Geophysics & Surface Geochemistry Commence at El Aguila
Released
Released
Announcement PDF
ASX Announcement
Released 30 April 2025
Geophysics and Surface Geochemistry
Programs Commence at El Aguila Gold and
Silver Project, Argentina
HIGHLIGHTS
•
Geophysical and Geochemistry Surveys Commenced – Field teams mobilised to
undertake ground magnetic surveys, gradient IP surveys, and surface geochemistry
programs across the El Aguila Gold-Silver Project.
•
Target Refinement Underway – Integrated exploration approach designed to enhance
geological understanding and refine high-priority drill targets ahead of maiden drilling.
•
EIA Survey Completed – Biology and archaeology field surveys for the Environmental
Impact Assessment (EIA) are complete; EIA submission planned with maiden drilling
application by the end of the current quarter.
•
Drilling Planned for Q3 2025 – Battery Age anticipates commencing its maiden drilling
campaign in Q3 of the 2025 calendar year, pending permit approvals.
•
Exceptional High-Grade Results – Surface sampling highlights include 174.58g/t Au and
327g/t Ag (Aguila South, Sample #103036) and 44.20g/t Au and 4,739g/t Ag (Aguila
Main, Sample #110). Key drilling intersections include 0.55m @ 40.55g/t Au (DDA-08),
7.00m @ 2.48g/t Au (DDA-25), and 3.00m @ 5.97g/t Au (DDA-34).
•
Strong Local and Government Support – Ongoing engagement with local stakeholders
and Santa Cruz government authorities continues to support project advancement.
Battery Age Minerals Ltd (ASX: BM8) (“Battery Age” or “the Company”) is pleased to
announce the commencement of comprehensive geophysical and surface geochemistry
surveys at its highly prospective El Aguila Gold-Silver Project, located in Santa Cruz Province,
Argentina.
Field programs are now well underway, comprising detailed ground magnetic surveys and
gradient Induced Polarisation (IP) surveys, supported by systematic soil sampling. This
integrated program is designed to generate a high-resolution geophysical and geochemical
dataset to refine high-priority targets ahead of the Company’s maiden drilling campaign.
In parallel, key milestones toward drilling have also been achieved, with biological and
archaeological surveys for the Environmental Impact Assessment (EIA) now complete.
Battery Age expects to submit the EIA, together with its maiden drilling application, by the
end of the current quarter. Subject to regulatory approvals, maiden drilling is anticipated to
commence in Q3 of calendar year 2025.
Battery Age Minerals Ltd
ASX: BM8
ACN 085 905 997
batteryageminerals.au
T: +61 (8) 6109 6689
E: info@batteryage.au
Level 50, 108 St Georges Terrace
Perth, WA 6000
PO Box 7310, Cloisters Square Po, WA 6850
1
Figure 1: Geophysical and surface geochemistry survey planned areas
Battery Age CEO, Nigel Broomham, commented:
“Our team continues to execute our exploration strategy systematically and efficiently at El
Aguila. Completing the EIA field surveys and commencing geophysical and geochemical
programs puts us firmly on track to lodge our maiden drilling application by quarter-end. We
are particularly excited to integrate the results of the ground magnetics and gradient IP
surveys, which are expected to significantly enhance the targeting of high-grade structures
ahead of drilling. With strong local and government support, we are well positioned to unlock
the true potential of this exceptional project.”
The El Aguila Project is underpinned by a strong technical foundation, with historical
exploration returning outstanding high-grade gold and silver results, including below drilling
intercepts:
•
0.55m @ 40.55g/t Au and 107g/t Ag (DDA-08)
•
7.00m @ 2.48g/t Au, including 1.7m @ 9.02g/t Au (DDA-25)
•
3.00m @ 5.97g/t Au (DDA-34)
•
22.00m @ 0.94g/t Au, including 2m @ 3.14g/t Au (CRC-01)
ASX Announcement
Released 30 April 2025
2
Table 1: Assay highlights of the drilling completed at the El Aguila Property
These results, combined with over 100 high-grade surface samples (up to 174.58g/t Au and
4,739g/t Ag), highlight the substantial exploration upside across the project’s 9,124-hectare
landholding.
Table 2: Assay highlights of the surface sampling completed at the El Aguila Property.
Historical results confirm the potential for extensive near-surface high-grade mineralisation at
El Aguila, with the majority of previous drilling restricted to shallow depths of less than 100
metres. Importantly, nine high-priority, kilometre-scale target areas remain untested,
representing substantial opportunities for new discoveries across the 9,124-hectare project.
Battery Age is exceptionally well-positioned to unlock the full potential of El Aguila through a
systematic and technically driven exploration strategy, focused on delineating and expanding
high-grade gold and silver zones across this highly prospective, underexplored tenure.
ASX Announcement
Released 30 April 2025
3
Figure 2: Ground Magnetic survey team at El Aguila
Figure 3: Battery Age Minerals, Argentinian Gold and Silver Projects
ASX Announcement
Released 30 April 2025
4
References
1.
Refer ASX announcement 31 January 2025, BM8 to Acquire High-Grade Gold & Silver Project
in Argentina.
2.
CEIC Date, February 2025, https://www.ceicdata.com/en/indicator/argentina/gold-production
[ENDS]
Release authorised by the Board of Battery Age Minerals Ltd.
Contacts
Investors / Shareholders
Media
Nigel Broomham
Kelly-Jo Fry
Chief Executive Officer
Battery Age Minerals
P: +61 (0)8 6109 6689
P: +61 (0)8 6109 6689
E: info@batteryage.au
E: kjfry@batteryage.au
Compliance Statement
This report contains information on the El Aguila Project extracted from an ASX market announcement dated 31
January 2025 released by the Company and reported in accordance with the 2012 edition of the “Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). The original market
announcement is available to view on www.batteryage.au and www.asx.com.au. Battery Age is not aware of any
new information or data that materially affects the information included in the original market announcement.
Forward-Looking Statement
This announcement may contain certain forward-looking statements and projections. Such forward looking
statements/projections are estimates for discussion purposes only and should not be relied upon. Forward looking
statements/projections are inherently uncertain and may therefore differ materially from results ultimately achieved.
Battery Age Minerals Limited does not make any representations and provides no warranties concerning the
accuracy of the projections and disclaims any obligation to update or revise any forward-looking statements/projects
based on new information, future events or otherwise except to the extent required by applicable laws. While the
information contained in this report has been prepared in good faith, neither Battery Age Minerals Limited or any of
its directors, officers, agents, employees or advisors give any representation or warranty, express or implied, as to
the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this
announcement.
ASX Announcement
Released 30 April 2025
5
Share your feedback
Discover