Field Work Commenced at El Aguila High Grade Gold Project
Released
Released
Announcement PDF
ASX Announcement
Released 26 March 2025
Field Work Commenced at El Aguila High
Grade Gold and Silver Project
HIGHLIGHTS
•
Land Access Agreements Secured – 12-month land access agreements executed with
both landholders, enabling exploration access across the El Aguila Gold-Silver Project.
•
Exploration and EIA Field Work Underway – On-ground activities, including geological
mapping, prospecting and baseline environmental studies, have commenced in
preparation for the Company’s maiden drill program.
•
High-Grade Gold and Silver Confirmed – Over 100 high-grade surface samples have
been identified over the Project area, with outstanding gold and silver assays returned,
including:
•
•
44.20 g/t Au and 4,739 g/t Ag (Aguilia Main #110);
33.76 g/t Au and 7 g/t Ag (Aguilia Main #102899);
12.74 g/t Au and 2,301 g/t Ag (Aguilia Main #572);
11.98 g/t Au and 2,153 g/t Ag (Aguilia Main #102896);
174.58 g/t Au and 327 g/t Ag (Aguilia South #103036);
44.59 g/t Au and 361 g/t Ag (Aguilia South #103067);
30.36 g/t Au and 123 g/t Ag (Aguilia South #103068);
55.87 g/t Au and 61 g/t Ag (Aguilia South #103041);
Drilling Intercepts Support Near-Surface Potential – Previous drilling includes
standout Au and Ag intersections, highlighting the opportunity for shallow, high-grade
discoveries, including:
DDA-08: from 48.68m, 0.55m @ 40.55 g/t Au; 107 g/t Ag
DDA-25: from 42.35m, 7.00m @ 2.48 g/t Au, including 1.7m @ 9.02 g/t Au
DDA-34: from 16.50m, 3.00m @ 5.97 g/t Au
DDA-42: from 299.38m, 2.87m @ 5.93 g/t Au
CRC-01: from 92m, 22m @ 0.94 g/t Au, including 2m @ 3.14 g/t Au; 62 g/t Ag
Strong Local Support and Government Engagement – CEO Nigel Broomham
recently visited the project site alongside the geology team and was welcomed by Santa
Cruz Secretary of Mining, Nadia Ricci, reinforcing the importance of positive government
support as the project advances toward drilling.
Battery Age Minerals Ltd
ASX: BM8
ACN 085 905 997
batteryageminerals.au
T: +61 (8) 6109 6689
E: info@batteryage.au
Level 50, 108 St Georges Terrace
Perth, WA 6000
PO Box 7310, Cloisters Square Po, WA 6850
1
Battery Age Minerals Ltd (ASX: BM8) (“Battery Age” or “the Company”) is pleased to advise
that it has executed land access agreements with the two local landholders covering the El
Aguila Gold and Silver Project in Santa Cruz Province, Argentina.
The agreements, which are valid through to the end of March 2026, provide the Company with
full access to conduct planned exploration activities, including geophysics, surface sampling,
and maiden drilling programs across key target areas within the 9,124-hectare project footprint.
Importantly, this milestone enables the Company to immediately advance on-ground activities,
with exploration fieldwork and prospecting currently underway. These early-stage activities are
designed to refine high-priority drill targets ahead of the Company’s maiden drilling campaign.
Figure 1: Nadia Ricci, Santa Cruz Provincial Secretariat of Mining with BM8 CEO, Nigel Broomham
Battery Age’s CEO, Nigel Broomham, recently visited the El Aguila site with members of the
Company’s exploration geology team to oversee the commencement of activities. During the
visit, Mr Broomham was privileged to be welcomed by the Secretary of Mining for Santa Cruz
Province, Nadia Ricci, as Battery Age progresses preparations for its maiden drilling
application.
ASX Announcement
Released 26 March 2025
2
Figure 2: Geologists walking the kilometre scale surface expression of the Fresia target - Aguila South prospect.
El Aguila – A Proven High-Grade Gold-Silver District
The El Aguila Project is strategically located within an established mining jurisdiction,
surrounded by multiple producing gold-silver operations and supported by excellent regional
infrastructure. Historical exploration results confirm the presence of high-grade mineralisation,
with substantial upside potential from underexplored and untested targets across the 9,124hectare landholding.
Figure 3: Battery Age Minerals, Argentinian Gold and Silver Projects
ASX Announcement
Released 26 March 2025
3
Figure 4: El Aguila – located in the rich gold and silver mining region of Santa Cruz. Proximal to large scale
operating Au and Ag mines.
More than 100 high-grade surface samples have been recorded to date, with exceptional
assays returning up to 174.58 g/t Au and 4,739 g/t Ag, extending on kilometre scale,
underscoring the district’s potential to host large-scale, high-grade epithermal systems. Refer
1: ASX announcement 31 January 2025
Table 1: Assay highlights of the surface sampling completed at the El Aguila Property.
ASX Announcement
Released 26 March 2025
4
Figure 5: Aguila South target –Surface Sampling, rock chips and grab samples
Drilling to date has returned multiple high-grade intersections, including:
•
0.55m @ 40.55 g/t Au and 107 g/t Ag (Hole DDA-08), and
•
7.00m @ 2.48 g/t Au, including 1.7m @ 9.02 g/t Au and 51 g/t Ag (Hole DDA-25)
•
3.00m @ 5.97 g/t Au (DDA-34)
•
22.00m @ 0.94 g/t Au (CRC-01)
These results demonstrate the potential for near-surface high-grade mineralisation, with the
majority of previous drilling restricted to depths shallower than 100 metres. Additionally, nine
high-priority targets remain untested, presenting meaningful exploration upside.
Battery Age is well-positioned to unlock the full potential of El Aguila through a systematic and
technically driven exploration program aimed at delineating and expanding high-grade zones
across the project area.
ASX Announcement
Released 26 March 2025
5
Table 2: Assay highlights of the drilling completed at the El Aguila Property
Battery Age CEO, Nigel Broomham, commented:
“Securing land access for the El Aguila Project represents a major step forward in unlocking
the value of this highly prospective asset. These agreements give our team the certainty
required to execute meaningful exploration activity, including our planned maiden drilling
program.
I would like to express my sincere thanks to our local landholders for their support and
cooperation, which has been instrumental in progressing this important stage of the project. I’d
also like to acknowledge our team for their efforts in establishing strong, respectful
relationships with the local community.
It was an honour to be welcomed onsite by Secretary of Mining, Nadia Ricci, and we look
forward to working closely with the provincial authorities and local stakeholders as we move
toward submitting our maiden drilling application and advancing El Aguila as a key growth
asset in our portfolio.”
References
1.
Refer ASX announcement 31 January 2025, BM8 to Acquire High-Grade Gold & Silver Project
in Argentina.
2.
CEIC Date, February 2025, https://www.ceicdata.com/en/indicator/argentina/gold-production
[ENDS]
Release authorised by the Board of Battery Age Minerals Ltd.
ASX Announcement
Released 26 March 2025
6
Contacts
Investors / Shareholders
Media
Nigel Broomham
Kelly-Jo Fry
Chief Executive Officer
Battery Age Minerals
P: +61 (0)8 6109 6689
P: +61 (0)8 6109 6689
E: info@batteryage.au
E: kjfry@batteryage.au
Compliance Statement
This report contains information on the El Aguila Project extracted from an ASX market announcement dated 31
January 2025 released by the Company and reported in accordance with the 2012 edition of the “Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). The original market
announcement is available to view on www.batteryage.au and www.asx.com.au. Battery Age is not aware of any
new information or data that materially affects the information included in the original market announcement.
Forward-Looking Statement
This announcement may contain certain forward-looking statements and projections. Such forward looking
statements/projections are estimates for discussion purposes only and should not be relied upon. Forward looking
statements/projections are inherently uncertain and may therefore differ materially from results ultimately achieved.
Battery Age Minerals Limited does not make any representations and provides no warranties concerning the
accuracy of the projections and disclaims any obligation to update or revise any forward-looking statements/projects
based on new information, future events or otherwise except to the extent required by applicable laws. While the
information contained in this report has been prepared in good faith, neither Battery Age Minerals Limited or any of
its directors, officers, agents, employees or advisors give any representation or warranty, express or implied, as to
the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this
announcement.
ASX Announcement
Released 26 March 2025
7
Share your feedback
Discover