Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
1
DECEMBER 2025
March 2026
ASX Announcement
Battery Age Minerals Ltd
ASX: BM8
ACN 085 905 997
batteryageminerals.au
T: +61 (8) 9465 1041
E: info@batteryage.au
Level 50, 108 St Georges Terrace
Perth, WA 6000
PO Box 7310, Cloisters Square PO, WA 6850 2
Released 30 April 2026
March 2026 Quarterly Activities Report
Key highlights:
• Bleiberg Maiden Drilling Program
Maiden diamond drilling at the Bleiberg Zinc-Lead-Germanium Project, Austria, confirmed
a mineralised carbonate-hosted system and validated the Company’s geological model in
a globally significant historic district.
• US Germanium-Gallium at Apex
Battery Age materially expanded project footprint through additional claim staking,
consolidating highly prospective ground adjacent to the historic Apex Mine, one of the only
known high-grade germanium–gallium systems in the United States.
• Maiden RC Drilling Program at El Aguila
High‑grade gold–silver mineralisation confirmed at the El Aguila Project, Argentina, with
maiden RC drilling defining strike extensions and confirming continuity of a
low‑sulphidation epithermal system.
• Germanium Technology & NTU Evaluation Licence
BM8 secured an evaluation licence with NTUitive (NTU Singapore) covering six
germanium-related inventions in advanced semiconductor and optoelectronics fabrication,
strengthening downstream specification know-how. In parallel, sustainable processing
pathways including mechanochemical and low-acid leaching methods are under
assessment, positioning BM8 ahead of rising Western demand driven by Chinese export
restrictions on germanium.
Battery Age Minerals Ltd (ASX: BM8, “Battery Age” or “the Company”) presents this
Quarterly Activities Report for the three‑month period ended 31 March 2026 (“Quarter”),
summarising exploration, technical, financial and corporate activities undertaken across the
Company’s project portfolio in Austria, Argentina, the United States and Canada.
During the Quarter, the Company reported results from exploration programs previously
completed at the Bleiberg Zinc–Germanium Project in Austria and the El Aguila Gold–Silver
Project in Santa Cruz Province, Argentina. These results advanced geological understanding
at both projects and provided a technical basis for ongoing interpretation, target refinement
and follow‑up exploration planning. In parallel, the Company continued germanium‑focused
technical evaluation work in collaboration with research institutions, supporting project
assessment and complementing exploration activities across the Bleiberg and Apex projects.
ASX Announcement
Released 30 April 2026 3
Project Activities
Bleiberg Zinc-Germanium Project (Bad Bleiberg, Austria)
Battery Age designed and executed a surface diamond drilling program targeting areas
surrounding the historic Bleiberg–Kreuth zinc-lead–germanium mining district, which was
mined for over 700 years and is recognised for carbonate-hosted, replacement-style sulphide
mineralisation with documented germanium enrichment.
Diamond drilling at the Bleiberg Zinc–Lead–Germanium Project was completed during the
previous Quarter, with results reported during the Quarter ended 31 March 2026.
The drilling program comprised six diamond drill holes for a total of 1,685 metres, testing the
Rubland and Tschöklnock targets within the historic Bleiberg–Kreuth mining corridor (Figure
1), a district recognised for extensive carbonate‑hosted zinc–lead mineralisation with
associated germanium enrichment.
Figure 1: Bleiberg maiden drilling program – drill hole locations
Target Areas Tested - Rubland
The Rubland target forms part of the historic Bleiberg–Kreuth mining district and was subject
to underground exploration and development during the historical operation at the historical
Bleiberg mine.
The 2025 diamond drilling program targeted the northern limb of a regional synclinal structure
beneath and adjacent to areas of historic underground development (Figure 2). Three closely
spaced drill holes were collared to test the geometry, continuity and controls on mineralisation
interpreted from historical data and modern reinterpretation.
ASX Announcement
Released 30 April 2026 4
The drilling intersected structurally controlled sulphide mineralisation within favourable
carbonate stratigraphy (Figure 3), including:
• 2025BBDH_004: 11.0 m @ 0.58% Zn+Pb from 124m
• 2025BBDH_005: 6.5 m @ 1.77% Zn+Pb from 140m
o Incl. 2.5 m @ 3.96% Zn+Pb from 141m
Figure 2: N-S cross section illustrating the geology and structure of the Rubland adit and BM8’s target
ASX Announcement
Released 30 April 2026 5
Figure 3: Shows fault and matrix-controlled sphalerite and galena in hole 25BBDH_005 (141-143.5m) at the
Rubland target.
Target Areas Tested - Tschöklnock
At the Tschöklnock target three diamond drill holes tested the lower limb of a syncline over
approximately 2 km of strike (Figure 1). Drilling intersected folded and fault-bounded carbonate
stratigraphy consistent with the Company’s geological model.
A zinc anomaly was intersected at the Tschöklnock drilling in hole 25BBDH_001, which
penetrated a major structure (Schliewa Fault). The observed anomalism is associated with
moderately to strongly oxidised gossanous and brecciated carbonate rocks as a result of
faulting. At a 0.20% Zn cut off, the anomaly extends over 40m (Figure 4)
The anomalism in 2025BBDH_001 is open at depth. An interval of 6 consecutive metres
(292-298m), near the end of the drill hole were selected for germanium analysis by fusion
method at ALS laboratory, Ireland. Despite the relative low levels of zinc and the high
mobility of germanium in oxidised rocks up to 9 ppm Ge were consistently recorded.
ASX Announcement
Released 30 April 2026 6
Figure 4: Cross section of the Tschöklnock geology and drill target setting including laboratory results from the
first drill hole.
Forward work program
Preparation of the 2026 Bleiberg drilling permit application is underway, incorporating
proposed extensions at Rubland and additional historically referenced target areas west of the
Antoni Shaft and West Shaft from the historic Bleiberg mine.
Engagement with local mining authorities is ongoing in relation to potential re‑entry of historic
adits to support underground geological surveys and sampling.
A site visit is being undertaken during April 2026 to facilitate on‑ground technical review and
engagement with local and European stakeholders relevant to project advancement.
Apex Germanium Gallium Project (Utah, USA)
The Apex Project is located in the Beaver Dam Mountains of south-west Utah, approximately
22 km west of St George and 9 km north of the Arizona border (Figure 5). The project lies
within one of the only known high-grade germanium–gallium systems in the United States.
Mineralisation at the historic Apex Mine is hosted in brecciated and dolomitised Callville
Limestone beneath the Pakoon Dolomite, with mineralisation strongly controlled by the Apex
Fault.
ASX Announcement
Released 30 April 2026 7
Figure 5: Apex project, located in south-west Utah, USA
During the Quarter, the Company staked an additional 51 unpatented lode mining claims,
increasing the Apex Project landholding by approximately 40% (Figure 6). The expanded
tenure consolidates prospective ground immediately surrounding the historic Apex Mine and
captures potential extensions of favourable stratigraphy and structurally controlled mineralised
corridors. Once registered with the Bureau of Land Management, the claims will materially
enhance the Company’s ability to systematically explore the district-scale mineralised system.
Forward work program
Forward work at the Apex Project will focus on advancing target definition through field‑based
geological activities across the expanded claim package. Interpretation of the high‑resolution
WorldView‑3 SWIR and VNIR datasets is ongoing and is being used to refine understanding
of lithological boundaries, alteration patterns and structural controls associated with
germanium–gallium mineralisation.
Planned field activities will focus on areas identified through interpretation of the
high‑resolution WorldView imagery, with priority given to zones of interpreted structural
complexity and favourable stratigraphic settings. Fieldwork will include detailed geological
mapping, structural analysis and surface prospecting to ground‑truth remote sensing
interpretations and assess the distribution of fault‑related breccia zones and prospective
carbonate host units.
Integration of field observations with existing geological datasets will be undertaken to further
refine the geological model and prioritise areas of interest for subsequent exploration phases.
ASX Announcement
Released 30 April 2026 8
Figure 6: Location of the Apex claim blocks, including the newly staked Apex east block comprising of 51
unpatented lode mining claims.
Germanium Technical Evaluation & Processing Studies
During the Quarter, the Company advanced technical evaluation work focused on germanium
material specifications and processing considerations relevant to its germanium‑prospective
projects. This work sits within a broader strategic context: global germanium supply remains
concentrated and is increasingly subject to export restrictions and geopolitical tensions,
reinforcing the importance of Western-aligned sources in markets where germanium is a
critical input including fibre-optic networks, infrared optics, advanced semiconductors and
sensing systems.
As part of this strategy, BM8 secured an evaluation licence with NTUitive, the
commercialisation entity of Nanyang Technological University, Singapore, to evaluate six
germanium-related inventions covering optoelectronic and integration platforms within
ASX Announcement
Released 30 April 2026 9
advanced semiconductor and optoelectronics device fabrication. The evaluation is intended to
strengthen BM8's downstream specification and qualification know-how, an important
capability in markets where purity, consistency and traceability directly influence pricing and
long-term supply contracting.
The technical evaluation program involves material-level, device-level and system-level
review, examining how germanium material properties interact with fabrication processes and
end-use performance requirements. Insights from this work are intended to inform a "spec-to-
process" feedback loop, aligning future resource development and processing strategies with
downstream qualification pathways.
In parallel, the Company continued assessment of lower-impact germanium processing
concepts, including mechanochemical activation approaches and selective low-acid or
organic-acid leaching methodologies aimed at reducing chemical intensity, energy input and
process hazards relative to conventional extraction techniques. This work complements
ongoing exploration activities at the Bleiberg Zinc–Lead–Germanium Project (Austria) and the
Apex Germanium–Gallium Project (USA).
Figure 7: Abstract Graphic Representation of Evaluation Program
University of Sydney Collaboration
During the Quarter, the Company continued technical work in collaboration with the University
of Sydney’s School of Chemical and Biomolecular Engineering, focused on the assessment of
advanced germanium recovery techniques.
The program is evaluating electromagnetic‑based processing methods for germanium
extraction, with the objective of improving understanding of recovery behaviour and process
responses relevant to germanium‑bearing materials. Work undertaken during the Quarter
remained at a technical evaluation stage and focused on laboratory‑scale assessment of
processing concepts.
This research activity complements the Company’s broader germanium‑focused technical
work and ongoing exploration programs by supporting improved understanding of potential
processing pathways applicable to germanium mineralisation at the Bleiberg Zinc–Lead–
ASX Announcement
Released 30 April 2026 10
Germanium Project and the Apex Germanium–Gallium Project, in addition to recovery of Ge
from e-waste.
El Aguila Gold-Silver Project (Santa Cruz, Argentina)
The El Aguila Project (Figure 8) is strategically positioned within a well-established mining
region, bordered by significant producing operations such as Cerro Moro (Pan American
Silver), Cerro Vanguardia (AngloGold Ashanti), and the Don Nicolás mine operated by Cerrado
Gold.
Figure 8: El Aguila Project – located in the rich gold and silver mining region of Santa Cruz. Proximal to large
scale operating Au and Ag mines.
During the Quarter, the Company reported assay results from its maiden reverse circulation
(RC) drilling program at the El Aguila Project in Santa Cruz Province, Argentina. The program
comprised 23 RC drill holes for a total of 2,565 metres, targeting the Aguila Main, Aguila South
and San Cristobal prospects.
Results confirmed widespread shallow gold–silver mineralisation (Figure 9), consistent with a
well‑preserved low‑sulphidation epithermal system. Reported significant intercepts included:
• 10 m @ 17.52 g/t Ag and 0.89 g/t Au from 19 m
o Incl. 1 m @ 44.60 g/t Ag and 2.09 g/t Au from 28 m in EARC25-17
• 1 m @ 203 g/t Ag and 1.56 g/t Au from 83 m in EARC25-03
• 2 m @ 35.8 g/t Ag and 1.22 g/t Au from 12 m in EARC25-03
• 1 m @ 7.90 g/t Ag and 9.92 g/t Au from 59 m in EARC25-04
• 3 m @ 8.03 g/t Ag and 2.6 g/t Au from 75 m in EARC25-09
ASX Announcement
Released 30 April 2026 11
Figure 9: Plan view of the 2025 EL Aguila drilling and drilling highlights.
The RC program reaffirms mineralisation is hosted within veins sitting on multiple cross cutting
faults, within a larger highly prospective corridor.
Clay‑altered andesite and dacitic tuffs, chalcedonic stockwork veining, strong colour
anomalies, and zones of intense alteration highlight hydrothermal fluid pathways developed
along intersecting fault sets.
Forward work program
To date, exploration activities at El Aguila have focused on defining the distribution of relatively
shallow mineralisation and assessing continuity through a combination of infill and step‑out
drilling. Results to date indicate that the mineralisation remains open along strike and at depth.
The Company is now reviewing and integrating all available geological, geochemical, and
geophysical data to refine interpretation of the broader mineralised corridor and prioritise areas
for follow‑up exploration. This integrated review is intended to improve understanding of
structural controls on mineralisation and guide the next phase of technical work.
Forward activities are expected to focus on targeted field‑based evaluation, which may include
geological mapping, structural analysis and surface sampling, together with assessment of the
potential to complete a ground‑based induced polarisation (IP) geophysical survey over priority
ASX Announcement
Released 30 April 2026 12
areas. Any initial field activities would be designed to validate interpretations derived from data
integration and support further refinement of the geological model.
Encouraging results from strike‑extension work have defined favourable structural zones over
approximately 2.7 km at El Aguila Main and 1.5 km at El Aguila South, both of which remain
open. At San Cristobal, the identification of mineralisation in a previously untested area
highlights additional opportunities for systematic field evaluation aimed at expanding the
mineralised footprint across the project.
Falcon Lake Lithium Project (Ontario, Canada)
No exploration activities were conducted during the Quarter.
Jesse Lake Lithium Project (Ontario, Canada)
No exploration activities were conducted during the Quarter.
King Tut Project (Argentina)
No exploration activities were conducted during the Quarter.
Bloom Lake Project (Bloom Lake, Canada)
No exploration activities were conducted during the Quarter.
Corporate
Leadership Transition and Continuity
During the Quarter, the Company confirmed the appointment of Mr Sebastian Kneer as Chief
Executive Officer, effective 2 February 2026. Mr Kneer brings extensive international
exploration and project development experience across multiple commodities and jurisdictions
and has assumed leadership of the Company as it advances exploration, technical evaluation
and project‑level activities across its portfolio.
Business Development
Looking ahead, the Company intends to continue evaluating business development
opportunities aligned with its strategy and complementary to its existing asset base. In addition
to its focus on germanium‑related initiatives, the Company is reviewing projects across a
broader range of commodities and jurisdictions, including under‑explored or overlooked
regions that may offer potential for the discovery of large‑scale, high‑quality mineral resources.
These reviews are expected to focus on geological prospectivity, technical merit and
jurisdictional factors, with the objective of identifying opportunities that could enhance portfolio
quality and long‑term value creation. All such opportunities will remain subject to further
technical, commercial and strategic assessment.
There is no certainty that these forward‑looking reviews or discussions will result in the
acquisition of any additional projects or assets.
Appendix 5B
The Appendix 5B quarterly cashflow report for the Quarter is submitted separately.
ASX Announcement
Released 30 April 2026 13
The Group closed the Quarter with a cash balance of $2,571k. Exploration expenditure during
the Quarter totalled $1,176k (unaudited).
The Company currently holds 34.5m shares in Eminence Minerals Ltd (ASX: EMA) which has
a cash value at the end of the Quarter of: $1.4m at $0.04 per share (share price 31 March
2026).
Payments to Related Parties
Pursuant to section 6 of the Company’s Appendix 5B, and as required under ASX Listing Rule
5.3.5, during the Quarter the Company paid $57k to the Directors for remuneration.
Capital Structure
The capital structure at the end of the Quarter was as follows:
• 221,427,559 Ordinary Shares.
• 34,500,005 Options.
• 2,830,000 Performance Rights.
Interests in Mining Tenements as at 31 March 2026
Location Tenement Reference
Interest during
Quarter
Interest at the end
of Quarter
Western Australia1
M47/1450 - 22.19%
Canada, Bloom Lake 221266, 221267, 229223
243759, 251792, 251793
251794, 287807, 308044
325202, 336173, 582713
582714, 716167, 716168,
716165, 716166, 716170,
716171, 716169
- 100%
Canada, Falcon Lake
- Central
727287 to 727384
668831, 670166, 670168,
721084, 721085, 746214,
754668
2
106057-106058, 121357-
121360, 122094, 132858-
132859, 134102, 136948,
136962, 142489, 148810,
164547-164548, 166603,
178073, 179345, 185376-
185377, 186114-186115,
208573, 209065, 215331,
224637-224639, 237714-
237716, 244810, 246081,
252181, 256393-256395,
274457, 281913, 289275,
291550, 301417-301418,
302155, 311782-311784
-
-
-
100%
100%
90%
- West 881301 - 100%
ASX Announcement
Released 30 April 2026 14
Location Tenement Reference
Interest during
Quarter
Interest at the end
of Quarter
- East 881299, 881300 - 100%
Canada, Jessie Lake 834651 – 834704
835652 - 835724
- 100%
Austria, Bleiberg3
EL 476/22 (BB1) – 591/22
(BB116)
1524/23 (1/23) – 1583/23
(60/23) 1413/24 – 1542/24
(545/24 - 674/24)
-
-
51%
100%
Austria, Hochibir 774/24 (1/24) - 1387/24
(614/24)
1389/24 (615/24) – 1412/24
(638/24)
- 100%
USA, Apex4
UT106756674 –
UT106756808
100% 100%
Argentina5
168-L-1939 - 100%
66-C-2005 - 100%
28-L-2011 - 100%
1. Battery Age’s interest in the Hamersley Iron Ore Project is held indirectly by way of its investment held in Eminence
Minerals Limited. Reduced interest as a result of dilution due to equity placements completed by EMA during the period.
2. The Company may acquire the final 10% of the above identified Falcon Lake tenements by paying an amount equal to
the lower of (i) the price determined by an independent valuation, or (ii) A$2,000,000.
3. The Company may acquire a further 14% interest (total 65%) in the above Bleiberg tenements within 36 months of
acquiring the abovementioned 36% interest by incurring an additional C$3,500,000 in expenditure on the project.
The Company may acquire the final 15% interest (total 80%) in the above Bleiberg tenements within 6.5 years from
executing the Bleiberg Addendum Agreement upon completion of a Bankable Feasibility Study that is compliance to JORC
and indicates the project will have a production rate of at least 100,000 tonnes per year. Refer to Bleiberg earn-in terms
and structure set out in the Company’s Prospectus dated 7 December 2022, and announcement 16 May 2024.
4. As announced on 31 March 2026, BM8 has staked an additional 51 unpatented lode mining claims which are still in
process of being registered with Bureau of Land Management. Above claims represent claims staked in prior quarter and
received registration in the current quarter.
5. As announced on 31 January 2025, the Company has entered into a Farm-In Agreement with Fredonia Mining Inc. to
earn up to 80% to 100% ownership of the El Aguila Project in the Santa Cruz province, Argentina. Refer to announcement
dated 31 January 2025 for full terms and conditions of the Farm-In Agreement.
- END -
Release authorised by the Board of Battery Age Minerals Ltd.
Contacts
Investors / Shareholders
Sebastian Kneer
Chief Executive Officer
P: +61 (0) 8 9465 1041
E: info@batteryage.au
References:
1. Refer to Bleiberg earn-in terms and structure set out in the Company’s Prospectus dated 7 December 2022, and
announcement 16 May 2024.
2. Schroll,e. (2006). Neues zur Genese der Blei-Zink Lagerstätte Bleiberg. Carinthia II 196./116. Jahrgang Seiten 483-500
Klagenfurt 2006
3. Cerny,I. (1991). Lagerstättenforschung in Kärnten Neuergebnisse und Aspekte für die Zukunft. Carinthiall 181./101.
Jahrgang S. 119-129 Klagenfurt 1991, Cerny,I. and Schroll,E. (1995). Spezialmetallgehalte in ZnS-Konzentraten der
Lagerstätte Bleiberg-Kreuth. Arch. f. Lagerst.forsch. Geol. B.-A. ISSN 0253-097X Band 18 S. 5–33 Wien, Juni 1995;
Schroll,e. (2006). Neues zur Genese der Blei-Zink Lagerstätte Bleiberg. Carinthia II 196./116. Jahrgang Seiten 483-500
Klagenfurt 2006
ASX Announcement
Released 30 April 2026 15
4. Germanium-based transistors for future high performance and low ... (2015) TSMC Logic. Available at:
https://research.tsmc.com/page/high-mobility-channel/14.html.
5. Multi-Met (2023) Bleiberg Project - Multi-Met, Multi. Available at: https://multimetdev.com/projects/bleiberg-project/
6. Leach. D, Taylor. R, Fey. D et al.(2010), , A deposit model for Mississippi Valley-Type lead-zinc ores, USGS Scientific
Investigations Report 2010-5070-A
7. Schor, D. (2021) TSMC details 5 nm, WikiChip Fuse. Available at: https://fuse.wikichip.org/news/3398/tsmc-details-5-nm/
(Accessed: 25 February 2024).
Compliance Statement
This report contains information on the Falcon Lake and Jessie Lake Projects extracted from an ASX market announcement dated
8 December 2022, 2 February 2023, 13 June 2023, 4 July 2023, 26 July 2023, 31 July 2023, 2 August 2023, 16 August 2023, 6
September 2023, 14 September 2023, 5 October 2023, 10 October 2023, 16 October 2023, 25 October 2023, 1 November 2023,
30 November 2023, 13 December 2023, 18 April 2024, 8 July 2024, 11 July 2024, 12 August 2024, 12 September 2024, 20
November 2024, 22 January 2025, 28 January 2025 and 14 August 2025 released by the Company and reported in accordance
with the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC
Code).
This report contains information on the Bleiberg and Hochobir Projects extracted from an ASX market announcement dated 8
December 2022, 2 February 2023, 13 July 2023, 21 August 2023, 26 February 2024, 26 March 2024, 23 April 2024, 16 May 2024,
29 August 2024, 18 December 2024, 22 January 2025, 29 January 2025, 17 April 2025, 18 December 2025 and 24 March 2026
released by the Company and reported in accordance with the 2012 edition of the “Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves” (JORC Code). The original market announcement is available to view on
www.batteryage.au and www.asx.com.au. Battery Age is not aware of any new information or data that materially affects the
information included in the original market announcement.
This report contains information on the El Aguila Project extracted from an ASX market announcement dated 31 January 2025, 28
May 2025, 5 September 2025,18 December 2025 and 5 March 2026 released by the Company and reported in accordance with the
2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code).
The original market announcement is available to view on www.batteryage.au and www.asx.com.au. Battery Age is not aware of
any new information or data that materially affects the information included in the original market announcement.
This report contains information on the Apex Project extracted from an ASX market announcement dated 31 October 2025, 6
November 2025 and 31 March 2026 released by the Company and reported in accordance with the 2012 edition of the “Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). The original market announcement
is available to view on www.batteryage.au and www.asx.com.au. Battery Age is not aware of any new information or data that
materially affects the information included in the original market announcement.
Forward Looking Statements
Information included in this release constitutes forward-looking statements. Often, but not always, forward looking statements can
generally be identified by the use of forward looking words such as “may”, “will”, “expect”, “intend”, “plan”, “estimate”, “anticipate”,
“continue”, and “guidance”, or other similar words and may include, without limitation, statements regarding plans, strategies and
objectives of management, anticipated production or construction commencement dates and expected costs or production outputs.
Forward looking statements inherently involve known and unknown risks, uncertainties and other factors that may cause the
Company’s actual results, performance and achievements to differ materially from any future results, performance or achievements.
Relevant factors may include, but are not limited to, changes in commodity prices, foreign exchange fluctuations and general
economic conditions, increased costs and demand for production inputs, the speculative nature of exploration and project
development, including the risks of obtaining necessary licenses and permits and diminishing quantities or grades of reserves,
political and social risks, changes to the regulatory framework within which the company operates or may in the future operate,
environmental conditions including extreme weather conditions, recruitment and retention of personnel, industrial relations issues
and litigation. Forward looking statements are based on the Company and its management’s good faith assumptions relating to the
financial, market, regulatory and other relevant environments that will exist and affect the Company’s business and operations in
the future. The Company does not give any assurance that the assumptions on which forward looking statements are based will
prove to be correct, or that the Company’s business or operations will not be affected in any material manner by these or other
factors not foreseen or foreseeable by the Company or management or beyond the Company’s control. Although the Company
attempts and has attempted to identify factors that would cause actual actions, events or results to differ materially from those
disclosed in forward looking statements, there may be other factors that could cause actual results, performance, achievements or
events not to be as anticipated, estimated or intended, and many events are beyond the reasonable control of the Company.
Accordingly, readers are cautioned not to place undue reliance on forward looking statements. Forward looking statements in these
materials speak only at the date of issue. Subject to any continuing obligations under applicable law or any relevant stock exchange
listing rules, in providing this information the company does not undertake any obligation to publicly update or revise any of the
forward-looking statements or to advise of any change in events, conditions or circumstances on which any such statement is based.
ASX
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
BATTERY AGE MINERALS LTD
ABN Quarter ended (“current quarter”)
80 085 905 997 31 March 2026
Consolidated statement of cash flows Current quarter
$A’000
Year to date (9
months)
$A’000
1. Cash flows from operating activities
- -
1.1 Receipts from customers
1.2 Payments for
(28) (131)
(a) exploration & evaluation
(b) development - -
(c) production - -
(d) staff costs (273) (722)
(e) administration and corporate costs (358) (1,378)
1.3 Dividends received (see note 3) - -
1.4 Interest received 7 7
1.5 Interest and other costs of finance paid - -
1.6 Income taxes paid - -
1.7 Government grants and tax incentives - -
1.8 Other (provide details if material - -
1.9 Net cash from / (used in) operating
activities
(652) (2,224)
2. Cash flows from investing activities
- -
2.1 Payments to acquire or for:
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) exploration & evaluation (1,148) (3,195)
(e) investments - -
(f) other non-current assets - -
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (9
months)
$A’000
2.2 Proceeds from the disposal of:
- -
(a) entities
(b) tenements - -
(c) prop
Share your feedback
Discover