Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
Quarterly
Activities
Report
September 2024
batteryage.au
50/108 St Georges Tce
Perth WA
info@batteryage.au
ASX: BM8
ASX Announcement
Released 28 October 2024
September 2024 Quarterly Activities Report
Significant Exploration Progress at Bleiberg Zinc-Lead-Germanium Project and
Falcon Lake Lithium Discoveries
Key highlights:
•
Bleiberg Project Advances: The Company has identified multiple drill targets over a
6 km strike length at the Bleiberg Project in Austria, based on historical geological data.
These targets are within prospective stratigraphic units that are believed to host
significant mineralisation.
•
Field Campaign and Drilling Permit: The technical team, led by CEO Nigel
Broomham and Chief Geological Advisor Dr. Simon Dorling, is verifying geological data
in the field to refine drill targets. The Company is preparing to submit its maiden drilling
permit for the Bleiberg Zinc-Lead-Germanium Project.
•
Falcon Lake Lithium Discoveries: Initial assays from the 2024 summer drilling
program at the Falcon Lake Lithium Project in Ontario indicate high spodumenebearing pegmatite intercepts, with drill results showing up to 40m thick intersections,
confirming potential for new discoveries.
•
Expanding Mineralisation: The drilling at Falcon Lake shows significant
mineralisation, especially at the Falcon Little Lake target and Falcon East Extension.
The new drilling has expanded the mineralised zones demonstrating the potential for
scale across the 5km prospective corridor.
•
The Company continues to evaluate potential value-adding M&A opportunities in
multiple commodities in Tier-1 jurisdictions globally.
Battery Age Minerals Ltd (ASX: BM8, “Battery Age”, or “the Company”) is pleased to provide
the following summary of activities undertaken during the quarter ending 30 September 2024
(“Quarter”).
Battery Age Minerals Ltd
ASX: BM8
ACN 085 905 997
batteryageminerals.au
T: +61 (8) 6109 6689
E: info@batteryage.au
Level 50, 108 St Georges Terrace
Perth, WA 6000
PO Box 7310, Cloisters Square PO, WA 6850
1
Project Activities
Bleiberg Project (Bad Bleiberg, Austria)
During the Quarter, the Company progressed with the compilation and integration of historical
data over the Bleiberg Project and advanced the prospectivity assessment and targeting
strategy, generating multiple drill targets extending over a 6 km strike length based on historical
datasets.
The historical geological information, as shown in the geological map (Figure 1), highlights the
westwards continuation of the prospective stratigraphic units, modified by faults and thrusts
during the Alpine orogeny. Given the strong stratigraphic control on the distribution of
mineralisation (parallel to certain rock units) the first criteria for targeting is the identification
and confirmation of the target formation.
The historic Bleiberg mining district is known to be located within a graben structure that
preserved much of the mineralisation-hosting stratigraphy. When mining operations were
suspended in the early 1990’s, the underground operations had reached a major fault zone in
the west, that locally terminated the ore system (Figure 1).
However, mapping further west showed that the main mineralisation-bearing horizons were
again within targetable depth or at surface and that these localities were subject to old historic
mining. Battery Age’s technical team was able to confirm during its recent visit, the sites of
several of these very old mining activities (Figure 1, blue mining symbols).
The prospective stratigraphy is preserved within fault-bounded potentially mineralised horizons
which have significant depth extensions. The historic map in Figure 1 shows several targetable
areas, most of which are in excess of 2 km strike length, of prospective stratigraphy and with
proof of historic mining.
Figure 1: Geological map of the area underlying BM8’s Bleiberg project area with outcropping target horizons in
orange; ( indicates the location of the Bleiberg Mining Shafts;
indicates old historic mine workings and adits).
ASX Announcement
Released 28 October 2024
2
Battery Age is currently conducting a field campaign pursuing all the identified target areas for
verification of the geological-structural setting and support for the interpreted prospectivity.
CEO Nigel Broomham and Chief Geological Advisor, Dr Simon Dorling are completing infield
geological works targeted at validating and refining drill targets ahead of submitting the
Company’s maiden drilling permit at the Bleiberg Zinc-Lead-Germanium Project.
The Company’s technical team sees all the geological, mineralogical and stratigraphic
favourable parameters materialised in the west, that made the historic Bleiberg area a worldclass mining district, and plan to establish an Exploration Target as a probable outcome from
its first drilling program.
Figure 2 – Identified mineralised trend located along strike from historical workings. Inset table demonstrates
historical data for the Bleiberg Mine from previous workings 1-7.
Falcon Lake Lithium Project (Ontario, Canada)
During the Quarter, the Company was pleased to announce initial assays from its 2024
summer drilling program at its Falcon Lake Lithium Project in Ontario, Canada. The mineralised
drill intercepts confirm the potential for new discoveries, with spodumene-bearing pegmatite
up to 40m thick, intersected during the maiden drill program at the Falcon Little Lake target
and an expanded strike length at the Falcon East Extension, adding to the mineralisation drilled
in 2023 at Falcon East.
Seven holes have been completed at the Falcon Little Lake pegmatite target, with six holes
intersected significant mineralisation (Refer ASX announcement 12 September 2024). The
three drill holes testing the SSE extension of this target show thickening of the mineralised
body along strike and at depth. The 2023 geophysical survey indicates a magnetic low to the
south, in line with the pegmatite bodies, and enhancing the prospectivity of this southern
extension.
ASX Announcement
Released 28 October 2024
3
The Falcon Little Lake spodumene-bearing pegmatite remains open in all directions, with the
return of high assay values from 6 of 7 holes drilled at the new discovery. The spodumene lobe
drilled in hole 24FL-105, is the deepest and furthest SSE mineralisation drilled on the property
to date and has been targeted at the north end of the magnetic low. Assays increased to the
SSE and at depth with 7.5m of 1.58% Li2O from 121.5m to 129.00m in hole 24FL-105.
Drill Hole
24FL-087
24FL-087
Including
24FL-087
24FL-088
24FL-088
24FL-089
Including
24FL-091
24FL-092
24FL-098
Including
24FL-100
Including
24FL-102
Including
24FL-103
Including
24FL-104
Including
24FL-105
Including
From (m)
39.50
53.90
73.55
88.70
82.15
99.80
148.10
152.00
155.10
28.00
18.95
26.05
55.00
62.00
57.50
70.10
64.55
89.70
71.10
71.10
88.70
121.50
To (m)
46.85
82.15
79.00
112.00
95.90
116.60
159.00
157.70
158.10
30.90
43.85
31.85
73.40
67.00
83.10
82.05
99.25
99.25
93.20
81.10
129.50
129.00
Interval (m)
7.35
28.25
5.45
23.30
13.75
16.80
10.90
5.70
3.00
2.90
24.90
5.80
18.40
5.00
25.60
11.95
34.70
9.55
22.10
10.00
40.80
7.50
Li20 W%
1.38
1.30
2.03
1.13
1.15
0.99
0.97
1.26
1.19
1.25
1.34
1.98
1.88
2.44
0.93
1.32
0.53
1.49
0.80
1.46
0.49
1.58
Table 1 – 2024 Falcon Lake Drilling results. Intervals are down hole length, true width not known.
ASX Announcement
Released 28 October 2024
4
Figure 3 – Falcon Little Lake plan view
The 2024 summer drilling program at the Falcon Lake Lithium Project is targeting several, of
the 30 high-priority pegmatite discoveries identified from the 2023 field program and expands
on the 9,200m of drilling conducted in 2023.
Falcon East
Extension
Falcon
Little Lake
Figure 4 – Plan view of the completed and planned drill hole collars across the Falcon Lake Mineralised corridore
ASX Announcement
Released 28 October 2024
5
Jesse Lake Lithium Project (Ontario, Canada)
No exploration activities were conducted during the Quarter.
Tidili Project (Tidili, Morocco)
No exploration activities were conducted during the Quarter.
King Tut Project (Argentina)
No exploration activities were conducted during the Quarter.
Bloom Lake Project (Bloom Lake, Canada)
No exploration activities were conducted during the Quarter.
Corporate and Finance
Corporate
Battery Age announced on 7 October 2024 a $1.0 million (before costs) placement to
sophisticated investors via the issue of 10,000,000 ordinary shares at $0.10 per share to
advance explorations activities and support working capital expenditure.
Business Development
The Company continues to actively identify and review potential strategic opportunities that
are value accretive and complement existing assets to build a portfolio of highly prospective
projects across a suite of commodities in-line with the Company’s strategic objectives. There
is no certainty that current discussions will result in new project acquisitions.
Appendix 5B and Use of Funds
The Appendix 5B quarterly cashflow report for the Quarter is submitted separately.
The Group closed the Quarter with a cash balance of $427k. Exploration expenditure during
the Quarter totalled $801k (unaudited).
A comparison of the Company’s actual expenditure since readmission to the Official List of
ASX to 30 September 2024 against estimated expenditure in the use of funds statement in the
Prospectus is set out below in accordance with ASX Listing Rule 5.3.4. The table also shows
the Company’s expenditure for the September quarter, as required by ASX Listing Rule 5.3.1:
Tidili Project
Falcon Lake Project
Bloom Lake Project
King Tut Project
Bleiberg Project
Administration and corporate costs
Costs associated of the Public Offer
Working Capital & M&A budget for complementary assets
ASX Announcement
Released 28 October 2024
2023
Prospectus
1,295,000
2,050,000
30,000
100,000
1,215,000
1,328,000
658,000
343,000
Use until
30 Sep 2024
1,318,330
7,186,101
31,769
52,335
373,211
3,363,841
603,094
705,702
Use For Sep
24 Quarter
35,954
625,813
31,769
4,453
65,098
599,113
37,584
7,019,000
13,634,383
1,399,784
6
The material use of funds variance explanations is outlined below:
Note: A capital raise of $6.4m was completed in August 2023 and is outside the Use of Funds
estimate in the prospectus announced on the 2 February 2023.
September Quarter Spend:
•
Falcon Lake Project: Payments relating to exploration drilling, summer field works and
tenement compliance
•
Tidili Project: Payments relating to the close out of the Tidili project
•
Bleiberg Project: Payments relating to recent field trip to Bleiberg, mapping and historical
data interpretation
•
Administration: Payments relating to the Quarter for employee, directors, full year audit
and compliance plus general overhead.
Use of Funds variance Prospectus to Date
•
Operational expenditure on the Falcon Lake project were accelerated due to positive
results from the initial drill program and further expanded with the acquisition of the
Falcon Lake Extension project area in Q4 CY2023. A capital raise was completed in
August 2023 to support further exploration and drilling and this spend is included in the
above table.
•
Administration and corporate costs increased in support of the accelerated and expanded
exploration campaign at Falcon Lake.
•
Working capital includes an acquisition of EQN shares in Q1 CY2024.
•
Ongoing operational and exploration expenditure will be monitored and adjusted in line
with available cash to meet tenement expenditure requirements.
Payments to Related Parties
Pursuant to section 6 of the Company’s Appendix 5B, and as required under ASX Listing Rule
5.3.5, during the Quarter the Company paid $57k to the Directors for remuneration.
Capital Structure
The capital structure at the end of the Quarter is as follows:
•
93,149,140 Ordinary Shares.
•
41,904,923 Options.
•
1,735,000 Performance Rights.
•
7,000,000 Performance Shares.
Annual General Meeting
The Annual General Meeting of the Company will be held on Friday, 29 November 2024.
Further information about the Annual General Meeting, including accessing the Notice of
Meeting and Explanatory Memorandum, will be released to shareholders shortly. The Notice
of Meeting will also be available on the ASX Company’s Announcements Platform and the
Company’s website
ASX Announcement
Released 28 October 2024
7
Attendance at Resources Rising Starts Conference
BM8’s Chief Executive Officer, Mr Nigel Broomham, presented the Company’s strategy for
progressing its critical minerals projects in Canada and Austria at the Resources Rising Stars
Conference held in early September 2024.
Interests in Mining Tenements as at 30 September 2024
Interest during
Quarter
Interest at the end
of Quarter
M47/1450
221266, 221267, 229223
243759, 251792, 251793
251794, 287807, 308044
325202, 336173, 582713
582714, 716167, 716168,
716165, 716166, 716170,
716171, 716169
-
27.97%
100%
727287 to 727384
2668831, 670166, 670168,
721084, 721085, 746214,
754668
3106057-106058, 121357121360, 122094, 132858132859, 134102, 136948,
136962, 142489, 148810,
164547-164548, 166603,
178073, 179345, 185376185377, 186114-186115,
208573, 209065, 215331,
224637-224639, 237714237716, 244810, 246081,
252181, 256393-256395,
274457, 281913, 289275,
291550, 301417-301418,
302155, 311782-311784
727385 – 727406
727409 – 727452
834651 – 834704
835652 - 835724
EP3842355, EP3842356,
ML383699
EL 476/22 (BB1) – 591/22
(BB116)
1524/23 (1/23) – 1583/23
(60/23)
168-L-1939
66-C-2005
28-L-2011
-
100%
-
90%
-
100%
100%
100%
-
85%
-
51%
-
100%
-
100%
100%
100%
Location
Tenement Reference
Western Australia1
Canada, Bloom Lake
Canada, Falcon Lake
- Central
- West
- East
Canada, Jessie Lake
Morocco, Tidili5
Austria, Bleiberg4
Argentina
1.
100%
Battery Age’s interest in the Hamersley Iron Ore Project is held indirectly by way of its investment held in Equinox Resources Limited.
ASX Announcement
Released 28 October 2024
8
2.
3.
4.
5.
In October 2023, the Company acquired a 2 year option, (i) an initial 40% interest by making a cash payment of CAD$100k and
issuing 250k fully paid ordinary shares (completed); (ii) acquisition of an addition 40% interest by making a cash payment of CAD$75k
and issuing 250k fully paid ordinary shares on or before the first anniversary of stage (i) and (iii) acquisition of an addition 10%
interest by making a cash payment of CAD$15k and issuing 250k fully paid ordinary shares on or before the second anniversary of
stage (i). The Company will retain the respective % interest acquired under the respective staged option, in the event that the
subsequent option(s) are not exercised.
The Company may acquire the final 10% of the above identified Falcon Lake tenements by paying an amount equal to the lower of
(i) the price determined by an independent valuation, or (ii) A$2,000,000.
The Company may acquire a further 14% interest (total 65%) in the above Bleiberg tenements within 36 months of acquiring the
abovementioned 36% interest by incurring an additional C$3,500,000 in expenditure on the project.
The Company may acquire the final 15% interest (total 80%) in the above Bleiberg tenements within 6.5 years from executing the
Bleiberg Addendum Agreement upon completion of a Bankable Feasibility Study that is compliance to JORC and indicates the project
will have a production rate of at least 100,000 tonnes per year.
The Company is taking steps to relinquish the Company’s interest in the Tidili Project to the in-country partners.
- END Release authorised by the Board of Battery Age Minerals Ltd.
Contacts
Investors / Shareholders
Nigel Broomham
Chief Executive Officer
P: +61 (0) 8 6109 6689
E: info@batteryage.au
Media
Kelly-Jo Fry
P: +61 (0) 8 6109 6689
E: info@batteryage.au
References:
1.
Schroll,e. (2006). Neues zur Genese der Blei-Zink Lagerstätte Bleiberg. Carinthia II 196./116. Jahrgang Seiten 483-500
Klagenfurt 2006
2.
Cerny,I. (1991). Lagerstättenforschung in Kärnten Neuergebnisse und Aspekte für die Zukunft. Carinthiall 181./101.
Jahrgang S. 119-129 Klagenfurt 1991, Cerny,I. and Schroll,E. (1995). Spezialmetallgehalte in ZnS-Konzentraten der
Lagerstätte Bleiberg-Kreuth. Arch. f. Lagerst.forsch. Geol. B.-A. ISSN 0253-097X Band 18 S. 5–33 Wien, Juni 1995;
Schroll,e. (2006). Neues zur Genese der Blei-Zink Lagerstätte Bleiberg. Carinthia II 196./116. Jahrgang Seiten 483-500
Klagenfurt 2006
3.
Germanium-based transistors for future high performance and low ... (2015) TSMC Logic. Available at:
https://research.tsmc.com/page/high-mobility-channel/14.html.
4.
Multi-Met (2023) Bleiberg Project - Multi-Met, Multi. Available at: https://multimetdev.com/projects/bleiberg-project/
5.
Leach. D, Taylor. R, Fey. D et al.(2010), , A deposit model for Mississippi Valley-Type lead-zinc ores, USGS Scientific
Investigations Report 2010-5070-A
6.
Schor, D. (2021) TSMC details 5 nm, WikiChip Fuse. Available at: https://fuse.wikichip.org/news/3398/tsmc-details-5-nm/
(Accessed: 25 February 2024).
7.
Refer to earn-in terms and structure set out in the Company’s Prospectus dated 7 December 2022, and announcement 16
May 2024.
Compliance Statement
This report contains information on the Falcon Lake and Jessie Lake Projects extracted from an ASX market announcement dated
8 December 2022, 2 February 2023, 13 June 2023, 26 July 2023, 2 August 203, 16 August 2023, 6 September 2023, 14
September 2023, 5 October 2023, 10 October 2023, 16 October 2023, 25 October 2023, 1 November 2023, 30 November 2023,
13 December 2023 18 April 2024, 8 July 2024, 11 July 2024, 12 August 2024 and 12 September 2024 released by the Company
and reported in accordance with the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves” (JORC Code). This report contains information on the Bleiberg Project extracted from an ASX
market announcement dated 8 December 2022, 2 February 2023, 13 July 2023, 21 August 2023, 26 February 2024, 26 March
2024 23 April 2024 and 16 May 2024 released by the Company and reported in accordance with the 2012 edition of the
“Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). The original
market announcements are available to view on www.batteryage.au and www.asx.com.au. Battery Age is not aware of any new
information or data that materially affects the information included in the original market announcement.
ASX Announcement
Released 28 October 2024
9
Forward Looking Statements
Information included in this release constitutes forward-looking statements. Often, but not always, forward looking statements can
generally be identified by the use of forward looking words such as “may”, “will”, “expect”, “intend”, “plan”, “estimate”, “anticipate”,
“continue”, and “guidance”, or other similar words and may include, without limitation, statements regarding plans, strategies and
objectives of management, anticipated production or construction commencement dates and expected costs or production
outputs. Forward looking statements inherently involve known and unknown risks, uncertainties and other factors that may cause
the Company’s actual results, performance and achievements to differ materially from any future results, performance or
achievements. Relevant factors may include, but are not limited to, changes in commodity prices, foreign exchange fluctuations
and general economic conditions, increased costs and demand for production inputs, the speculative nature of exploration and
project development, including the risks of obtaining necessary licenses and permits and diminishing quantities or grades of
reserves, political and social risks, changes to the regulatory framework within which the company operates or may in the future
operate, environmental conditions including extreme weather conditions, recruitment and retention of personnel, industrial
relations issues and litigation. Forward looking statements are based on the Company and its management’s good faith
assumptions relating to the financial, market, regulatory and other relevant environments that will exist and affect the Company’s
business and operations in the future. The Company does not give any assurance that the assumptions on which forward looking
statements are based will prove to be correct, or that the Company’s business or operations will not be affected in any material
manner by these or other factors not foreseen or foreseeable by the Company or management or beyond the Company’s control.
Although the Company attempts and has attempted to identify factors that would cause actual actions, events or results to differ
materially from those disclosed in forward looking statements, there may be other factors that could cause actual results,
performance, achievements or events not to be as anticipated, estimated or intended, and many events are beyond the reasonable
control of the Company. Accordingly, readers are cautioned not to place undue reliance on forward looking statements. Forward
looking statements in these materials speak only at the date of issue. Subject to any continuing obligations under applicable law
or any relevant stock exchange listing rules, in providing this information the company does not undertake any obligation to publicly
update or revise any of the forward-looking statements or to advise of any change in events, conditions or circumstances on which
any such statement is based.
ASX Announcement
Released 28 October 2024
10
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
BATTERY AGE MINERALS LTD
ABN
Quarter ended (“current quarter”)
80 085 905 997
30 September 2024
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date (3
months)
$A’000
-
-
(74)
(74)
(b) development
-
-
(c) production
-
-
(d) staff costs
(212)
(212)
(e) administration and corporate costs
(391)
(391)
(a) exploration & evaluation
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
4
4
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (provide details if material
-
-
1.9
Net cash from / (used in) operating
activities
(673)
(673)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(727)
(727)
(e) investments
-
-
(f)
-
-
(d) exploration & evaluation
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date (3
months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(727)
(727)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
-
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
-
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
-
-
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
1,826
1,826
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(673)
(673)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(727)
(727)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
-
-
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Year to date (3
months)
$A’000
-
-
(427)
(427)
Current quarter
$A’000
Previous quarter
$A’000
5.1
Bank balances
427
1,388
5.2
Call deposits
-
439
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
427
1,827
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
(57)
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
(673)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(727)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
8.4
Cash and cash equivalents at quarter end (item 4.6)
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
$A’000
(1,400)
427
427
0.305
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: The Company will continue to closely monitor its available cash and will adjust
operating, and exploration expenditure as required.
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: As announced on 7 October 2024 the Company has raised $1m before costs
through a placement to sophisticated investors. The company will continue to monitor costs
and future funding requirements to continue with planned explorations and operations
activities.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: Yes, the Company expects to continue its operations and exploration activities to
meet tenement requirements and will review and adjust according to its available
funding.
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
28 October 2024
Authorised by: The Board of Battery Age Minerals Ltd
(Name of body or officer authorising release – see note 4)
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and