeit at a level
just above detection (6 ppm).
The technical team interprets these results and the geological setting in which they occur as
being related to stratabound mineralisation and remobilised and overprinted during Alpine
deformation (Figure 5). The historic adit which was developed from the north to the south
reported unquantified zinc-lead mineralisation at the same stratigraphic position for both fold
limbs. Based on this historic information, the base of the Plattenkalk member and the fault
zone are treated as future exploration targets. BM8 is planning to include the north and south
limbs into its new drilling application for 2026.
Figure 4: Shows fault and matric-controlled sphalerite and galena in 25BBDH_005 (141-143.5m) at the Rubland
target.
ASX Announcement
Released 24 March 2026 6
Figure 5: N-S cross section illustrating the geology and structure of the Rubland adit and BM8’s target.
A summary of significant and anomalous assay results in Table 1 (intercept reported at a
0.20% Zn+Pb cut off grade with maximum 2 m of internal dilution)
Hole_ID
From
(m)
To
(m)
Pb
(ppm)
Zn
(ppm)
Zn+Pb
(ppm)
Thickness
(m)
Zn+Pb
(%)
25BBDH_001 259.00 299.80 1,002.82 2,383.48 3,386.30 40.80 0.34
25BBDH_004 111.50 112.50 11.60 12,950.00 12,961.60 1.00 1.30
25BBDH_004 124.00 135.00 211.76 5,548.00 5,759.76 11.00 0.58
25BBDH_005 133.00 137.50 10.30 3,480.00 3,490.30 4.50 0.35
25BBDH_005 140.00 146.50 11,050.77 6,595.69 17,646.46 6.50 1.77
Incl. 141.00 143.50 26,948.00 12,614.00 39,562.00 2.50 3.96
25BBDH_006 154.30 155.30 3,410.00 7,810.00 11,220.00 1.00 1.12
Battery Age CEO, Sebastian Kneer, commented:
“The results from our 2025 maiden drilling program at Bleiberg mark a major operational
milestone for Battery Age. We have successfully tested new targets and confirmed the
presence of mineralisation together with our targeting concepts in one of Europe’s most
historically significant zinc-germanium districts.
ASX Announcement
Released 24 March 2026 7
Despite a scarcity of detailed historical information and limitations in accessibility to targets
during phase-1 drilling, these early results reinforce our belief that Bleiberg is a truly unique
project with the potential to play a critical role in strengthening the European Union’s critical
mineral security and Western supply chains.
We are currently finalising the next drill permit application which will target extensions at
Rubland and additional high-priority zones west of the Antoni Shaft. We will also seek to drill-
test the high-priority Windisch Alp target, located north-west of the Bleiberg mine which ceased
operating in 1993. I look forward to visiting site in April to engage directly with local
stakeholders and authorities, ensuring we progress this asset in a methodical and high-impact
manner.”
NEXT STEPS
• Preparation of the next 2026 Bleiberg drilling permit application is well underway,
incorporating Rubland extensions and additional historically referenced zones west of the
Antoni Shaft, including Josefischolle, Riedhartscholle and Kalkscholle.
• Engaging with local mining authorities regarding re-entering of historic adits for
underground surveys and sampling.
• CEO site-visit planned for April 2026 to engage with local and EU-based stakeholders
References
1. Refer to Bleiberg earn-in terms and structure set out in the Company’s announcement dated 16 May 2024 and
Prospectus dated 7 December 2022.
2. Zeeh, S. and Bechstadt,T. (1994). Carbonate-Hosted Pb-Zn Mineralisation at Bleiberg-Kreuth (Austria):
Compilation of Data and New Aspects. In: Fontbote,L. and Boni,M. editors, Sediment Hosted Pb-Zn Ores,
Special Publication No. 10 of the Society for Geology Applied to Mineral Deposits. pp. 271-2962.
Cerny, I. (1991). Lagerstättenforschung in Kärnten Neuergebnisse und Aspekte für die Zukunft. Carinthia ll
181./101. Jahrgang S. 119-129 Klagenfurt 1991.
Cerny, I. and Schroll, E. (1995). Spezialmetallgehalte in ZnS-Konzentraten der Lagerstätte Bleiberg Kreuth.
Arch. f. Lagerstforsch. Geol. B.-A. ISSN 0253-097X Band 18 S. 5–33 Wien, Juni 1995.
Schroll, E. (2006). Neues zur Genese der Blei-Zink Lagerstätte Bleiberg. Carinthia II 196./116. Jahrgang
Seiten 483-500 Klagenfurt 2006.
Multi-Met (2023) Bleiberg Project – Multi-Met, Multi. Available at: https://multimetdev.com/projects/bleiberg-
project/.
Schor, D. (2021) TSMC details 5 nm, WikiChip Fuse. Available at: https://fuse.wikichip.org/news/3398/tsmc-
details-5-nm/ (Accessed: 25 February 2024).
Leach. D, Taylor. R, Fey. D et al.(2010), , A deposit model for Mississippi Valley-Type lead-zinc ores, USGS
Scientific Investigations Report 2010-5070-A.
Mining Insights Pty Ltd, Independent Geologists Report, 1 December 2022.
3. Announcement Battery Age secures highly prospective corridor- Expands Bleiberg Project; 29 January 2025
4. Announcement Battery Age Minerals Triples Austrian Footprint along historic High-Grade Germanium mining
corridor; 18 December 2024 & 23 December 2024.
[ENDS]
Release authorised by the Board of Battery Age Minerals Ltd.
ASX Announcement
Released 24 March 2026 8
Contacts
Investors / Shareholders
Sebastian Kneer
Chief Executive Officer
P: +61 (0)8 6109 6689
E: info@batteryage.au
Competent Person Statement
The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the ‘JORC
Code’) sets out minimum standards, recommendations and guidelines for Public Reporting in Australasia of
Exploration Results, Mineral Resources and Ore Reserves.
The information in this release that relates to Exploration Results is based on information prepared by Dr Simon
Dorling. Dr Dorling is a member of the Australasian Institute of Geoscientists (Member Number: 3101) and a
consultant of Battery Age. Dr Dorling has sufficient experience which is relevant to the style of mineralisation and
type of deposit under consideration and to the activity which they are undertaking to qualify as a Competent Person
as defined in the 2012 Edition of the JORC Code (Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves). Dr Dorling consents to the inclusion in the release of the matters based on their
information in the form and context in which it appears.
Compliance Statement
This report contains information on the Bleiberg and Hochobir Projects extracted from an ASX market
announcement dated 8 December 2022, 2 February 2023, 13 July 2023, 21 August 2023, 26 February 2024, 26
March 2024, 23 April 2024, 16 May 2024, 29 August 2024, 18 December 2024, 22 January 2025, 29 January 2025
and 17 April 2025 released by the Company and reported in accordance with the 2012 edition of the “Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). The original
market announcement is available to view on www.batteryage.au and www.asx.com.au. Battery Age is not aware
of any new information or data that materially affects the information included in the original market announcement.
Forward-Looking Statement
This announcement may contain certain forward-looking statements and projections. Such forward looking
statements/projections are estimates for discussion purposes only and should not be relied upon. Forward looking
statements/projections are inherently uncertain and may therefore differ materially from results ultimately achieved.
Battery Age Minerals Limited does not make any representations and provides no warranties concerning the
accuracy of the projections and disclaims any obligation to update or revise any forward-looking statements/projects
based on new information, future events or otherwise except to the extent required by applicable laws. While the
information contained in this report has been prepared in good faith, neither Battery Age Minerals Limited or any of
its directors, officers, agents, employees or advisors give any representation or warranty, express or implied, as to
the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this
announcement.
ASX Announcement
Released 24 March 2026 9
Figure 6: Bleiberg Project – Illustrating exploration tenure, historic mining corridor and shafts. Insert table
demonstrates historical ore feed data for the Bleiberg Mine (Green)1,2
. 100% staked claims identified in blue &
orange (Bleiberg West concessions) and existing earn-in claims shown in red (Bleiberg concessions).
Appendix 1 – Drill Collar Positions
Table 2: Austria Bleiberg 2025 Drill Collar Positions
Appendix 2 – JORC CODE, 2012 EDITION – TABLE 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
• All diamond drill core is PQ
and NQ in this drilling
program.
• Diamond core sample
intervals are logged for
lithology, structural and
geotechnical information,
measured, photographed,
and placed into numbered
trays prior to sampling.
Hole Lenght_m Easting Northing Elevation Azimuth Dip
25BBDH_001 299.8 15334 167500 1,622 0 -55.00
25BBDH_002 299.6 14762 167734 1,700 0 -55.50
25BBDH_003 299.9 16655 167896 1,395 315 -55.00
25BBDH_004 269.1 23544 168325 1,058 15 -63.50
25BBDH_005 261 23544 168323 1,058 10 -77.00
25BBDH_006 255 23546 168323 1,058 45 -63.00
*31255-EMG/Austria GK Central
ASX Announcement
Released 24 March 2026 10
Criteria JORC Code explanation Commentary
appropriate calibration of any measurement
tools or systems used.
• Aspects of the determination of
mineralisation that are Material to the Public
Report.
• In cases where ‘industry standard’ work has
been done this would be relatively simple
(eg ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation
may be required, such as where there is
coarse gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (eg submarine nodules)
may warrant disclosure of detailed
information.
• Core has been sampled on
nominal ~1m intervals (0.80
– 1.20m) where possible
unless geological boundaries
dictate otherwise.
• Geological boundaries have
not been crossed by sample
intervals.
• ½ core samples have been
split by core saw, collected,
and submitted for analysis to
ALS Laboratories along with
regular duplicates, standards
and blanks in line with QAQC
procedures.
• The same side of the core is
always sampled in-line with
procedure.
Drilling
techniques
• Drill type (eg core, reverse circulation, open-
hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
• All holes at the Bleiberg
project are drilled as a
combination of PQ and NQ
diamond drill holes.
• A sighting compass has been
used for rig alignment.
downhole measurements on
all holes were carried out
using Reflex survey tool.
Drill sample
recovery
• Method of recording and assessing core and
chip sample recoveries and results
assessed.
• Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
• Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
• All core is depth marked and
oriented to check against
drillers measurements
(blocks), ensuring that all
core loss is considered.
Diamond core recovery is
recorded into the database.
• No significant core loss has
been observed to date.
• In broken ground shorter
core runs are drilled to
improve recovery
• A relationship between core
recovery and grade has not
been identified, bias has not
been introduced due to
preferential loss/gain of
fine/coarse material.
Logging • Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
• Whether logging is qualitative or quantitative
in nature. Core (or costean, channel, etc)
photography.
• The total length and percentage of the
relevant intersections logged.
• All drill cores have been
geologically logged.
• Geological logging is
completed for all holes, and it
is representative.
• The lithology, alteration,
geotechnical and structural
characteristics of drill
samples are logged following
standard procedures and
using standardised
ASX Announcement
Released 24 March 2026 11
Criteria JORC Code explanation Commentary
geological codes.
• Logging is both qualitative
and quantitative depending
on field being logged.
• All drill-holes are logged in
full.
• All drill core are digitally
photographed and stored.
Sub-
sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether
quarter, half or all core taken.
• If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the sampling
is representative of the in situ material
collected, including for instance results for
field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the
grain size of the material being sampled.
• All core has been cut and
sampled at the core
processing facility in
Bleiberg, Austria.
• PQ and NQ core was split by
saw in half, always using the
same half for sampling
purposes.
• Duplicate sampling is carried
out routinely throughout the
drilling campaign in line with
QAQC procedure. The
laboratory will carry out
routine internal repeat
assays on crushed samples.
• Considering the grain size,
half core samples are
believed to be a
representative of the sample.
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied
and their derivation, etc.
• Nature of quality control procedures adopted
(eg standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (ie lack of bias) and
precision have been established.
• Samples have been
submitted to ALS
laboratories.
• ALS is an internationally
certified independent
service provider. Industry
standard assay quality
control techniques will be
used for lithium related
elements.
• Samples are submitted for
multi-element ICP analysis
• Aqua regia digest followed
by ICP-MS+ICP-AES and
overrange samples by 4
acid digest and ICP-AES
analyses (48 elements).
• A small range of selected
samples were subjected to
method ME-MS89, sodium
peroxide fusion for accurate
determination of
germanium.
Verification
of sampling
and
assaying
• The verification of significant intersections by
either independent or alternative company
personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
• No verification of sampling
and assaying have been
completed by BM8 to date.
• Selected sample results
which are considered to be
ASX Announcement
Released 24 March 2026 12
Criteria JORC Code explanation Commentary
procedures, data verification, data storage
(physical and electronic) protocols.
• Discuss any adjustment to assay data.
significant will be subjected
to resampling by the
company in the future.
Location of
data points
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic
control.
• The drill hole collar positions
in Appendix. 1 have been
located by handheld GPS.
• On completion of drilling
program, collar positions will
be located by differential
GPS and reports updated
accordingly.
• The grid datum is 31255-
EMG/Austria GK Central
• Downhole surveys have
been collected approx. every
30m utilizing reflex tool.
Data spacing
and
distribution
• Data spacing for reporting of Exploration
Results.
• Whether the data spacing and distribution is
sufficient to establish the degree of
geological and grade continuity appropriate
for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications
applied.
• Whether sample compositing has been
applied.
• This is a preliminary drilling
campaign and therefore
suitable spacing and
distribution to establish the
degree of geological and
grade continuity appropriate
for the Mineral Resource and
Ore Reserve estimation is
yet to be determined.
Orientation
of data in
relation to
geological
structure
• Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
• If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
• Drilling has been carried out
in order to sample across the
strike of the mineralisation,
based on surface mapping
and limited historical drilling.
However, as this drilling is
preliminary, further drilling is
required to determine the
orientation of mineralisation
in this area.
Sample
security
• The measures taken to ensure sample
security.
• At all times samples were in
the custody and control of
the Company’s
representatives until delivery
to the laboratory where
samples are held in a secure
enclosure pending
processing.
Audits or
reviews
• The results of any audits or reviews of
sampling techniques and data.
• No external audit has been
undertaken at this stage.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria JORC Code explanation Commentary
Mineral
tenement
• Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint
ventures, partnerships, overriding royalties,
• The Bleiberg project is
located approx. 190km
south of the city of Salzburg
in southern Austrian within
ASX Announcement
Released 24 March 2026 13
Criteria JORC Code explanation Commentary
and land
tenure status
native title interests, historical sites,
wilderness or national park and
environmental settings.
• The security of the tenure held at the time of
reporting along with any known impediments
to obtaining a licence to operate in the area.
the eastern Alps region of
Europe.
• The Bleiberg Earn-in JV
project consists of 116
claims (EL 476/22 (BB1) –
591/22 (BB116)) held in the
name of the Company,
portion overlays with GKB
tenure and second ranking.
The Company currently has
a 51% interest in the JV.
The Company may acquire
a further 14% interest (total
65%) within 36 months of
acquiring the
abovementioned 51%
interest by incurring an
additional C$3,500,000 in
expenditure on the project
(ie before May 2027). The
Company may acquire the
final 15% interest (total
80%) in the above Bleiberg
JV within 6.5 years upon
completion of a Bankable
Feasibility Study that is
compliance to JORC and
indicates the project will
have a production rate of at
least 100,000 tonnes per
year (ie before Nov 2030).
JV Partner retains clawback
earn-back rights for 36%
should the company not
complete the 65% earn in
rights. A portion of the
claims have third-party
mining claims (figure 2). The
details of the joint venture
were reported to the ASX on
8 December 2022 and 16
May 2024.
• The Bleiberg West project
consists of 60 claims which
the Company has 100%
interest (1524/23 (BW1)–
1583/23 (BW60)) held by
the Company.
• The Bleiberg 2025
Extension project consists
of 130 claims which the
Company has 100% interest
(1413/24 (BE1)– 1542/24
(BE130)) held by the
Company.
• No known impediments.
ASX Announcement
Released 24 March 2026 14
Criteria JORC Code explanation Commentary
Exploration
done by
other parties
• Acknowledgment and appraisal of
exploration by other parties.
• A small number of Annual
exploration documents and
district geological review
documents were available
for project evaluation and
strategy development. Over
the second half of last
century only a handful of
exploration drill holes have
been drilled around
Bleiberg. Most efforts have
gone into mapping and rock
chip sampling. The
surrounding area of Bleiberg
is considered as under-
explored.
Geology • Deposit type, geological setting and style of
mineralisation.
• The Bleiberg deposit is
classified as a stratabound
carbonate-hosted Pb-Zn
deposit, with enrichment in
specialty metals including
germanium, gallium, and
cadmium. Mineralisation
occurs within Triassic
carbonate units in the
Northern Karawanken Alps,
Austria.
Drill hole
Information
• A summary of all information material to the
understanding of the exploration results
including a tabulation of the following
information for all Material drill holes:
o easting and northing of the drill hole
collar
o elevation or RL (Reduced Level –
elevation above sea level in metres) of
the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified
on the basis that the information is not
Material and this exclusion does not detract
from the understanding of the report, the
Competent Person should clearly explain
why this is the case.
• All drill hole collar locations
and mineralised intercepts
have been reported in this
report for all holes
completed to date.
• No relevant data has been
excluded from this report.
Data
aggregation
methods
• In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (eg cutting of
high grades) and cut-off grades are usually
Material and should be stated.
• Where aggregate intercepts incorporate
short lengths of high grade results and
longer lengths of low grade results, the
procedure used for such aggregation should
be stated and some typical examples of
such aggregations should be shown in
• All reported significant
intersections have been
length weighted averages.
High grades have not been
cut.
• Significant intercepts
reported at a 0.20% Zn+Pb
cut off grade with maximum 2
m of internal dilution.
• No metal equivalent values
are reported.
ASX Announcement
Released 24 March 2026 15
Criteria JORC Code explanation Commentary
detail.
• The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
Relationship
between
mineralisatio
n widths and
intercept
lengths
• These relationships are particularly
important in the reporting of Exploration
Results.
• If the geometry of the mineralisation with
respect to the drill hol
Share your feedback
Discover