Amendment to ASX Announcement 22 January
Released
Released
Announcement PDF
ASX Announcement
Released 23 January 2025
Amendment to ASX Announcement
Battery Age Minerals Ltd (ASX: BM8; “Battery Age” or “the Company) refers to the
announcement released on 22 January 2025 titled “Germanium 76 Confirmed in Historic
Concentrate at Bleiberg Mine”.
The attached amended announcement now includes further information in Appendix 2 JORC
Table 1 regarding the confirmation of Germanium-76 (“Ge76”) in the concentrate from the
historic Bleiberg mine.
The Company also confirms that it is not aware of any new information or data that materially
affects the information.
[ENDS]
Release authorised by the Board of Battery Age Minerals Ltd.
Contacts
Investors / Shareholders
Nigel Broomham
Chief Executive Officer
P: +61 (0)8 6109 6689
E: info@batteryage.au
Battery Age Minerals Ltd
ASX: BM8
ACN 085 905 997
Media
Kelly-Jo Fry
Battery Age Minerals
P: +61 (0)8 6109 6689
E: kjfry@batteryage.au
batteryageminerals.au
T: +61 (8) 6109 6689
E: info@batteryage.au
Level 50, 108 St Georges Terrace
Perth, WA 6000
PO Box 7310, Cloisters Square Po, WA 6850
1
ASX Announcement
Released 23 January 2025
Germanium 76 Confirmed in Historic
Concentrate at Bleiberg Mine
HIGHLIGHTS
•
Ge76 Confirmed in Bleiberg Concentrate: Battery Age Minerals has successfully
tested and confirmed the presence of Germanium-76 (Ge76) in the concentrate from
historical mining operations at the Bleiberg mine in Austria, marking a key milestone in
the Company’s progress on the project.
•
Strategic Focus on Semiconductor Applications: The confirmation of Ge76, a
critical isotope for semiconductor technologies, reinforces Bleiberg’s potential as a
strategic supplier of materials essential for the rapidly growing tech sector. The North
Atlantic Treaty Organisation (NATO) in December 2024 identified Germanium as one
of only 12 raw materials essential for defence and energy security.
•
Historical Significance of Bleiberg Mine: The Bleiberg mine, with a 700-year history,
was a major global producer of several critical minerals, including germanium, and has
historically contributed approximately 172 tonnes of germanium, solidifying its
importance in the global market1.
•
2025 Exploration Plan: The Company is preparing for a comprehensive exploration
program at Bleiberg, with plans to submit its maiden drilling permit in early 2025.
Fieldwork will also be focused on the identification of historic concentrate and tailings
material at both Bleiberg and Hochibir across numerous historic workings and mineral
occurrences.
Battery Age Minerals Ltd (ASX: BM8, “Battery Age” or “the Company”) is excited to
announce the confirmation of Germanium-76 (“Ge76”) in the concentrate from the historic
Bleiberg mine. The testing, which was conducted as part of the Company’s ongoing exploration
activities, has successfully identified Ge76 at an atom abundance of 7.41% (Table 1), in the
sample taken from historical mining and beneficiation operations. This breakthrough
represents a pivotal moment for the Company as it works to unlock Bleiberg’s full potential as
a significant source of critical minerals for advanced technology applications.
The Bleiberg mine, located in Carinthia, Austria, has a remarkable history dating back 700
years. Historically, it was one of Europe’s top producers of high-grade germanium, along with
other valuable minerals such as zinc, lead, molybdenum, and cadmium. The mine produced
approximately 172 tonnes of germanium over its operational life, cementing its legacy as one
of the world’s largest sources of the critical material.
Battery Age’s recent testing of the Germanium concentrate has confirmed the presence of
Germanium-76 (Ge76), a vital isotope for the semiconductor industry. Ge76 is particularly
important for applications in infrared optics, fiber-optic systems, advanced transistors, and
other cutting-edge technologies. This confirmation positions Bleiberg as a potential strategic
supplier of Ge76 to meet the growing global demand for critical materials essential for
semiconductor manufacturing.
Battery Age Minerals Ltd
ASX: BM8
ACN 085 905 997
batteryageminerals.au
T: +61 (8) 6109 6689
E: info@batteryage.au
Level 50, 108 St Georges Terrace
Perth, WA 6000
PO Box 7310, Cloisters Square Po, WA 6850
1
With the global semiconductor industry continuing to expand, particularly in high-tech fields
such as electronics, telecommunications, and defense, the demand for high-quality germanium
has never been greater. The confirmation of Ge76 in Bleiberg concentrate is a significant
indication of the Company’s Bleiberg project’s potential as a strategic high-quality supplier of
this critical material.
As the world’s leading producer of germanium, China’s recent export restrictions have
exacerbated concerns over the stability and reliability of global supply. Battery Age believes
there is a need for alternative and secure sources of this critical material, particularly for
industries such as semiconductors, telecommunications, and defense technologies.
Battery Age is moving forward with the identification and additional testing of other historical
concentrates and tailings across the project area to fully assess its quality and suitability for
advanced technological applications. The Company is also preparing for a comprehensive
exploration program, with plans to submit its maiden drilling permit in early 2025. These
activities will further define Bleiberg’s potential as a strategic source of critical minerals for the
global market.
Ge70
Ge72
Ge73
Ge74
Ge76
Abundance (Atom%)
21.12
27.47
7.71
36.30
7.41
Table 1: Results from Ge Isotope separation analysis conducted on concentrate from historic Bleiberg mine. The
analysis is carried out by ICP-SFMS (ELEMENT XR, ThermoScientific) using internal standardization and external
calibration with bracketing isotope SRMs.
Figure 2: Bleiberg Zinc Lead Germanium Project located in the state of Carinthia, Austria.
ASX Announcement
Released 23 January 2025
2
Antoni Ge Con Sample
Figure 2: Battery Age exploration tenure, historic mining corridor and production shafts, including Antoni shaft
where sample was collected (X474158.8; Y 5165543.6). Inset table demonstrates historical data for the Bleiberg
Mine from previous workings1.
Battery Age CEO, Nigel Broomham, commented:
“We are extremely pleased to confirm the presence of Germanium-76 in the Bleiberg
concentrate. This is a significant milestone and further reinforces our belief in Bleiberg’s
potential as a key supplier of critical materials for the rapidly growing semiconductor industry.
Given the increasing demand for germanium, and the recent supply chain challenges, this
confirmation on potential quality comes at a crucial time. We are excited to continue advancing
the Bleiberg project and look forward to sharing further results with the market in the coming
months.”
The Company will continue to keep the market informed on the results of further testing and
its exploration plans as it moves forward with its efforts to establish its Bleiberg project as a
key global source of germanium for high-tech applications.
ASX Announcement
Released 23 January 2025
3
References:
1. Zeeh,S. and Bechstadt,T. (1994). Carbonate-Hosted Pb-Zn Mineralisation at Bleiberg-Kreuth (Austria):
Compilation of Data and New Aspects. In: Fontbote,L. and Boni,M. editors, Sediment Hosted Pb-Zn
Ores, Special Publication No. 10 of the Society for Geology Applied to Mineral Deposits. pp. 271-2962.
Cerny,I. (1991). Lagerstättenforschung in Kärnten Neuergebnisse und Aspekte für die Zukunft.
Carinthiall 181./101. Jahrgang S. 119-129 Klagenfurt 1991.
Cerny,I. and Schroll,E. (1995). Spezialmetallgehalte in ZnS-Konzentraten der Lagerstätte BleibergKreuth. Arch. f. Lagerst.forsch. Geol. B.-A. ISSN 0253-097X Band 18 S. 5–33 Wien, Juni 1995.
Schroll,e. (2006). Neues zur Genese der Blei-Zink Lagerstätte Bleiberg. Carinthia II 196./116. Jahrgang
Seiten 483-500 Klagenfurt 2006.
Multi-Met (2023) Bleiberg Project - Multi-Met, Multi. Available at:
https://multimetdev.com/projects/bleiberg-project/.
Schor, D. (2021) TSMC details 5 nm, WikiChip Fuse. Available at:
https://fuse.wikichip.org/news/3398/tsmc-details-5-nm/ (Accessed: 25 February 2024).
Leach. D, Taylor. R, Fey. D et al.(2010), , A deposit model for Mississippi Valley-Type lead-zinc ores,
USGS Scientific Investigations Report 2010-5070-A.
Mining Insights Pty Ltd, Independent Geologists Report, 1 December 2022.
2. Refer to earn-in terms and structure set out in the Company’s announcement dated 16 May 2024 and
Prospectus dated 7 December 2022.
[ENDS]
Release authorised by the Board of Battery Age Minerals Ltd.
Contacts
Investors / Shareholders
Nigel Broomham
Chief Executive Officer
P: +61 (0)8 6109 6689
E: info@batteryage.au
ASX Announcement
Released 23 January 2025
Media
Kelly-Jo Fry
Battery Age Minerals
P: +61 (0)8 6109 6689
E: kjfry@batteryage.au
4
Competent Person Statement
The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the ‘JORC
Code’) sets out minimum standards, recommendations and guidelines for Public Reporting in Australasia of
Exploration Results, Mineral Resources and Ore Reserves.
The information in this release that relates to Exploration Results is based on information prepared by Dr Simon
Dorling. Dr Dorling is a member of the Australasian Institute of Geoscientists (Member Number: 3101) and a
consultant of Battery Age. Dr Dorling has sufficient experience which is relevant to the style of mineralisation and
type of deposit under consideration and to the activity which they are undertaking to qualify as a Competent Person
as defined in the 2012 Edition of the JORC Code (Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves). Dr Dorling consents to the inclusion in the release of the matters based on their
information in the form and context in which it appears.
Compliance Statement
This report contains information on the Bleiberg Project extracted from an ASX market announcement dated 8
December 2022, 2 February 2023, 13 July 2023, 26 February 2024, 26 March 2024 and 16 May 2024 released by
the Company and reported in accordance with the 2012 edition of the “Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). The original market announcement is
available to view on www.batteryage.au and www.asx.com.au. Battery Age is not aware of any new information or
data that materially affects the information included in the original market announcement.
Forward-Looking Statement
This announcement may contain certain forward-looking statements and projections. Such forward looking
statements/projections are estimates for discussion purposes only and should not be relied upon. Forward looking
statements/projections are inherently uncertain and may therefore differ materially from results ultimately achieved.
Battery Age Minerals Limited does not make any representations and provides no warranties concerning the
accuracy of the projections and disclaims any obligation to update or revise any forward-looking statements/projects
based on new information, future events or otherwise except to the extent required by applicable laws. While the
information contained in this report has been prepared in good faith, neither Battery Age Minerals Limited or any of
its directors, officers, agents, employees or advisors give any representation or warranty, express or implied, as to
the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this
announcement.
ASX Announcement
Released 23 January 2025
5
ASX Announcement
Appendix 2 – JORC CODE, 2012 EDITION – TABLE 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
Sampling
techniques
Drilling
techniques
Drill sample
recovery
JORC Code explanation
•
Nature and quality of sampling (eg cut channels, random
chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
•
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
•
Aspects of the determination of mineralisation that are
Material to the Public Report.
•
In cases where ‘industry standard’ work has been done this
would be relatively simple (eg ‘reverse circulation drilling
was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of detailed
information.
•
Drill type (eg core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc) and details (eg
core diameter, triple or standard tube, depth of diamond
tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc).
•
Method of recording and assessing core and chip sample
recoveries and results assessed.
ASX Announcement
Released 23 January 2025
Commentary
• The sample is a “grab’ sample archived from Zinc and
Germanium concentrate from the historic Bleiberg
operations
• No industry specific tools have been recorded to have been
used.
• The sample is recorded as Zinc and Germanium
concentrate from the historic Bleiberg operations
• The sample is considered to be a fair representation of the
Zinc and Germanium product which the mine was producing
• The sample is considered to have been fed from the
mineralised sources of the historic orebody from which they
were derived.
•
No drilling has been referenced or reported
•
No drilling has been referenced or reported
6
Criteria
Logging
Sub-sampling
techniques and
sample
preparation
JORC Code explanation
•
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
•
Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
•
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
•
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc) photography.
•
The total length and percentage of the relevant
intersections logged.
Commentary
•
•
•
•
•
•
•
ASX Announcement
Released 23 January 2025
If core, whether cut or sawn and whether quarter, half or all
core taken.
If non-core, whether riffled, tube sampled, rotary split, etc
and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
•
•
•
•
•
•
No drilling has been referenced or reported
The sample is a “grab’ sample archived from Zinc and
Germanium concentrate from the historic Bleiberg
operations
Sample is dry, and believed to be P80 <150 microns
No weight or density logged
No subsampling has taken place
The sample is a “grab’ sample archived from Zinc and
Germanium concentrate from the historic Bleiberg
operations
The sample is considered to be a fair representation of the
Zinc and Germanium product which the mine was producing
The sample is considered to have been fed from the
mineralised sources of the historic orebody from which they
were derived.
7
Criteria
Quality of
assay data and
laboratory
tests
Verification of
sampling and
assaying
Location of
data points
JORC Code explanation
•
Measures taken to ensure that the sampling is
representative of the in situ material collected, including for
instance results for field duplicate/second-half sampling.
•
Whether sample sizes are appropriate to the grain size of
the material being sampled.
•
The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the technique
is considered partial or total.
•
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining the
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation, etc.
•
Nature of quality control procedures adopted (eg standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (ie lack of bias) and precision
have been established.
•
The verification of significant intersections by either
independent or alternative company personnel.
•
The use of twinned holes.
•
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic)
protocols.
•
Discuss any adjustment to assay data.
•
Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings
and other locations used in Mineral Resource estimation.
•
Specification of the grid system used.
•
Quality and adequacy of topographic control.
ASX Announcement
Released 23 January 2025
Commentary
•
•
•
•
The analysis is carried out by ICP-SFMS (ELEMENT XR,
ThermoScientific) using internal standardization and
external calibration with bracketing isotope SRMs.
The analysis is provided by ALS Scandinavia AB Luleå,
Aurorum 10 Luleå Sweden 977 75 Accredited by: SWEDAC
Accreditation Number: 2030, ISO/IEC 17025
This Laboratory is accredited and specialises in Isotope ratio
analysis
•
Isotope ratio analysis is final and not repeated
•
•
•
No drilling has been referenced or reported
No assay data has been reported
No primary data entry has been reported
•
The location of the sample has been recorded from the
Bleiberg mining operations, Antoni Shaft Processing Facility.
MGI / Austria M31 EPSG: 31285
X
Y
474158.8
5165543.6
8
Criteria
Data spacing
and
distribution
Orientation of
data in relation
to geological
structure
Sample
security
Audits or
reviews
JORC Code explanation
•
Data spacing for reporting of Exploration Results.
•
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
•
Whether sample compositing has been applied.
•
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this
is known, considering the deposit type.
•
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to
have introduced a sampling bias, this should be assessed
and reported if material.
•
The measures taken to ensure sample security.
•
The results of any audits or reviews of sampling techniques
and data.
Commentary
• One sample only has been tested for Germanium isotope
ratio’s.
• No data spacing and distribution has been referenced
•
•
•
•
•
The sample is a “grab’ sample archived from Zinc and
Germanium concentrate from the historic Bleiberg
operations
Sample was sent to ALS Scandinavia AB Luleå, Aurorum 10
Luleå Sweden 977 75 Accredited by: SWEDAC
Accreditation Number: 2030, ISO/IEC 17025 by Bleiberg
Mining Engineer.
Sample was sent in sealed container and via private courier.
No external audit has been undertaken at this stage.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
Mineral
tenement and
land tenure
status
JORC Code explanation
• Type, reference name/number, location and ownership
including agreements or material issues with third parties
such as joint ventures, partnerships, overriding royalties,
native title interests, historical sites, wilderness or national
park and environmental settings.
ASX Announcement
Released 23 January 2025
Commentary
• The Bleiberg project is located appro. 130km south of the
city of Saizburg in southern Austrian within the eastern Alps
region of Europe.
• The Bleiberg Earn-in JV project consists of 116 claims (EL
476/22 (BB1) – 591/22 (BB116)) held in the name of the
Company. The Company currently has a 51% interest in the
9
Criteria
JORC Code explanation
• The security of the tenure held at the time of reporting
along with any known impediments to obtaining a licence
to operate in the area.
Exploration
done by other
parties
•
ASX Announcement
Released 23 January 2025
Acknowledgment and appraisal of exploration by other
parties.
Commentary
JV. The Company may acquire a further 14% interest (total
65%) within 36 months of acquiring the abovementioned
51% interest by incurring an additional C$3,500,000 in
expenditure on the project (ie before May 2027). The
Company may acquire the final 15% interest (total 80%) in
the above Bleiberg JV within 6.5 years upon completion of a
Bankable Feasibility Study that is compliance to JORC and
indicates the project will have a production rate of at least
100,000 tonnes per year (ie before Nov 2030). JV Partner
retains clawback earn-back rights for 36% should the
company not complete the 65% earn in rights. A portion of
the claims have third-party mining claims (figure 2). The
details of the joint venture were reported to the ASX on 8
December 2022 and 16 May 2024.
• The Bleiberg West project consists of 60 claims which the
Company has 100% interest (1524/23 (BW1)– 1583/23
(BW60)) held by the Company.
• No known impediments.
• Mining in an around Bleiberg dates back to more than 1000
years of mining
• Hundreds of kms of lateral development, stopes, shafts
have been established over nearly a millennia of mining in
the district
• State owned Mining company ran multiple exploration
campaigns
• Mapping was carried out between early 1950’s and late
1980’s
• Geochemical rock chip sampling was carried out in
association with mapping
10
Criteria
JORC Code explanation
Geology
•
Deposit type, geological setting and style of mineralisation.
Drill hole
Information
•
A summary of all information material to the
understanding of the exploration results including a
tabulation of the following information for all Material drill
holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea
level in metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
If the exclusion of this information is justified on the basis
that the information is not Material and this exclusion does
not detract from the understanding of the report, the
Competent Person should clearly explain why this is the
case.
In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade truncations
(eg cutting of high grades) and cut-off grades are usually
Material and should be stated.
•
Data
aggregation
methods
•
ASX Announcement
Released 23 January 2025
Commentary
• Data for 16 DDH for about 5,700m can be located in annual
exploration reports from 1974 to 1980; very limited
analytical data
• The Bleiberg mineralisation is classified as “carbonatehosted base metal” or MVT mineralisation; the principle
commodities are zinc, lead, germanium
• The Bleiberg base metal mining district is located in
southern Austria, near the border with Slovenia and Italy;
Bleiberg is one of several mining camps straddling the
Periadriatic Lineament, a major crustal fault line
• No drilling has been referenced or reported
•
No drilling has been referenced or reported
11
Criteria
Relationship
between
mineralisation
widths and
intercept
lengths
Diagrams
Balanced
reporting
JORC Code explanation
• Where aggregate intercepts incorporate short lengths of
high grade results and longer lengths of low grade results,
the procedure used for such aggregation should be stated
and some typical examples of such aggregations should be
shown in detail.
• The assumptions used for any reporting of metal equivalent
values should be clearly stated.
• These relationships are particularly important in the
reporting of Exploration Results.
• If the geometry of the mineralisation with respect to the
drill hole angle is known, its nature should be reported.
• If it is not known and only the down hole lengths are
reported, there should be a clear statement to this effect
(eg ‘down hole length, true width not known’).
• Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
significant discovery being reported These should include,
but not be limited to a plan view of drill hole collar
locations and appropriate sectional views.
• Where comprehensive reporting of all Exploration Results is
not practicable, representative reporting of both low and
high grades and/or widths should be practiced to avoid
misleading reporting of Exploration Results.
Commentary
•
No intercept widths or drill holes have been referenced
•
A map of the location of the project has been included.
•
One sample only has been tested for Germanium isotope
ratio’s.
The sample is a “grab’ sample archived from Zinc and
Germanium concentrate from the historic Bleiberg
operations
•
•
Other
substantive
•
ASX Announcement
Released 23 January 2025
Other exploration data, if meaningful and material, should
be reported including (but not limited to): geological
observations; geophysical survey results; geochemical
•
•
No results have been referenced or reported
12
Criteria
exploration
data
Further work
JORC Code explanation
survey results; bulk samples – size and method of
treatment; metallurgical test results; bulk density,
groundwater, geotechnical and rock characteristics;
potential deleterious or contaminating substances.
• The nature and scale of planned further work (eg tests for
lateral extensions or depth extensions or large-scale stepout drilling).
• Diagrams clearly highlighting the areas of possible
extensions, including the main geological interpretations
and future drilling areas, provided this information is not
commercially sensitive.
ASX Announcement
Released 23 January 2025
Commentary
•
•
Battery Age will continue with identification and additional
testing of other historical concentrates and tailings across
the project area to fully assess its quality and suitability for
advanced technological applications.
The Company is also preparing for a comprehensive
exploration program, with plans to submit its maiden
drilling permit in early 2025
13
Share your feedback
Discover