New mineralised zone discovered with 27.45m intercepts at FL
Released
Released
Announcement PDF
ASX Announcement
Released 5 October 2023
New mineralised area discovered at Falcon
Lake with intercepts up to 27.45m
First step-out drilling beyond historical occurrences delivers multiple wide
mineralised pegmatite intercepts, demonstrating potential for larger scale at
Falcon Lake.
Highlights
Another important breakthrough in the 2023 drilling campaign, with multiple
thick spodumene-bearing pegmatites intersected in a new zone discovered
immediately west of the Falcon Lake East pegmatite outcrop.
The discovery hole, 23FL-059, intersected 27.45 meters grading 0.83% Li20 from
19.55m down-hole, including 12m @ 1.23% Li20.
Additional intercepts also returned from the new zone, including:
o 18.05 metres grading 1.02% Li20 from 11.95m down-hole in hole 23FL-061;
o 15.9 metres grading 0.95% Li20 from 11.1m down-hole in hole 23FL-058; and
o 7.15 metres grading 1.06% Li20 from 23.85m down-hole in hole 23FL-060.
Drilling will continue in this area to further define the mineralisation extents and
structural geometry of the pegmatite.
Battery Age Minerals Ltd (ASX: BM8; “Battery Age” or “the Company”) is pleased to advise
that it has intersected a new zone of spodumene mineralisation during its maiden drilling
campaign at the Falcon Lake Lithium Project in Ontario, Canada.
Having stepped out from known previous mapped historical occurrences at Falcon Lake, the
Company has intersected multiple mineralised pegmatites with intercepts up to 27.45m in hole
23FL-059.
Battery Age Managing Director Gerard O’Donovan commented:
“This is a very promising development, as it is the first time that we have drilled spodumene
mineralisation outside of the historical occurrences at Falcon Lake, which is where most of our initial
drilling has logically been focused. We knew when we commenced exploration at the property that we
had three known mineralised occurrences identified by previous mapping.”
“Now we have proven through our summer fieldwork program and follow up drilling that this
mineralisation extends to new unexplored areas within an extensive 5km long prospective trend.”
“This gives us confidence in the potential scale of the asset and the drilling yet to come. We have only
drilled a very small portion of the property to date, so the scope for growth is encouraging.”
Battery Age Minerals Ltd
ASX: BM8
ACN 085 905 997
batteryageminerals.au
T: +61 (8) 6109 6689
E: info@batteryage.au
Level 50, 108 St Georges Terrace
Perth, WA 6000
PO Box 7310, Cloisters Square Po, WA 6850
These intercepts are in a new zone located immediately west of the Falcon Lake East prospect.
This new area was identified as part of the summer fieldwork campaign as being highly
prospective and sits outside of the previously mapped historical occurrences.
The intercepts also continue to be shallow and from surface in areas, demonstrating the
exceptional potential to delineate shallow resources at Falcon Lake.
Figure 1 – Plan View of recent discovery adjacent to Falcon Lake East showing (For Location Refer Figure 2).
ASX Announcement
Released 5 October 2023
2
ASX Announcement
Figure 1 Location
Figure 2 – Plan view of Falcon Lake drilled holes and future targets across 5km.
ASX Announcement
Released 5 October 2023
3
ASX Announcement
Given the location of the new zone outside of known historical mineralisation, the discovery
also highlights the scale potential of the Falcon Lake Project.
Figure 3 - Cross Section of 23FL-058 & 23FL-059
Figure 4 – Core box containing spodumene mineralisation in hole 23FL-059
ASX Announcement
Released 5 October 2023
4
Figure 5 - Cross Section of 23FL-061
This continued success of Battery Age’s maiden drilling program has confirmed the presence
of mineralised pegmatites outside of those previously explored and mapped areas, building
further on the outstanding drilling results generated to date across the project with only a
fraction of the property explored to date.
Significant assay results returned to date are included in the table below:
ASX Announcement
Released 5 October 2023
5
Hole
23FL-031
23FL-005
23FL-001
23FL-059
23FL-002
23FL-004
23FL-061
23FL-030
23FL-058
23FL-024
23FL-020
23FL-002
23FL-018
23FL-033
23FL-023
23FL-060
23FL-063
23FL-018
23FL-017
23FL-047
From_m
14.65
46.3
16.65
19.65
62
5.7
11.95
3.7
11.1
5.4
22.05
7.5
3.6
57.03
56.05
23.85
10.65
13.75
23.2
77.7
To_m
46.4
76.05
44.25
47
86
27.62
30
18.4
27
18.75
33.5
16.2
12.25
64.5
63.21
31
17
19.8
29.09
83.2
Interval_m
31.75
29.75
27.6
27.45
24
21.9
18.05
14.7
15.9
13.35
11.45
8.7
8.65
7.47
7.16
7.15
6.35
6.05
5.89
5.5
Li2O (%)
1.45
0.81
1.37
0.83
0.32
1.44
1.02
1.5
0.95
1.5
1.33
1.24
2.04
1.02
1.63
1.06
1.06
1.23
1.23
0.73
Table 1 - Significant Intercepts at Falcon Lake with new intercepts highlighted.
Figure 2 – Drill Collar Map – Falcon Discovery & Falcon Lake East
ASX Announcement
Released 5 October 2023
6
This is the first step-out zone targeted by the exploration team following the completion of field
mapping and, with a further 30 mapped pegmatites identified as part of the summer program,
the team will continue to systematically explore these high-priority targets moving forward into
the winter drilling campaign.
[ENDS]
Release authorised by the Board of Battery Age Minerals Ltd.
Contacts
Investors / Shareholders
Gerard O’Donovan
Managing Director
P: +61 (0)8 6109 6689
E: info@batteryage.au
Media
Nicholas Read – Read Corporate
P: +61 (0)8 9388-1474 / (0419) 929 046
E: nicholas@readcorporate.com.au
Competent Person Statement
The information in this Report that relates to Geological Data and Exploration Results for the Falcon Lake Lithium
Project is based on, and fairly represents, information and supporting documentation compiled and reviewed by Mr
Nigel Broomham (BSc (Hons) Geology & Resource Economics) who is a Member of the Australasian Institute of
Mining and Metallurgy (AusIMM) and holds a Professional Certificate in JORC Code Reporting. Mr Broomham is
the General Manager – Exploration of Battery Age Minerals. Mr Broomham has sufficient experience which is
relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is
undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Joint Ore Reserves Committee
(JORC) "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr
Broomham consents to the inclusion in this report of the matters based on information in the form and context in
which they appear. Mr Broomham holds securities in the Company. This announcement contains information
regarding the Falcon Lake Lithium Project extracted from ASX market announcement dated 4 July 2023 and 7
December 2022 and reported in accordance with the 2012 JORC Code and available for viewing at
batteryageminerals.au. The Company confirms that it is not aware of any new information or data that materially
affects the information included in any original announcement and that all material assumptions and technical
parameters underpinning the estimates in the original market announcement continue to apply and have not
materially changed.
Compliance Statement
This report contains information on the Falcon Lake Project extracted from an ASX market announcement dated
26 July 2023, 2 August 203, 16 August 2023, 6 September 2023 and 14 September 2023 released by the Company
and reported in accordance with the 2012 edition of the “Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves” (JORC Code). The original market announcement is available to view on
www.batteryage.au and www.asx.com.au. Battery Age is not aware of any new information or data that materially
affects the information included in the original market announcement.
Forward-Looking Statement
This announcement may contain certain forward-looking statements and projections. Such forward looking
statements/projections are estimates for discussion purposes only and should not be relied upon. Forward looking
statements/projections are inherently uncertain and may therefore differ materially from results ultimately
achieved. Battery Age Minerals Limited does not make any representations and provides no warranties
concerning the accuracy of the projections and disclaims any obligation to update or revise any forward-looking
statements/projects based on new information, future events or otherwise except to the extent required by
applicable laws. While the information contained in this report has been prepared in good faith, neither Battery
Age Minerals Limited or any of its directors, officers, agents, employees or advisors give any representation or
warranty, express or implied, as to the fairness, accuracy, completeness or correctness of the information,
opinions and conclusions contained in this announcement.
ASX Announcement
Released 5 October 2023
7
Appendix 1 – Drill Collar Positions & Mineralised Intercepts
Hole
Length_m
UTM_East
UTM_North
UTM_Elevation
Azimuth
Dip
23FL-001
56
418403.3
5591981
359
300
60
23FL-002
125
418363.7
5592004.3
360
300
-60
23FL-003
122
418434.4
5591962.6
359
300
-60
23FL-004
44
418391.8
5592037.4
363
300
-60
23FL-005
101
418430.2
5592021.9
361
300
-60
23FL-006
145
418473.8
5591997.4
360
300
-60
23FL-007
50
418337.6
5591959.3
358
300
-60
23FL-008
101
418381.2
5591934.7
359
300
-60
23FL-009
140
418424.7
5591910.2
361
300
-60
23FL-010
41
418416.1
5592069.5
362
300
-60
23FL-011
122
418476.5
5592053.2
362
300
-60
23FL-012
53
418313.1
5591915.7
359
300
-60
23FL-013
101
418356.6
5591891.2
361
300
-60
23FL-014
140
418400.2
5591866.6
362
300
-60
23FL-015
305
418440
5591987.7
356
300
-80
23FL-016
140
418443.8
5591842.1
361
300
-60
23FL-017
41
418350
5591981.1
357
300
-60
23FL-018
86
418393.5
5591956.5
354
300
-60
23FL-020
92
418396.4
5592012.3
355
300
-60
23FL-021
101
418440
5591987.7
356
300
-60
23FL-022
41
418399
5592068.2
361
300
-60
23FL-023
110
418442.5
5592043.7
364
300
-60
23FL-024
77
418347.1
5591925.3
358
300
-60
23FL-025
95
418390.6
5591900.7
358
300
-60
23FL-026
89
418434.4
5591876
362
300
-60
23FL-029
74
418420.4
5592056.1
361
300
-60
23FL-030
50
418397
5592051.9
361
300
-60
23FL-031
53
418360
5592029
362
210
-60
23FL-032
68
418360
5592029
362
300
-60
23FL-033
86
418342
5592034
361
210
-60
23FL-034
83.2
420012.6
5591877
339.03
300
-60
23FL-035
50
419988.1
5591834
341.19
300
-60
23FL-036
152
420056.8
5591853
341.41
300
-60
23FL-037
197
420053.5
5591797
342.45
300
-60
23FL-038
185
419957
5591661
356
300
-55
23FL-039
176
419905
5591680
300
300
-60
23FL-040
176
419977
5591675
412
300
-55
23FL-041
194
419949
5591636
412
300
-55
23FL-042
185
419979
5591713
343
300
-55
23FL-043
185
419995
5591830
340
300
-60
23FL-044
155
42062.69
5591388
388
300
-55
ASX Announcement
Released 5 October 2023
8
Hole
Length_m
UTM_East
UTM_North
UTM_Elevation
Azimuth
Dip
23FL-045
122
420673
5591419
388
300
-55
23FL-046
101
420602
5591344
376
300
-55
23FL-047
116
420698
5591463
392
300
-55
23FL-048
101
420734
5591528
391
300
-55
23FL-049
101
420704
5591648
390
300
-55
23FL-050
98
420737
5591584
389
300
-55
23FL-051
77
420663
5591545
384
300
-55
23FL-052
101
420784
5591562
381
300
-55
23FL-053
101
420430
5591471
383
310
-50
23FL-054
110
420484
5591443
335
310
-50
23FL-055
149
420527
5591468
393
290
-60
23FL-056
152
420474
5591408
379
300
-50
23FL-057
287
420474
5591408
379
310
-80
23FL-058
50
420675
5591531
390
300
-55
23FL-059
89
420675
5591531
390
300
-75
23FL-060
98
420675
5591505
391
300
-55
23FL-061
86
420682
5591505
390
300
-55
23FL-062
92
420688
5591579
388
300
-55
23FL-063
80
420661
5591482
390
300
-55
23FL-064
74
420655
5591458
390
300
-55
23FL-065
95
420696
5591575
389
260
-55
23FL-066
89
420762
5591584
380
270
-55
23FL-067
62
420758
5591589
380
70
-45
Table 2 – Falcon Lake Completed Holes to date - Drill Collar Details. UTM Grid: NAD83_Z16N
ASX Announcement
Released 5 October 2023
9
From_m
To_m
Interval
Li2O_%
23FL-001
Hole
16.65
44.25
27.6
1.36
23FL-002
7.5
16.2
8.7
1.30
23FL-002
62
86
24
0.32
23FL-003
40.18
43.62
3.44
1.09
23FL-004
5.7
27.62
21.92
1.45
23FL-005
46.3
76.05
29.75
0.81
23FL-007
9.05
15.64
6.59
0.33
23FL-007
29
32.52
3.52
1.48
23FL-008
29.8
32.5
2.7
1.00
23FL-008
33.7
34.55
0.85
0.42
23FL-008
39.43
47.28
7.85
0.24
23FL-010
28.75
29.3
0.55
1.34
23FL-014
13.38
14.95
1.57
0.54
23FL-017
14.3
19
4.7
1.00
23FL-017
23.2
29.09
5.89
1.23
23FL-018
3.6
12.25
8.65
2.04
23FL-018
13.75
19.8
6.05
1.23
23FL-018
69.5
80.5
10.55
0.12
23FL-020
22.05
33.5
11.45
1.33
23FL-020
29
33
4
1.93
23FL-021
46.52
48.37
1.85
1.16
23FL-023
56.05
63.21
7.16
1.63
23FL-024
5.4
18.75
13.35
1.50
23FL-024
26.8
30.5
3.7
0.91
23FL-024
37.8
39.6
1.8
0.32
23FL-030
3.7
18.4
14.7
1.50
23FL-031
14.65
46.4
31.75
1.45
23FL-033
53.9
56.54
2.64
1.18
23FL-033
57.03
64.5
7.47
1.02
23FL-034
30.05
32.19
2.14
0.83
23FL-034
32.44
32.89
0.45
1.32
23FL-037
97.45
98.5
1.05
0.14
23FL-037
160.55
161.7
1.15
0.13
23FL-038
112.5
117.95
5.45
0.23
23FL-040
134
139.95
5.95
0.69
23FL-040
141.2
143.75
2.55
0.29
23FL-041
105.25
107.4
2.15
0.72
23FL-041
112.85
116.15
3.3
0.21
23FL-041
118
120.25
2.25
1.95
23FL-041
121.75
122.95
1.2
1.02
ASX Announcement
Released 5 October 2023
10
Hole
From_m
To_m
Interval
Li2O_%
23FL-041
133.8
143.6
9.8
0.14
23FL-044
2.75
4.6
1.85
1.21
23FL-045
17.25
19.45
2.2
0.83
23FL-045
24.7
27.15
2.45
0.61
23FL-047
77.7
83.2
5.5
0.73
23FL-048
38.99
41.92
2.93
1.16
23FL-050
2.5
5.41
2.91
1.03
23FL-053
Results Pending
23FL-054
Results Pending
23FL-055
Results Pending
23FL-056
98.45
100.15
1.7
1.24
23FL-058
11.1
27
15.9
0.95
23FL-059
19.55
47
27.45
0.83
23FL-060
23.85
31
7.15
1.06
23FL-061
11.95
30
18.05
1.02
23FL-063
10.65
17
6.35
1.06
23FL-064
Results Pending
23FL-065
Results Pending
23FL-067
Results Pending
Table 3 – Mineralised Intervals (>0.1% Li2O) and greater than 0.45m. Intervals are down hole length, true width
not known.
ASX Announcement
Released 5 October 2023
11
Appendix 2 – JORC CODE, 2012 EDITION – TABLE 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
Sampling
techniques
JORC Code explanation
Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
Aspects of the determination of
mineralisation that are Material to the Public
Report.
In cases where ‘industry standard’ work has
been done this would be relatively simple
(eg ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation
may be required, such as where there is
coarse gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (eg submarine nodules)
may warrant disclosure of detailed
information.
Drilling
techniques
Drill type (eg core, reverse circulation, openhole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
Method of recording and assessing core and
chip sample recoveries and results
assessed.
Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
Drill sample
recovery
Logging
ASX Announcement
Released 5 October 2023
Commentary
All diamond drill core is NQ
(76mm) in this drilling
program.
Diamond core sample
intervals are logged for
lithology, structural and
geotechnical information,
measured, photographed,
and placed into numbered
trays prior to sampling.
Core has been sampled on
nominal ~1m intervals (0.80
– 1.20m) where possible
unless geological boundaries
dictate otherwise.
Geological boundaries have
not been crossed by sample
intervals.
½ core samples have been
split by core saw, collected,
and submitted for analysis to
AGAT Laboratories along
with regular duplicates,
standards and blanks in line
with QAQC procedures.
The same side of the core is
always sampled in-line with
procedure.
All holes are NQ diamond
drill holes.
A Gyro based system has
been used for both rig
alignment and downhole
measurements on all holes.
All core is depth marked and
oriented to check against
drillers measurements
(blocks), ensuring that all
core loss is considered.
Diamond core recovery is
recorded into the database.
No significant core loss has
been observed to date.
All drill cores have been
geologically logged.
Geological logging is
completed for all holes, and it
12
Criteria
JORC Code explanation
metallurgical studies.
Whether logging is qualitative or quantitative
in nature. Core (or costean, channel, etc)
photography.
The total length and percentage of the
relevant intersections logged.
Subsampling
techniques
and sample
preparation
Quality of
assay data
and
laboratory
tests
Verification
of sampling
and
assaying
If core, whether cut or sawn and whether
quarter, half or all core taken.
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the sampling
is representative of the in situ material
collected, including for instance results for
field duplicate/second-half sampling.
Whether sample sizes are appropriate to the
grain size of the material being sampled.
The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied
and their derivation, etc.
Nature of quality control procedures adopted
(eg standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (ie lack of bias) and
precision have been established.
The verification of significant intersections by
either independent or alternative company
personnel.
The use of twinned holes.
Documentation of primary data, data entry
ASX Announcement
Released 5 October 2023
Commentary
is representative.
The lithology, alteration,
geotechnical and structural
characteristics of drill
samples are logged following
standard procedures and
using standardised
geological codes.
Logging is both qualitative
and quantitative depending
on field being logged.
All drill-holes are logged in
full.
All drill core are digitally
photographed and stored.
All core has been cut and
sampled at the core
processing facility in
Armstrong, Ontario.
NQ core was split by saw in
half, always using the same
half for sampling purposes.
Duplicate sampling is carried
out routinely throughout the
drilling campaign in line with
QAQC procedure. The
laboratory will carry out
routine internal repeat
assays on crushed samples.
Considering the grain size,
half core NQ samples are
believed to be a
representative of the sample.
Samples have been
submitted to AGAT
laboratories.
AGAT is an internationally
certified independent
service provider. Industry
standard assay quality
control techniques will be
used for lithium related
elements.
Samples are submitted for
multi-element ICP analysis
Sodium Peroxide Fusion is
used followed by combined
ICP-OES and ICP-MS
analyses (58 elements).
No verification of sampling
and assaying have been
completed by BM8 to date.
Selected sample results
which are considered to be
13
Criteria
Location of
data points
JORC Code explanation
procedures, data verification, data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Sample
security
Data spacing for reporting of Exploration
Results.
Whether the data spacing and distribution is
sufficient to establish the degree of
geological and grade continuity appropriate
for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications
applied.
Whether sample compositing has been
applied.
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
The measures taken to ensure sample
security.
Audits or
reviews
The results of any audits or reviews of
sampling techniques and data.
Data spacing
and
distribution
Orientation
of data in
relation to
geological
structure
Commentary
significant will be subjected
to resampling by the
company in the future.
The drill hole collar positions
in table 1 have been located
by handheld GPS.
On completion of drilling
program, collar positions will
be located by digital GPS
and reports updated
accordingly.
The grid datum is NAD83
Zone 16N.
Downhole surveys have
been collected every 30m
utilizing gyro tool.
This is a preliminary drilling
campaign and therefore
suitable spacing and
distribution to establish the
degree of geological and
grade continuity appropriate
for the Mineral Resource and
Ore Reserve estimation is
yet to be determined.
Drilling has been in order to
sample across the strike of
the mineralisation, based on
surface mapping and limited
historical drilling. However,
as this drilling is preliminary,
further drilling is required to
determine the orientation of
mineralisation in this area.
At all times samples were in
the custody and control of
the Company’s
representatives until delivery
to the laboratory where
samples are held in a secure
enclosure pending
processing.
No external audit has been
undertaken at this stage.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
Mineral
tenement
JORC Code explanation
Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint
ASX Announcement
Released 5 October 2023
Commentary
All claims relating to the
Falcon Lake Lithium Project
minerals claims are in good
14
Criteria
and land
tenure status
Exploration
done by
other parties
JORC Code explanation
ventures, partnerships, overriding royalties,
native title interests, historical sites,
wilderness or national park and
environmental settings.
The security of the tenure held at the time of
reporting along with any known impediments
to obtaining a licence to operate in the area.
Acknowledgment and appraisal of
exploration by other parties.
Geology
Deposit type, geological setting and style of
mineralisation.
Drill hole
Information
A summary of all information material to the
understanding of the exploration results
including a tabulation of the following
information for all Material drill holes:
o easting and northing of the drill hole
collar
o elevation or RL (Reduced Level –
elevation above sea level in metres) of
the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
ASX Announcement
Released 5 October 2023
Commentary
standing and are 90%
owned by the company.
Please refer to the company
prospectus (dated 2nd Feb
2023) Annexure A, Table
3:1 for full table of Falcon
Lake mineral claims.
No known impediments.
British Canadian Lithium
Mines Ltd (“BCLM”)
completed diamond drill (DD)
holes in 1956. No core or
collars have been located.
Canadian Ore Bodies
completed 3 DD holes in
2010.
Argonaut Resources NL
drilled six holes in 2016.
Core and collars have been
located.
A summary of historical
exploration activities is
included in the Independent
Geologists Report within the
Company’s Prospectus
(dated 2nd Feb 2023)
Annexure A.
The Falcon Lake Project is
underlain by Archean
supracrustal and plutonic
rocks of the Eastern
Wabigoon Sub-province of
the Superior Province along
the northern edge of Lake
Nipigon
The Falcon Lake Pegmatite
Group consists of several
pegmatite dykes that intrude
amphibolitised mafic metavolcanic rocks.
These pegmatites are
spodumene-subtype and are
tantalum-rich.
All drill hole collar locations
and mineralised intercepts
have been reported in this
report for all holes
completed to date.
No relevant data has been
excluded from this report.
15
Criteria
Data
aggregation
methods
Relationship
between
mineralisatio
n widths and
intercept
lengths
Diagrams
Balanced
reporting
Other
substantive
exploration
data
JORC Code explanation
o hole length.
If the exclusion of this information is justified
on the basis that the information is not
Material and this exclusion does not detract
from the understanding of the report, the
Competent Person should clearly explain
why this is the case.
In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (eg cutting of
high grades) and cut-off grades are usually
Material and should be stated.
Where aggregate intercepts incorporate
short lengths of high grade results and
longer lengths of low grade results, the
procedure used for such aggregation should
be stated and some typical examples of
such aggregations should be shown in
detail.
The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
These relationships are particularly
important in the reporting of Exploration
Results.
If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
If it is not known and only the down hole
lengths are reported, there should be a clear
statement to this effect (eg ‘down hole
length, true width not known’).
Appropriate maps and sections (with scales)
and tabulations of intercepts should be
included for any significant discovery being
reported These should include, but not be
limited to a plan view of drill hole collar
locations and appropriate sectional views.
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
Other exploration data, if meaningful and
material, should be reported including (but
not limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples – size and
method of treatment; metallurgical test
results; bulk density, groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
ASX Announcement
Released 5 October 2023
Commentary
Low-cut of 0.1% Li2O has
been applied to reported
intercept assay values.
Intercept grades have been
calculated by weighted
average.
Internal highs have been
calculated by selecting the
relatively higher-grade
internal zone when
compared to the entire
intercept. These zones are
continuous downhole.
No metal equivalent values
are reported.
Only downhole lengths are
reported.
The exact geometry of the
mineralisation is not known
as such true width is not
known.
Appropriate plan views are
included.
All collar and mineralisation
information have been
included for drill holes
completed to date.
All returned assays have
been reported by average
intercept grades.
All previous exploration data
completed to date have
been reported within the
Independent Geologists
Report within the
Company’s Prospectus
(dated 2nd Feb 2023).
No other substantive
exploration data is available
16
Criteria
Further work
JORC Code explanation
substances.
The nature and scale of planned further
work (eg tests for lateral extensions or depth
extensions or large-scale step-out drilling).
Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
ASX Announcement
Released 5 October 2023
Commentary
at this time.
Further work planned at
Falcon Lake Lithium Project
includes exploration drilling,
field mapping, geochemistry,
geophysics and prospecting
works.
Share your feedback
Discover