BM8 Intersects 54.1m @ 1.74% Li2O at Falcon Lake, Ontario
Released
Released
Announcement PDF
ASX Announcement
Released 28 January 2025
Battery Age Minerals Intersects 54.1m @
1.74% Li2O at Falcon Lake Lithium Project,
Ontario
Highlights
• High-Grade Results: Exceptionally high-grade thick lithium intercepts encountered at
Falcon Lake Lithium Project, including 54.1m @ 1.74% Li₂O (24FL-107) and 55.95m @
1.47% Li₂O (24FL-108). These assays represent the Company’s best lithium drill results
to date, with mineralisation remaining open along strike and at depth at the prospect.
• Significant intercepts include:
o 54.1 metres @ 1.74% Li2O from 100.85m down-hole, 24FL-107
o 55.95 metres @ 1.47% Li2O from 222.2m down-hole, 24FL-108
o 43.0 metres @ 1.62% Li2O from 62.2m down-hole, 24FL-114
o 22.55 metres @ 1.74% Li2O from 39.3m down-hole, 24FL-113
o 19.7 metres @ 1.62% Li2O from 57.5m down-hole, 24FL-112
o 21.6 metres @ 1.46% Li2O from 115.7m down-hole, 24FL-110
• Significant Southern Extension: Recent drilling has expanded the mineralised zone
southward, with hole 24FL-114 intersecting 43.0m @ 1.62% Li₂O from 62.2m to 105.2m,
marking the most southern extension drilled to date.
• Open to the South and at Depth: The Falcon Little Lake spodumene-bearing pegmatite
remains open, offering significant potential for further expansion in both down-dip and
towards the south.
• Exploration Upside: Only 5 of the 30 high-priority targets identified through geophysical
surveys and surface sampling have been drill tested, leaving substantial scope for further
discoveries.
Battery Age Minerals Ltd (ASX: BM8; “Battery Age” or “the Company”) is pleased to report
the final assay results from the 2024 drilling campaign at its Falcon Lake Lithium Project in
Ontario, Canada. The results highlight significant mineralisation, underscoring the
project's scale potential, with spodumene-bearing pegmatite intercepts over 55m thick
encountered during the winter drill program at the Falcon Little Lake target.
The Falcon Little Lake target saw a total of 15 holes drilled in 2024, with significant
mineralisation encountered in 14 of them (Appendix 1, Table 1). The recent winter drilling
program focused on the southern extension of the target, completing eight holes that revealed
high grades and a thickening of the mineralised body along strike and at depth.
Battery Age Minerals Ltd
ASX: BM8
ACN 085 905 997
batteryageminerals.au
T: +61 (8) 6109 6689
E: info@batteryage.au
Level 50, 108 St Georges Terrace
Perth, WA 6000
PO Box 7310, Cloisters Square Po, WA 6850
1
Furthermore, a 2023 geophysical survey identified a magnetic low to the south, correlating with
pegmatite bodies and enhancing the potential of the southern extension.
The recent drilling program at the new discovery has returned significant high-grade assay
results across all eight holes. Highlights include an intercept of 55.95m at 1.47% Li₂O in hole
24FL-108 from 222.2m, marking the deepest mineralisation identified on the property to date.
Strong assays continue southward, with hole 24FL-114 intersecting 43m at 1.62% Li₂O from
62.2m to 105.2m, representing the most southern extension drilled so far. The Falcon Little
Lake spodumene-bearing pegmatite remains open at depth and to the south, and it will remain
a high-priority target when drilling resumes in the future.
Figure 1 – Falcon Little Lake discovery plan view. 2024 Winter drilling highlighted.
ASX Announcement
Released 28 January 2025
2
Hole
24FL-107
24FL-107
24FL-108
24FL-109
24FL-109
24FL-109
24FL-110
24FL-111
24FL-111
24FL-112
24FL-113
24FL-114
From_m To_m
Interval (m) Li2O %
42.05
49.95
7.9
1.01
100.85 154.95
54.1
1.74
222.2 278.15
55.95
1.47
87.65
91.65
4
1.71
178.05
184.5
6.45
1.19
211.15
218
6.85
1.57
115.7
137.3
21.6
1.46
30.6
37.2
6.6
1.72
41.3
46.85
5.55
1.56
57.5
77.2
19.7
1.62
39.3
61.85
22.55
1.74
62.2
105.2
43.0
1.62
Table 1 – 2024 Falcon Lake Winter Drilling Highlights. Intervals are down hole length, true width not known.
A
A1
Figure 2 – Cross Section at Falcon Little Lake, displaying holes 24FL-107 & 24Fl-108 intercepts
ASX Announcement
Released 28 January 2025
3
Figure 3 – Core box containing spodumene grading 1.47% Li2O in hole 24FL-108_245.65m-263.1m, Falcon Little
Lake (refer to Appendix 1, Table 1, significant intercept table).
Falcon
Little Lake
Figure 3 – Plan view of the completed and planned drill hole collars across the Falcon Lake Mineralised corridore
The Falcon Lake Lithium Project holds significant exploration upside, with only 5 of the 30 highpriority targets generated from fieldwork having been drill tested to date. This leaves
substantial potential for further discoveries across the largely untested project area. The initial
drilling has already demonstrated the presence of high-grade spodumene-bearing pegmatites,
and with the remaining targets identified through geophysical surveys and surface sampling,
the opportunity for expanding mineralised zones and uncovering new pegmatite bodies is
considerable. Future drilling programs will focus on systematically testing these targets to
unlock the full potential of the project.
ASX Announcement
Released 28 January 2025
4
Battery Age CEO, Nigel Broomham, commented:
"These outstanding results from Falcon Lake continue to highlight the scale and quality of the
mineralisation within this exciting project. The significant southern extensions, combined with
the thick, high-grade intercepts at depth, underscore the enormous growth potential of this
asset.”
“With only a fraction of the identified targets tested so far, we are confident that future drilling
will unlock even greater value for our shareholders as we systematically explore this highly
prospective region."
[ENDS]
Release authorised by the Board of Battery Age Minerals Ltd.
Contacts
Investors / Shareholders
Nigel Broomham
Chief Executive Officer
P: +61 (0)8 6109 6689
E: info@batteryage.au
ASX Announcement
Released 28 January 2025
Media
Kelly-Jo Fry
Battery Age Minerals
P: +61 (0)8 6109 6689
E: kjfry@batteryage.au
5
Competent Person Statement
The information in this Report that relates to Geological Data and Exploration Results for the Falcon Lake Lithium
Project is based on, and fairly represents, information and supporting documentation compiled and reviewed by Mr
Nigel Broomham (BSc (Hons) Geology & Resource Economics) who is a Member of the Australasian Institute of
Mining and Metallurgy (AusIMM) and holds a Professional Certificate in JORC Code Reporting. Mr Broomham is
the Chief Executive Officer of Battery Age Minerals. Mr Broomham has sufficient experience which is relevant to
the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to
qualify as a Competent Person as defined in the 2012 Edition of the Joint Ore Reserves Committee (JORC)
"Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr Broomham
consents to the inclusion in this report of the matters based on information in the form and context in which they
appear. Mr Broomham holds securities in the Company.
The Company confirms that it is not aware of any new information or data that materially affects the information
included in any original announcement and that all material assumptions and technical parameters underpinning
the estimates in the original market announcement continue to apply and have not materially changed.
Compliance Statement
This report contains information on the Falcon Lake Project extracted from an ASX market announcement dated 7
December 2022, 2 February 2023, 4 July 2023, 26 July 2023, 31 July 2023, 2 August 2023, 16 August 2023, 6
September 2023, 14 September 2023, 5 October 2023, 10 October 2023, 16 October 2023, 25 October 2023, 30
November 2023, 13 December 2023, 8 July 2024, 12 August 2024, 12 September 2024 and 20 November 2024
released by the Company and reported in accordance with the 2012 edition of the “Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). The original market announcement is
available to view on www.batteryage.au and www.asx.com.au. Battery Age is not aware of any new information or
data that materially affects the information included in the original market announcement.
Forward-Looking Statement
This announcement may contain certain forward-looking statements and projections. Such forward looking
statements/projections are estimates for discussion purposes only and should not be relied upon. Forward looking
statements/projections are inherently uncertain and may therefore differ materially from results ultimately achieved.
Battery Age Minerals Limited does not make any representations and provides no warranties concerning the
accuracy of the projections and disclaims any obligation to update or revise any forward-looking statements/projects
based on new information, future events or otherwise except to the extent required by applicable laws. While the
information contained in this report has been prepared in good faith, neither Battery Age Minerals Limited or any of
its directors, officers, agents, employees or advisors give any representation or warranty, express or implied, as to
the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this
announcement.
ASX Announcement
Released 28 January 2025
6
Appendix 1 – Drill Collar Positions & Mineralised Intercepts
Hole
From_m
To_m
Interval_m
Li2O (%)
24FL-107
100.85
154.95
54.10
1.74
24FL-108
222.2
278.15
55.95
1.47
24FL-114
62.2
105.2
43.00
1.62
23FL-031
14.65
46.4
31.75
1.45
24FL-113
39.3
61.85
22.55
1.74
23FL-001
16.65
44.25
27.6
1.37
24FL-087
53.9
82.15
28.25
1.30
24FL-100
55
73.4
18.4
1.88
24FL-098
18.95
43.85
24.9
1.34
24FL-112
57.5
77.2
19.70
1.62
23FL-004
5.7
27.62
21.92
1.44
24FL-110
115.7
137.3
21.60
1.46
23FL-076
1.75
20.7
18.95
1.65
23FL-081
66.6
87.25
20.65
1.48
24FL-087
88.7
112
23.3
1.13
23FL-077
37.8
56.25
18.45
1.40
23FL-067
28.5
47.6
19.1
1.34
23FL-005
46.3
76.05
29.75
0.81
24FL-102
57.5
83.1
25.6
0.93
23FL-059
19.65
47
27.35
0.83
23FL-030
3.7
18.4
14.7
1.50
23FL-024
5.4
18.75
13.35
1.50
24FL-105
88.7
129.5
40.8
0.49
23FL-061
11.95
30
18.05
1.02
24FL-103
64.55
99.25
34.7
0.53
24FL-104
71.1
93.2
22.1
0.80
23FL-018
3.6
12.25
8.65
2.04
23FL-075
26.7
39.6
12.9
1.36
24FL-088
99.8
116.6
16.8
0.99
23FL-071
46.8
64
17.2
0.92
24FL-088
82.15
95.9
13.75
1.15
23FL-020
22.05
33.5
11.45
1.33
23FL-058
11.1
27
15.9
0.95
23FL-072
48.8
69
20.2
0.58
23FL-065
26.6
37.75
11.15
1.05
23FL-023
56.05
63.21
7.16
1.63
24FL-111
30.6
37.2
6.60
1.72
23FL-082
91.55
99.45
7.9
1.40
23FL-002
7.5
16.2
8.7
1.24
24FL-109
211.15
218
6.85
1.57
ASX Announcement
Released 28 January 2025
7
24FL-089
148.1
159
10.9
0.97
24FL-087
39.5
46.85
7.35
1.38
23FL-070
38.2
43.4
5.2
1.75
24FL-111
41.3
46.85
5.55
1.56
24FL-108
59.7
71
11.30
0.74
24FL-107
42.05
49.95
7.90
1.01
178.05
184.5
6.45
1.19
24FL-109
Table 1 – Significant Intercepts at Falcon Lake. 2024 Drilling Highlighted
Hole
Length_m
UTM_East
UTM_North
UTM_Elevation
Azimuth
Dip
23FL-001
56
418403.3
5591981
359
300
60
23FL-002
125
418363.7
5592004.3
360
300
-60
23FL-003
122
418434.4
5591962.6
359
300
-60
23FL-004
44
418391.8
5592037.4
363
300
-60
23FL-005
101
418430.2
5592021.9
361
300
-60
23FL-006
145
418473.8
5591997.4
360
300
-60
23FL-007
50
418337.6
5591959.3
358
300
-60
23FL-008
101
418381.2
5591934.7
359
300
-60
23FL-009
140
418424.7
5591910.2
361
300
-60
23FL-010
41
418416.1
5592069.5
362
300
-60
23FL-011
122
418476.5
5592053.2
362
300
-60
23FL-012
53
418313.1
5591915.7
359
300
-60
23FL-013
101
418356.6
5591891.2
361
300
-60
23FL-014
140
418400.2
5591866.6
362
300
-60
23FL-015
305
418440
5591987.7
356
300
-80
23FL-016
140
418443.8
5591842.1
361
300
-60
23FL-017
41
418350
5591981.1
357
300
-60
23FL-018
86
418393.5
5591956.5
354
300
-60
23FL-020
92
418396.4
5592012.3
355
300
-60
23FL-021
101
418440
5591987.7
356
300
-60
23FL-022
41
418399
5592068.2
361
300
-60
23FL-023
110
418442.5
5592043.7
364
300
-60
23FL-024
77
418347.1
5591925.3
358
300
-60
23FL-025
95
418390.6
5591900.7
358
300
-60
23FL-026
89
418434.4
5591876
362
300
-60
23FL-029
74
418420.4
5592056.1
361
300
-60
23FL-030
50
418397
5592051.9
361
300
-60
23FL-031
53
418360
5592029
362
210
-60
23FL-032
68
418360
5592029
362
300
-60
23FL-033
86
418342
5592034
361
210
-60
23FL-034
83.2
420012.6
5591877
339.03
300
-60
23FL-035
50
419988.1
5591834
341.19
300
-60
23FL-036
152
420056.8
5591853
341.41
300
-60
23FL-037
197
420053.5
5591797
342.45
300
-60
ASX Announcement
Released 28 January 2025
8
Hole
Length_m
UTM_East
UTM_North
UTM_Elevation
Azimuth
Dip
23FL-038
185
419957
5591661
356
300
-55
23FL-039
176
419905
5591680
300
300
-60
23FL-040
176
419977
5591675
412
300
-55
23FL-041
194
419949
5591636
412
300
-55
23FL-042
185
419979
5591713
343
300
-55
23FL-043
185
419995
5591830
340
300
-60
23FL-044
155
42062.69
5591388
388
300
-55
23FL-045
122
420673
5591419
388
300
-55
23FL-046
101
420602
5591344
376
300
-55
23FL-047
116
420698
5591463
392
300
-55
23FL-048
101
420734
5591528
391
300
-55
23FL-049
101
420704
5591648
390
300
-55
23FL-050
98
420737
5591584
389
300
-55
23FL-051
77
420663
5591545
384
300
-55
23FL-052
101
420784
5591562
381
300
-55
23FL-053
101
420430
5591471
383
310
-50
23FL-054
110
420484
5591443
335
310
-50
23FL-055
149
420527
5591468
393
290
-60
23FL-056
152
420474
5591408
379
300
-50
23FL-057
287
420474
5591408
379
310
-80
23FL-058
50
420675
5591531
390
300
-55
23FL-059
89
420675
5591531
390
300
-75
23FL-060
98
420675
5591505
391
300
-55
23FL-061
86
420682
5591505
390
300
-55
23FL-062
92
420688
5591579
388
300
-55
23FL-063
80
420661
5591482
390
300
-55
23FL-064
74
420655
5591458
390
300
-55
23FL-065
95
420696
5591575
389
260
-55
23FL-066
89
420762
5591584
380
270
-55
23FL-067
23FL-068
62
110
420758
420758
5591589
5591589
380
388
70
70
-45
-60
23FL-069
80
420804
5591585
375
270
-45
23FL-070
101
420804
5591585
375
270
-65
23FL-071
110
420705
5591560
390
270
-55
23FL-072
107
420694
5591518
390
270
-60
23FL-073
80
420720
5591656
390
270
-55
23FL-074
101
420745
5591656
389
270
-55
23FL-075
107
420745
5591682
391
270
-55
23FL-076
119
420745
5591707
394
270
-55
23FL-077
92
420770
5591706
395
270
-55
23FL-078
101
420770
5591732
395
270
-55
23FL-079A
19
420795.5
5591757
395
270
-55
23FL-079B
122
420796.5
5591757
395
270
-55
ASX Announcement
Released 28 January 2025
9
Hole
Length_m
UTM_East
UTM_North
UTM_Elevation
Azimuth
Dip
23FL-080
122
420769.8
5591681
387
270
-55
23FL-081
122
420795
5591706
387
275
-55
23FL-082
131
420819
5591706
386
270
-55
23FL-083
107
420770.6
5591655
387
270
-55
23FL-084
140
420826
5591621
386
270
-45
23FL-085
140
420852
5591609
386
270
-45
24FL-086
24FL-087
24FL-088
24FL-089
24FL-090
24FL-091
24FL-092
24FL-093
24FL-094
24FL-095
24FL-096
24FL-097
24FL-098
24FL-099
24FL-100
24FL-101
24FL-102
24FL-103
24FL-104
24FL-105
24FL-106A
24FL-106B
24FL-107
24FL-108
24FL-109
24FL-110
24FL-111
24FL-112
24FL-113
24FL-114
24FL-115
24FL-116
24FL-117
24FL-118
140
152
200
215
173
221
92
101
128
131
176
119
101
161
164
164
122
140
113
161
14
80
194
302
263
299
272
299
305
125
83
110
86
101
420846
420795
420821
420847
420796
420869
421400
421387
421422
421406
421430
421436
421523
421558
421558
421558
421457
421430
421430
421430
418952
418952
421364
421364
421364
421364
421350
421350
421350
421350
421132
421151
421170
421132
5591702
5591683
5591683
5591683
5591662
5591683
5591416
5591395
5591403
5591374
5591358
5591432
5591371
5591390
5591390
5591390
5591384
5591358
5591358
5591358
5591954
5591954
5591220
5591220
5591220
5591220
5591186
5591186
5591186
5591186
5591186
5591352
5991401
5591342
390
392
392
391
388
387
371
370
369
365
366
377
368
365
365
365
369
366
366
366
355
355
365
365
365
365
363
363
363
363
300
371
371
370
270
270
270
270
270
270
300
300
300
300
300
300
300
300
265
265
120
120
150
120
110
290.2
83
83
122
122
130
130
165
300
300
300
300
290
-55
-55
-55
-55
-55
-55
-55
-55
-55
-55
-55
-55
-55
-55
-55
-70
-45
-45
-45
-60
-55
-55
-45
-60
-45
-60
-45
-60
-45
-55
-55
-55
-55
-55
Table 2 – Falcon Lake Completed Holes to date, with all 2024 drilling in bold - Drill Collar Details. UTM Grid:
NAD83_Z16N
ASX Announcement
Released 28 January 2025
10
Hole
From_m
To_m
Interval
Li2O_%
23FL-001
23FL-002
23FL-002
23FL-003
23FL-004
23FL-005
23FL-007
23FL-007
23FL-008
23FL-008
23FL-008
23FL-010
23FL-014
23FL-017
23FL-017
23FL-018
23FL-018
23FL-018
23FL-020
23FL-020
23FL-021
23FL-023
23FL-024
23FL-024
23FL-024
23FL-030
23FL-031
23FL-033
23FL-033
23FL-034
23FL-034
23FL-037
23FL-037
23FL-038
23FL-040
23FL-040
23FL-041
23FL-041
23FL-041
23FL-041
23FL-041
23FL-044
23FL-045
23FL-045
23FL-047
23FL-048
23FL-050
23FL-053
16.65
7.5
62
40.18
5.7
46.3
9.05
29
29.8
33.7
39.43
28.75
13.38
14.3
23.2
3.6
13.75
69.5
22.05
29
46.52
56.05
5.4
26.8
37.8
3.7
14.65
53.9
57.03
30.05
32.44
97.45
160.55
112.5
134
141.2
105.25
112.85
118
121.75
133.8
2.75
17.25
24.7
77.7
38.99
2.5
2.85
44.25
16.2
86
43.62
27.62
76.05
15.64
32.52
32.5
34.55
47.28
29.3
14.95
19
29.09
12.25
19.8
80.5
33.5
33
48.37
63.21
18.75
30.5
39.6
18.4
46.4
56.54
64.5
32.19
32.89
98.5
161.7
117.95
139.95
143.75
107.4
116.15
120.25
122.95
143.6
4.6
19.45
27.15
83.2
41.92
5.41
4.05
27.6
8.7
24
3.44
21.92
29.75
6.59
3.52
2.7
0.85
7.85
0.55
1.57
4.7
5.89
8.65
6.05
11
11.45
4
1.85
7.16
13.35
3.7
1.8
14.7
31.75
2.64
7.47
2.14
0.45
1.05
1.15
5.45
5.95
2.55
2.15
3.3
2.25
1.2
9.8
1.85
2.2
2.45
5.5
2.93
2.91
1.2
1.36
1.3
0.32
1.09
1.45
0.81
0.33
1.48
1
0.42
0.24
1.34
0.54
1
1.23
2.04
1.23
0.12
1.33
1.93
1.16
1.63
1.5
0.91
0.32
1.5
1.45
1.18
1.02
0.83
1.32
0.14
0.13
0.23
0.69
0.29
0.72
0.21
1.95
1.02
0.14
1.21
0.83
0.61
0.73
1.16
1.03
0.48
ASX Announcement
Released 28 January 2025
11
23FL-054
23FL-054
23FL-056
23FL-058
23FL-059
23FL-060
23FL-061
23FL-063
23FL-065
23FL-067
23FL-069
23FL-069
23FL-070
23FL-070
23FL-071
23FL-072
23FL-073
23FL-074
23FL-075
23FL-076
23FL-077
23FL-078
23FL-079B
23FL-080
23FL-080
23FL-081
23FL-082
23FL-082
24FL-086
24FL-087
24FL-087
24FL-087
24FL-087
24FL-088
24FL-088
24FL-089
24FL-091
24FL-092
24FL-094
24FL-095
24FL-098
24FL-100
24FL-102
24FL-103
24FL-104
24FL-105
24FL-107
24FL-107
24FL-108
ASX Announcement
Released 28 January 2025
17.6
73.2
98.45
11.1
19.55
23.85
11.95
10.65
26.6
28.5
29.2
32.7
38.2
46.2
46.8
48.8
3.8
35
26.7
1.75
37.8
17
85.8
50.95
57.8
66.6
91.55
100.85
119.95
39.5
53.9
88.7
120
82.15
99.8
148.1
155.1
28
59
82.2
18.95
55
57.5
64.55
71.1
88.7
42.05
100.85
59.7
18.6
73.9
100.15
27
47
31
30
17
37.75
47.6
31.65
38.3
43.4
47.55
64
69
9.1
39.5
39.6
20.7
56.25
20
87.5
55.6
60.5
87.25
99.45
104.5
121.3
46.85
82.15
112
121.6
95.9
116.6
159
158.1
30.9
64.85
86
43.85
73.4
83.1
99.25
93.2
129.5
49.95
154.95
71
1
0.7
1.7
15.9
27.45
7.15
18.05
6.35
11.15
19.1
2.45
5.6
5.2
1.35
17.2
20.2
5.3
4.5
12.9
18.95
18.45
3
1.7
4.65
2.7
20.65
7.9
3.65
1.35
7.35
28.25
23.3
1.6
13.75
16.8
10.9
3
2.9
5.85
3.8
24.9
18.4
25.6
34.7
22.1
40.8
1.01
1.74
0.74
0.42
0.27
1.24
0.95
0.83
1.06
1.02
1.06
1.05
1.34
1.6
1.27
1.75
0.38
0.92
0.58
0.48
0.03
1.36
1.65
1.4
0.32
0.13
1.43
1.58
1.48
1.4
1.02
0.20
1.38
1.30
1.13
0.68
1.15
0.99
0.97
1.19
1.25
0.13
0.12
1.34
1.88
0.93
0.53
0.80
0.49
7.9
54.1
11.3
12
24FL-108
24FL-109
24FL-109
24FL-109
24FL-109
24FL-109
24FL-109
24FL-110
24FL-111
24FL-111
24FL-111
24FL-111
24FL-111
24FL-112
24FL-113
24FL-114
24FL-115
24FL-116
24FL-118
222.2
44.58
87.65
178.05
201.85
211.15
225.75
115.7
30.6
41.3
154.8
112.95
132.6
57.5
39.3
62.2
64.3
61.05
79.75
278.15
52.4
91.65
184.5
205.3
218
227.95
137.3
37.2
46.85
160.7
116.05
149.05
77.2
61.85
105.2
65.9
62.6
81.15
1.47
0.82
1.71
1.19
0.25
1.57
0.81
1.46
1.72
1.56
0.12
0.95
0.11
1.62
1.74
1.62
1.33
1.26
1.51
55.95
7.82
4
6.45
3.45
6.85
2.2
21.6
6.6
5.55
5.9
3.1
16.45
19.7
22.55
43
1.6
1.55
1.4
Table 3 –Mineralised Intervals (>0.1% Li2O) and greater than 0.45m. Intervals are down hole length, true width
not known.
Appendix 2 – JORC CODE, 2012 EDITION – TABLE 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
Sampling
techniques
JORC Code explanation
• Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
• Aspects of the determination of
mineralisation that are Material to the Public
Report.
• In cases where ‘industry standard’ work has
been done this would be relatively simple
(eg ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation
may be required, such as where there is
coarse gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (eg submarine nodules)
ASX Announcement
Released 28 January 2025
Commentary
• All diamond drill core is NQ
(76mm) in this drilling
program.
• Diamond core sample
intervals are logged for
lithology, structural and
geotechnical information,
measured, photographed,
and placed into numbered
trays prior to sampling.
• Core has been sampled on
nominal ~1m intervals (0.80
– 1.20m) where possible
unless geological boundaries
dictate otherwise.
• Geological boundaries have
not been crossed by sample
intervals.
• ½ core samples have been
split by core saw, collected,
and submitted for analysis to
AGAT Laboratories along
with regular duplicates,
standards and blanks in line
with QAQC procedures.
13
Criteria
Drilling
techniques
Drill sample
recovery
Logging
Subsampling
techniques
and sample
preparation
JORC Code explanation
may warrant disclosure of detailed
information.
• Drill type (eg core, reverse circulation, openhole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
• Method of recording and assessing core and
chip sample recoveries and results
assessed.
• Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
• Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
• Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
• Whether logging is qualitative or quantitative
in nature. Core (or costean, channel, etc)
photography.
• The total length and percentage of the
relevant intersections logged.
• If core, whether cut or sawn and whether
quarter, half or all core taken.
• If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the sampling
is representative of the in situ material
collected, including for instance results for
field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the
grain size of the material being sampled.
ASX Announcement
Released 28 January 2025
Commentary
• The same side of the core is
always sampled in-line with
procedure.
• All holes are NQ diamond
drill holes.
• A Gyro based system has
been used for both rig
alignment and downhole
measurements on all holes.
• All core is depth marked and
oriented to check against
drillers measurements
(blocks), ensuring that all
core loss is considered.
Diamond core recovery is
recorded into the database.
• No significant core loss has
been observed to date.
• All drill cores have been
geologically logged.
• Geological logging is
completed for all holes, and it
is representative.
• The lithology, alteration,
geotechnical and structural
characteristics of drill
samples are logged following
standard procedures and
using standardised
geological codes.
• Logging is both qualitative
and quantitative depending
on field being logged.
• All drill-holes are logged in
full.
• All drill core are digitally
photographed and stored.
• All core has been cut and
sampled at the core
processing facility in
Armstrong, Ontario.
• NQ core was split by saw in
half, always using the same
half for sampling purposes.
• Duplicate sampling is carried
out routinely throughout the
drilling campaign in line with
QAQC procedure. The
laboratory will carry out
routine internal repeat
assays on crushed samples.
• Considering the grain size,
half core NQ samples are
believed to be a
representative of the sample.
14
Criteria
Quality of
assay data
and
laboratory
tests
Verification
of sampling
and
assaying
Location of
data points
Data spacing
and
distribution
Orientation
of data in
relation to
geological
structure
JORC Code explanation
• The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied
and their derivation, etc.
• Nature of quality control procedures adopted
(eg standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (ie lack of bias) and
precision have been established.
Commentary
•
•
•
•
• The verification of significant intersections by
either independent or alternative company
personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
• Discuss any adjustment to assay data.
•
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic
control.
• Data spacing for reporting of Exploration
Results.
• Whether the data spacing and distribution is
sufficient to establish the degree of
geological and grade continuity appropriate
for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications
applied.
• Whether sample compositing has been
applied.
•
• Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
• If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
•
ASX Announcement
Released 28 January 2025
•
•
•
•
•
•
Samples have been
submitted to AGAT
laboratories.
AGAT is an internationally
certified independent
service provider. Industry
standard assay quality
control techniques will be
used for lithium related
elements.
Samples are submitted for
multi-element ICP analysis
Sodium Peroxide Fusion is
used followed by combined
ICP-OES and ICP-MS
analyses (58 elements).
No verification of sampling
and assaying have been
completed by BM8 to date.
No Holes have been twinned
to date by BM8
Selected sample results
which are considered to be
significant will be subjected
to resampling by the
company in the future.
The drill hole collar positions
in Appendix. 1 have been
located by handheld GPS.
The grid datum is NAD83
Zone 16N.
Downhole surveys have
been collected approx. every
30m utilizing gyro tool.
This is a exploration drilling
campaign and therefore
suitable spacing and
distribution to establish the
degree of geological and
grade continuity appropriate
for the Mineral Resource and
Ore Reserve estimation is
yet to be determined.
No sample compositing has
occurred beyond what is
outlined under “sampling
Techniques”
Drilling has been carried out
in order to sample across the
strike of the mineralisation,
based on surface mapping
and limited historical drilling,
topography and access.
However, as this drilling is
preliminary, further drilling is
required to determine the
15
Criteria
JORC Code explanation
Sample
security
• The measures taken to ensure sample
security.
Audits or
reviews
• The results of any audits or reviews of
sampling techniques and data.
ASX Announcement
Released 28 January 2025
Commentary
orientation of mineralisation
in this area.
• At all times samples were in
the custody and control of
the Company’s
representatives until delivery
to the laboratory where
samples are held in a secure
enclosure pending
processing.
• No external audit has been
undertaken at this stage.
16
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
Mineral
tenement
and lan
Share your feedback
Discover