BM8 to Acquire High-Grade Gold & Silver Project in Argentina
Released
Released
Announcement PDF
ASX Announcement
Released 31 January 2025
Battery Age to Acquire Majority Interest in
High-Grade El Aguila Gold & Silver Project
in Argentina
HIGHLIGHTS
•
Farm-in Agreement Secured: Battery Age Minerals has executed a Farm-In
Agreement with Fredonia Mining Inc. to earn up to 80% to 100% ownership of the El
Aguila project in the Santa Cruz province, Argentina.
•
Strategic Location: The El Aguila project spans 9,124 hectares in a highly productive
mining region of Santa Cruz, Argentina, which accounted for 680,000 ounces of gold
and 15,227,000 ounces of silver in 20231, making it Argentina's leading province
for mining exports.
•
Geological Potential: The project is situated in a geologically favourable "failed
caldera" environment, with structures hosting low-sulfidation epithermal quartz veins,
stockwork, breccias, and veins in sandstone, indicative of significant gold and silver
mineralisation.
•
High-Grade Samples: Over 100 high-grade surface samples have been identified,
including exceptional grades up to 174.58 g/t Au and 4,739 g/t Ag, demonstrating the
potential for large-scale, high-grade mineralisation across the project.
•
Exploration Upside: Drilling results to date include high-grade intersections such as
0.55m at 40.55 g/t Au and 107 g/t Ag in DDA-08, and 7.00m at 2.48 g/t Au, including
1.7m at 9.02 g/t Au in DDA-25. These results highlight significant potential for highgrade mineralisation near surface, with minimal previous exploration below 100 meters
and nine unexplored targets suggesting further upside in the region. BM8 is wellpositioned to unlock the full potential of the asset and methodically test the significant
mineralisation that remains largely untested.
•
Expanding a Portfolio of High-Quality Mineral Assets: Battery Age continues to
strengthen its portfolio of high-quality mineral projects with the acquisition of the El
Aguila Project. This highly prospective gold-silver project strategically complements
BM8’s existing assets, including the Falcon Lake Lithium Project in Canada and the
Bleiberg Germanium Project in Austria, further enhancing the company’s diversified
exploration portfolio.
•
Equity Raising: Contemporaneous with the transaction, Battery Age is conducting a
capital raising as referred to in today’s Trading Halt announcement, for which a
subsequent announcement will be made to remove the halt on the Company’s
securities.
Battery Age Minerals Ltd
ASX: BM8
ACN 085 905 997
batteryageminerals.au
T: +61 (8) 6109 6689
E: info@batteryage.au
Level 50, 108 St Georges Terrace
Perth, WA 6000
PO Box 7310, Cloisters Square Po, WA 6850
1
Battery Age Minerals Ltd (ASX: BM8; “Battery Age” or “the Company”) is pleased to
announce that it has executed a Farm-in Agreement (“Agreement”) with Fredonia Mining Inc.
to earn up to 80% with an option to increase its holding to 100% of the El Aguila project in the
Santa Cruz province in Argentina.
The property is located in the Santa Cruz Province and comprises of three licence blocks that
cover 9,124ha (91km2). The province of Santa Cruz is a Gold and Silver rich mining region,
producing 680,000 ounces of gold and 15,227,000 ounces of silver in 20231. Mineral
exports represent 80% of the province's total exports and at the national level, it is the No. 1
State for mining exports (almost 42% of the country's total).1 The El Aguila project itself
is located adjacent to 5 operating Au/Ag mines (Figure 1).
This location offers significant advantages for exploration. The project lies in a relatively flat
terrain, making it easily accessible compared to more mountainous areas. The excellent
physical access to the site enables efficient exploration activities and reduces logistical
challenges. Additionally, the region has a well-established mining infrastructure and is home
to a skilled workforce, ensuring easy access to both people and expertise. The presence of
operating mines in the area further supports the availability of experienced contractors, local
services, and a network of professionals with in-depth knowledge of the region’s geology, all
of which will be valuable as the Company moves forward with its exploration efforts. This
combination of favourable topography, infrastructure, and expertise makes Santa Cruz an ideal
location for pursuing exploration and development activities.
Figure 1: El Aguila – located in the rich gold and silver mining region of Santa Cruz. Proximal to large scale operating
Au and Ag mines.
Kilometre scale mineralised vein networks containing high grade gold and silver are mapped
on surface and extend across the property. Over 100+ high-grade surface samples have been
recorded over the main target areas including: 174.58 g/t Au, 56.58 g/t Au, 44.22 g/t Au, 4739
g/t Ag, 2301 g/t Ag, 1421 g/t Ag (Table 1, Figure 4). Verification samples to confirm the
presence and tenor of the mineralisation were taken during a due diligence site visit by Battery
Age (Table 2, Figure 5). The results confirmed high-grade mineralisation and included: 73.7
g/t Au, 47.5 g/t Au, 44.4 g/t Au, 1,465 g/t Ag, 1005 g/t Ag, 399 g/t Ag (Table 2).
ASX Announcement
Released 31 January 2025
2
The Company believes the project presents the potential for large scale and high grades
across the target zones.
The geological interpretation of the El Aguila project area is that of a ‘failed’ volcanic caldera
environment. Structures representing both ring fractures at the margins of the caldera as well
as radial fractures hosting gold silver mineralisation within the ring structure. The NW
orientation is strike-slip faults with dextral movements, and N-S fractures are tensional. A postmineral event that led to ENE-striking fault systems which cross-cuts and displace the older
mineralised structures. Sinter, found at the surface at the Verbena target and at depth in the
drill core at the Aguila Main target, indicate both deepening to the NW of the mineralisation
and preservation of the low sulphidation system and mineralisation.
Figure 2: El Aguila project geology. Kilometre scale interpreted mineralised veins outlined in red.
El Aguila features several distinct mineralisation styles, primarily classic low-sulphidation
epithermal quartz veins hosting gold and silver, as well as stockworks and breccias around a
felsic dome complex. Additionally, a recently discovered exploration target, Verbena, is
characterised by veins in sandstone (Figure 2). These mineralisation styles have been
validated by the Company through site visits, verification sampling, and are supported by
technical descriptions in academic papers and reports.
Figure 3: A. Sinter clast preserved at depth in Aquila Main. B. Sinter in outcrop at the Verbena target.
ASX Announcement
Released 31 January 2025
3
Target Sample # Au g/t
Aguila Main
110
44.20
Aguila Main 102889
33.76
Aguila Main 102837
30.52
Aguila Main 102931
20.42
Aguila Main 103016
16.34
Aguila Main 102899
15.61
Aguila Main 102944
14.84
Aguila Main
572
12.74
Aguila Main 102932
12.56
Aguila Main 102896
11.98
Aguila Main
575
9.16
Aguila Main 102895
7.55
Aguila Main 102873
7.07
Aguila Main 102862
6.49
Aguila Main
578
5.52
Aguila Main 102812
4.25
Aguila Main 102894
3.10
Aguila Main 102902
2.89
Aguila Main 102898
2.57
Aguila Main 102904
2.54
Aguila Main 102811
2.38
Aguila Main 102905
2.09
Ag g/t
4739
7
196
8
166
2908
29
2301
6
2153
1421
1246
143
543
9
219
414
264
238
563
154
388
Target
Sample # Au g/t
Aguila South 103036 174.58
Aguila South 103041 55.87
Aguila South 103067 44.59
Aguila South 103068 30.36
Aguila South 103077 29.21
Aguila South 103045 25.38
Aguila South 103038 22.69
Aguila South 103069 19.71
Aguila South 103033 16.99
Aguila South 103037 16.76
Aguila South 103251 14.39
Aguila South 103040 13.83
Aguila South
2
13.81
Aguila South 103031 12.65
Aguila South 103055 10.10
Aguila South 103043 10.06
Aguila South
1
5.19
Aguila South 103114
4.78
Aguila South 103050
0.60
Ag g/t
327
61
361
123
71
26
7
0
20
1
13
7
3
3
7
0.1
0.9
352
107
Table 1: Assay highlights of the rock chip sampling completed at the El Aguila Property.
Figure 4: Aguila South –Surface Sampling, rock chips and grab samples
ASX Announcement
Released 31 January 2025
4
Target
Aguila Main
Aguila Main
Aguila Main
Aguila Main
Aguila Main
Aguila Main
Aguila Main
Aguila Main
Aguila Main
Aguila Main
Aguila Main
Aguila Main
Aguila Main
Aguila Main
Aguila Main
Sample # Au g/t
Ag g/t
239588
239552
239553
239580
239554
239584
239583
239587
239551
239578
239579
239586
239585
239582
239581
27.8
280
5.5
1465
47.5
13.05
9.43
9.17
6.16
4.35
3.79
3.55
2.67
2.58
2.26
2.26
1.96
1.89
1.51
64.1
28.8
1005
36.1
399
334
122
58.8
236
243
358
Target
Aguila South
Aguila South
Aguila South
Aguila South
Aguila South
Aguila South
Aguila South
Aguila South
Aguila South
Aguila South
Aguila South
Aguila South
Sample # Au g/t
Ag g/t
239558
239557
239563
239562
239560
239567
239555
239556
239559
239568
239564
239565
9.9
7.3
105
0.5
0.9
1
0.9
1.9
0.6
73.7
44.4
14
10.9
6.46
4.9
3.36
3.34
3.17
1.465
1.23
1.055
56
1.5
2.8
Table 2: Verification surface sampling completed by BM8 at the El Aguila Property during the due diligence.
Figure 5: Verification surface sampling completed by BM8 at the El Aguila Property during the due diligence
ASX Announcement
Released 31 January 2025
5
Preliminary trenching, channel sampling and drilling have been conducted on the property by
past operators Coeur Argentina S.R.L (2006) and Mariana Resources Ltd (2012) and by the
vendor, Fredonia Mining Inc. in 2017. The results of each program display significant upside.
Each successive program expanded the limits of known mineralisation and confirmed the
presence of both high-grade silver and gold mineralisation. Highlights of these programs
include significant mineralisation presented below across substantial widths.
Mechanised trenching and channel sampling program completed over the Aquila Main
returned high-grade gold and silver near the surface. These samples confirmed the high-grade
tenor and length of the mineralisation. Results including Trenches- 11.0m of 3.35 g/t Au and
29 g/t Ag, 14.0m of 2.06 g/t Au, 6 g/t Ag including 5.15m 2.80 g/t Au and 530 g/t Ag (Table 2).
Channel Samples highlights include: 2.47m of 3.8 g/t Au, 0.77m of 14.41 g/t Au and 1.05m of
5 g/t Au (Table 3). The mineralised veins typically exhibit weakly banded or brecciated textures,
with alternating layers of quartz, trace adularia. Quartz in these veins is commonly fine-grained
grey chalcedony with coarser crystalline quartz as a later phase.
Trench #
AM01
T02
T07
T01
Target
Aquila Main
Aquila Main
Aquila Main
Aquila Main
Aquila Main
Aquila Main
Aquila Main
Including
Aquila Main
Aquila Main
Aquila Main
Aquila Main
Including
Aquila Main
Aquila Main
From (m)
0.00
10.00
16.00
138.00
46.30
63.70
87.65
87.65
205.70
249.40
259.80
75.00
87.00
66.50
83.80
To (m)
2.00
12.00
27.00
140.00
52.00
64.50
92.80
90.80
209.40
252.40
263.40
89.00
89.00
68.15
85.00
Width (m)
2.00
2.00
11.00
2.00
2.70
0.80
5.15
3.15
3.70
2.00
3.60
14.00
2.00
1.65
1.20
Au g/t
7.93
2.19
3.35
2.40
1.11
1.20
2.80
3.87
0.67
0.60
2.07
2.06
9.60
1.84
1.60
Ag g/t
38
3
29
41
13
1
530
863
68
37
4
6
3
5
4
Table 3: Assay highlights of the trenching completed at the El Aguila Property.
ASX Announcement
Released 31 January 2025
6
Chip Sample line
CH01
CH02
CH03
CH05
CH08A
CH09A
CH11
CH14
CH24A
CH25
CH34A
CH34B
CH34C
CH35
CH36A
CH36B
CH36C
CH40
CH46
CH56A
Target
Aquila South
Aquila South
Aquila South
Aquila South
Aquila South
Aquila South
Aquila South
Aquila South
Aquila South
Aquila South
Aquila South
Aquila South
Aquila South
Aquila South
Aquila South
Aquila South
Aquila South
Aquila South
Aquila South
Aquila South
Aquila South
Aquila South
From (m) To (m)
0
1
0
0.83
1.2
2.55
0.6
1.9
1
1.9
0.82
1.2
0
0.75
0.75
1.2
0.43
0.68
0.7
1.1
0
0.45
0
0.77
0
0.45
0
2.9
0
2.47
0
0.5
0
1.05
0
1.4
0
0.6
1.28
2.78
0
0.8
0.8
2.6
Width (m)
1
0.83
1.35
1.3
0.9
0.38
0.75
0.45
0.25
0.4
0.45
0.77
0.45
1.7
2.47
0.5
1.05
1.4
0.6
1.5
0.8
1.8
Au g/t
4.39
3.40
4.21
2.70
2.02
3.35
2.58
17.33
0.59
0.98
0.72
14.41
2.71
2.13
3.80
18.54
5.00
4.93
1.63
6.45
0.16
0.41
Ag g/t
2
2
5
2
3
8
2
2
383
86
68
4
3
2
10
8
2
2
20
6
43
121
Table 4: Assay highlights of the channel sampling completed at the El Aguila Property.
Three drilling campaigns have been completed on the property, consisting of 62 drill holes for
a total of 8,009 meters. The drilling to date has primarily focused on high-grade surface
expressions, with limited exploration below 100 meters, where depth extensions remain largely
unexplored. Key drilling results include:
•
DDA-08: from 48.68m, 0.55m @ 40.55 g/t Au; 107 g/t Ag
•
DDA-25: from 42.35m, 7.00m @ 2.48 g/t Au, including 1.7m @ 9.02 g/t Au; 51 g/t Ag
•
DDA-42: from 299.38m, 2.87m @ 5.93 g/t Au
•
CRC-01: from 92m, 22m @ 0.94 g/t Au, including 2m @ 3.14 g/t Au; 62 g/t Ag
In addition, there are nine unexplored targets, including large areas to the N, S, and E of Aguila
Main and Aguila South (Figure 2).
ASX Announcement
Released 31 January 2025
7
Hole #
DDA-05
DDA-07
DDA-08
DDA-09
DDA-20
DDA-25
DDA-31
DDA-34
DDA-34
DDA-38
DDA-42
MFEA-01
MFEA-02
Target
Aquila Main
Aquila South
Aquila South
Aquila South
Aquila South
Aquila South
Including
Aquila South
Aquila South
Aquila South
Aquila South
Aquila South
Aquila South
Aquila Main
Aquila Main
Aquila Main
Aquila Main
Aquila Main
Aquila Main
From (m)
39.78
25.82
48.68
148.00
55.30
42.35
45.90
52.95
56.10
12.55
16.50
30.27
299.38
23.80
164.00
23.00
66.00
80.00
143.00
To (m)
40.07
26.04
49.23
148.25
55.63
49.35
47.60
54.80
56.40
12.90
19.50
30.97
302.25
27.80
165.00
25.00
68.00
83.00
144.00
Width (m)
0.29
0.22
0.55
0.25
0.33
7.00
1.70
1.85
0.30
0.35
3.00
0.70
2.87
4.00
1.00
2.00
2.00
3.00
1.00
Au g/t
1.06
13.18
40.55
3.97
12.05
2.48
9.02
2.04
3.85
1.46
5.97
2.84
5.93
0.46
4.35
0.26
0.50
0.63
0.60
Ag g/t
227
29
107
12
15
16
51
20
96
52
8
7
28
25
11
52
90
80
155
Table 5: Assay highlights of the diamond drilling completed at the El Aguila Property.
RC Hole
Target
CRC-01 Aquila Main
Including
Aquila Main
CRC-06
Aquila Main
CRC-07 Aquila Main
Aquila Main
CRC-09
Aquila Main
From (m) To (m) Width (m)
92.00 114.00
22.00
112.00 114.00
2.00
32.00 42.00
10.00
54.00 56.00
2.00
60.00 62.00
2.00
28.00 32.00
4.00
86.00 88.00
2.00
Au g/t
0.94
3.14
0.32
1.25
0.48
0.49
0.52
Ag g/t
29
67
55
9
67
91
118
Table 6: Assay highlights of the reverse circulation (RC) completed at the El Aguila Property.
To refine drilling targets ahead of its maiden exploration drilling campaign, Battery Age has
started planning a comprehensive set of exploration activities. The Battery Age Minerals team
plans to be on the ground to commence these activities in Q1 2025. The Company’s initial
steps will include mapping and interpreting the structural setting of the project, integrating
existing geological data with additional mapping and prospecting efforts. Following this,
surface and subsurface data will be combined into a cohesive 3D model to enhance target
identification and definition. A comprehensive soil sampling program will then be implemented
along the strike of the Aguila South (both east and west) and Aguila Main targets, followed by
trenching on identified gold and silver anomalies. To further support these efforts, the
Company plans to conduct geophysical surveys, including LiDAR, magnetic (MAG) surveys,
and potentially ground-induced polarization (IP) surveys, to better understand the subsurface
geology and structure. Pending land access and permitting, the Company is targeting the
second half of 2025 for the commencement of its maiden drilling campaign.
ASX Announcement
Released 31 January 2025
8
Battery Age CEO, Nigel Broomham, commented:
"Securing the farm-in to earn up to 80% to 100% of the El Aguila project is a significant
milestone for Battery Age, positioning us in one of Argentina's most productive mining regions.
The project’s geological setting, combined with the high-grade surface samples we’ve
identified, demonstrates its tremendous potential for large-scale gold and silver mineralisation.
We are excited to work closely with Fredonia Mining Inc. as we unlock the full potential of this
asset. Our upcoming exploration activities, including detailed mapping, surface sampling, and
geophysical surveys, are designed to refine our drilling targets and prepare for what we believe
will be a highly impactful maiden drilling campaign."
References
1.
Panorama Minero, Santa Cruz: “Mining represents 80% of the province’s total exports, August
22, 2024.
[ENDS]
Release authorised by the Board of Battery Age Minerals Ltd.
Contacts
Investors / Shareholders
Media
Nigel Broomham
Kelly-Jo Fry
Chief Executive Officer
Battery Age Minerals
P: +61 (0)8 6109 6689
P: +61 (0)8 6109 6689
E: info@batteryage.au
E: kjfry@batteryage.au
Competent Person Statement
The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the ‘JORC
Code’) sets out minimum standards, recommendations and guidelines for Public Reporting in Australasia of
Exploration Results, Mineral Resources and Ore Reserves.
The information in this release that relates to Exploration Results is based on information prepared by Dr Simon
Dorling. Dr Dorling is a member of the Australasian Institute of Geoscientists (Member Number: 3101) and a
consultant of Battery Age. Dr Dorling has sufficient experience which is relevant to the style of mineralisation and
type of deposit under consideration and to the activity which they are undertaking to qualify as a Competent Person
as defined in the 2012 Edition of the JORC Code (Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves). Dr Dorling consents to the inclusion in the release of the matters based on their
information in the form and context in which it appears.
Forward-Looking Statement
This announcement may contain certain forward-looking statements and projections. Such forward looking
statements/projections are estimates for discussion purposes only and should not be relied upon. Forward looking
statements/projections are inherently uncertain and may therefore differ materially from results ultimately achieved.
Battery Age Minerals Limited does not make any representations and provides no warranties concerning the
accuracy of the projections and disclaims any obligation to update or revise any forward-looking statements/projects
based on new information, future events or otherwise except to the extent required by applicable laws. While the
information contained in this report has been prepared in good faith, neither Battery Age Minerals Limited or any of
its directors, officers, agents, employees or advisors give any representation or warranty, express or implied, as to
the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this
announcement.
ASX Announcement
Released 31 January 2025
9
Appendix 1 –Farm-In Agreement Summary of Material Terms
Overview:
Concept
Stage 1
Cash
payments
by BM8
Exploration
Expenditure
by BM8
(USD)
(USD)
$75,000
$1,850,000
Interest in
Project
Comments
%
51%
Cash will be paid upon settlement of the agreement.
Exploration expenditure is to be incurred by BM8 within
36 months from settlement.
Stage 2
$100,000
$950,000
29%
Cash will be paid upon the commencement of Stage 2
of the earn-in.
Total
$175,000
$2,800,000
80%
Upon completion of the earn-in
Up to
100%
Fredonia will either retain a 20% interest in El Aguila
Project and form a joint venture with BM8 or elect to
convert its interest to a 3% net smelter royalty (NSR),
resulting in BM8 holding a 100% interest in the El Aguila
Project. BM8 will have the option to repurchase 50% of
the NSR for US$500,000
JV or NSR
-
-
Exploration expenditure is to be incurred by BM8 within
48 months from settlement.
Summary of material terms:
Parties
Minera Fredonia S.A. (Seller) and Fredonia Mining Inc. (Seller Parent)
(together, the Seller Parties); and
Battery Age Minerals Ltd (BM8) and Piedra Negra S.A. (Buyer Sub)
(together, the Buyer Parties).
Tenements
Aguila I (No423.460/W/10.); Aguila II (No427.885/W/11.-), and Winki
(No406.199/W/02.-) (Tenements), comprising the El Aguila Project located in
Santa Cruz, Argentina.
Conditions Precedent
BM8’s right to earn an interest in the Tenements is condition upon:
(a) the Buyer completing due diligence on the Tenements to its sole and
absolute satisfaction; and
(b) the Parties obtaining all necessary third-party, legal or regulatory
approvals, consents and waivers.
Earn-in requirements
BM8 (via the Buyer Sub) will have the right to earn up to an 80% interest in
the El Aguila Project via a two staged earn-in agreement (Agreement) as
follows:
Earn in up to 51% interest: BM8 will acquire an initial 51% interest in the El
Aguila Project (Stage 1 Interest) by:
(a) making a cash payment of US$75,000 to the Seller; and
(b) expending US$1,850,000 in exploration expenditure within 36 months
from settlement of the Agreement.
Earn in up to 80% interest: BM8 will acquire a further 29% interest in the El
Aguila Project (Stage 2 Interest) by:
(a) making a cash payment of US$100,000 to the Seller; and
(b) expending US$950,000 in exploration expenditure within 48 months
from settlement of the Agreement.
Settlement is expected to occur in Q1 CY2025.
ASX Announcement
Released 31 January 2025
10
Joint Venture or Seller Royalty Election: Upon BM8 earning the Stage 2
Interest, the Seller may either elect to:
(a)
form a joint venture on the basis of BM8 holding an 80% interest and the
Seller holding a 20% interest; or
(b)
convert its 20% interest in the El Aguila Project to a 3% net smelter
returns royalty (Royalty), resulting in BM8 holding a 100% interest in the
El Aguila Project.
If the Seller elects to convert its remaining 20% interest into the Royalty, BM8
will have the right (at its discretion) to purchase 50% of the Royalty (i.e.
1.5%) by making a cash payment of US$500,000 to the Seller.
If the Seller does not elect to convert its interest into the Royalty, the parties
will form a joint venture (JV) with respect to their interests in the El Aguila
Project.
The joint venture terms will be based on commercially standard terms for
similar projects and will include market standard management and dilution
provisions. Should a JV be formed, each participant will be responsible to
contribute to payment of JV activities in proportion to its percentage share.
BM8 would be the manager of the JV. Managers will be entitled to a
management fee of an amount no greater than 10% of the JV expenditure.
Standard dilution provision will apply.
Withdrawal
BM8 may withdraw from the Agreement at any time during the Stage 1 Period
or Stage 2 Period by providing written notice to the Seller.
Other terms
The Agreement otherwise contains customary terms and conditions for an
agreement of this nature, including standard representations and warranties
relating to the El Aguila Project.
ASX Announcement
Released 31 January 2025
11
ASX Announcement
Appendix 2 – Drill Collar Map, Drill Collar, Trench, Channel and Rock Chip
Sampling
Figure 6: Drill Collar Map El Aguila Main
Figure 7: Drill Collar Map El Aguila South
Battery Age Minerals Ltd
ASX: BM8
ACN 085 905 997
batteryageminerals.au
T: +61 (8) 6109 6689
E: info@batteryage.au
Level 50, 108 St Georges Terrace
Perth, WA 6000
PO Box 7310, Cloisters Square Po, WA 6850
12
HOLE_ID
X_EAST
Y_NORTH
ELEVATION
AZIMUTH
DIP
TOTAL
DEPTH
DRILLING
COMPANY
El Aguila
DDA-01
2629068.3
4668576.49
121.9399
350
-45
73.2
COEUR
El Aguila
DDA-02
2629088.55
4668501.11
116.0211
16
-45
70.5
COEUR
El Aguila
DDA-03
2628489.56
4668729.2
115.3839
310
-45
100.3
COEUR
El Aguila
DDA-04
2628532.47
4668707.44
114.4335
305
-45
76.6
COEUR
El Aguila
DDA-05
2628637.6
4668645.43
118.7443
300
-45
46.3
COEUR
El Aguila
DDA-06
2629227.18
4668780.94
111.62
170
-45
67.3
COEUR
El Aguila
DDA-07
2628024.84
4667113.34
100.0047
245
-45
52.2
COEUR
El Aguila
DDA-08
2627999.48
4666991.13
101.3203
265
-50
52.8
COEUR
El Aguila
DDA-09
2628054.38
4666999.45
97.0638
275
-45
166.2
COEUR
El Aguila
DDA-10
2628091.82
4666998.55
95.0113
275
-50
100.3
COEUR
El Aguila
DDA-11
2628117.28
4666411.15
89.2491
54
-50
61.3
COEUR
El Aguila
DDA-12
2628198.09
4666281.16
88.6705
45
-45
52.3
COEUR
El Aguila
DDA-13
2628307.36
4666692.44
105.2333
50
-45
61.7
COEUR
El Aguila
DDA-14
2628312.78
4667112.76
97.9199
97
-50
91.5
COEUR
El Aguila
DDA-15
2631857.97
4668671.4
105.9273
40
-45
76.4
COEUR
El Aguila
DDA-16
2628041.45
4667056.68
98.774
265
-55
60
COEUR
El Aguila
DDA-17
2627929.3
4667046.42
102.3845
85
-55
150
COEUR
El Aguila
DDA-18
2627932.76
4666934.62
100.0758
85
-45
75
COEUR
El Aguila
DDA-19
2627951.39
4667079.41
101.5115
65
-50
60
COEUR
El Aguila
DDA-20
2628063.68
4667131.85
98.4091
245
-60
106.5
COEUR
El Aguila
DDA-21
2628359.98
4666734.26
105.3301
230
-45
47.7
COEUR
El Aguila
DDA-22
2628329.53
4666826.98
104.4378
230
-60
76.7
COEUR
El Aguila
DDA-23
2628235.25
4666920.14
96.2519
230
-60
71
COEUR
El Aguila
DDA-24
2628383.04
4666869.81
105.5517
230
-60
160.5
COEUR
El Aguila
DDA-25
2628088.2
4666533.83
93.5672
90
-60
80
COEUR
El Aguila
DDA-26
2628136.43
4666364.3
88.3688
70
-60
62
COEUR
El Aguila
DDA-27
2628157.44
4666240.81
87.1632
45
-50
106.5
COEUR
El Aguila
DDA-28
2628202.07
4666228.12
87.6443
45
-60
107
COEUR
El Aguila
DDA-29
2627586.55
4666249.97
117.4197
90
-45
110
COEUR
El Aguila
DDA-30
2627650.81
4666450.02
119.6476
90
-45
61.5
COEUR
El Aguila
DDA-31
2627613.35
4666365.04
118.0646
90
-45
91.3
COEUR
El Aguila
DDA-32
2627599.5
4666450.38
115.3693
90
-60
130.5
COEUR
El Aguila
DDA-33
2628009.14
4666534.82
99.7637
90
-60
169
COEUR
El Aguila
DDA-34
2628242.97
4666260
88.8288
45
-45
67.5
COEUR
El Aguila
DDA-35
2628386.71
4666012.16
96.3223
90
-45
52.1
COEUR
El Aguila
DDA-36
2628357.88
4666011.59
92.2757
90
-60
62.5
COEUR
El Aguila
DDA-37
2628444
4666918
102
230
-60
260
COEUR
El Aguila
DDA-38
2628610
4666470
96
240
-60
181.5
COEUR
El Aguila
DDA-39
2628290
4665973
89
70
-60
148.2
COEUR
El Aguila
DDA-40
2628116
4667230
101
270
-50
198.1
COEUR
El Aguila
DDA-41
2629977
4667450
123
275
-45
151.2
COEUR
DDA-42
2629081
4668386
110
0
-45
339
COEUR
MFEA-01
2629150
4668384
107
0
-45
280.9
FREDONIA
PROJECT
El Aguila
El Aguila
TARGET
Aguila
Main
ASX Announcement
Released 31 January 2025
13
PROJECT
HOLE_ID
X_EAST
Y_NORTH
ELEVATION
AZIMUTH
DIP
TOTAL
DEPTH
DRILLING
COMPANY
MFEA-02
2629150
4668484
115
0
-45
250.8
FREDONIA
MFEA-03
2629440
4668270
99
0
-55
209.1
FREDONIA
MFEA-04
2628555
4668687
117
120
-45
247.9
FREDONIA
MFEA-05
2628280
4668656
96
0
-45
250.9
FREDONIA
El Aguila
TARGET
Aguila
Main
Aguila
Main
Aguila
Main
Aguila
Main
San
Cristóbal
MFEA-06
2629775
4667615
115
115
-45
182.1
FREDONIA
El Aguila
Verbena
MFEA-07
2630183
4665154
91
90
-45
252.9
FREDONIA
El Aguila
Verbena
Loma
Blanca
MFEA-08
2631214
4665117
77
315
-45
139.9
FREDONIA
MFEA-09
2627610
4666365
110
90
-60
118.8
FREDONIA
Fresia
Aguila
Main
MFEA-10
2628060
4666980
97
250
-55
200
FREDONIA
MFEA-11
2629008
4668480
105
0
-65
295
FREDONIA
El Aguila
El Aguila
El Aguila
El Aguila
El Aguila
El Aguila
El Aguila
Table 7: Diamond drilling Collar Table
PROJECT
HOLE_ID
X_EAST
Y_NORTH
ELEVATION
AZIMUTH
DIP
TOTAL
DEPTH
DRILLING COMPANY
El Aguila
CRC-01
2629440.05
4668338.16
109.738
360
-55
150
NEWCREST
El Aguila
CRC-02
2629187.87
4668401.01
106.131
360
-65
91
NEWCREST
El Aguila
CRC-03
2629012.96
4668359.58
104.442
360
-55
170
NEWCREST
El Aguila
CRC-04
2628411.28
4668717.15
114.742
360
-55
162
NEWCREST
El Aguila
CRC-05
2628155.13
4668775.55
115.318
360
-55
134
NEWCREST
El Aguila
CRC-06
2627911.11
4668721.56
110.879
360
-55
160
NEWCREST
El Aguila
CRC-07
2628612.47
4668581.91
107.12
360
-55
148
NEWCREST
El Aguila
CRC-08
2629325
4668649
102
180
-55
112
NEWCREST
El Aguila
CRC-09
2629012.5
4668484.76
111.113
360
-55
120
NEWCREST
AZIMUTH
Table 8: RC Drilling Collar Table
PROJECT
HOLE_ID
X_EAST
Y_NORTH
ELEVATION
TRENCH
TRICONO
LENGTH
COMPANY
El Aguila
TARGET
T01
2628208.01
4668735.73
103.7632
116
0
116
HISTORICA
El Aguila
T02
2628654.67
4668618.95
113.342
271
0
271
HISTORICA
El Aguila
T03
2628907.46
4668473.74
113.0083
260.75
0
260.75
HISTORICA
El Aguila
T04
2629066.65
4668519.79
118.0042
268.9
0
268.9
HISTORICA
El Aguila
T05
2629251.83
4668524.09
114.866
272.8
0
272.8
HISTORICA
El Aguila
T06
2628852.03
4668388.35
99.7934
134.7
0
134.7
HISTORICA
El Aguila
T07
2629345.77
4668373.47
105.1966
186.6
0
186.6
HISTORICA
El Aguila
T08
2629402.63
4668330.46
106.9077
131.6
0
131.6
HISTORICA
El Aguila
T09
2629218.03
4668342.68
98.9546
36.3
0
36.3
HISTORICA
El Aguila
T10
2627621.64
4668696.05
114.9912
62
0
62
HISTORICA
El Aguila
T11
2627625.97
4668805.51
118.5888
50.8
0
50.8
HISTORICA
El Aguila
T12
2627638.67
4668922.34
100.7581
35.7
0
35.7
HISTORICA
El Aguila
T13
2627666.15
4668737.38
110.4819
4.2
0
4.2
HISTORICA
El Aguila
T14
2627681.04
4668737.31
113.1176
3.1
0
3.1
HISTORICA
ASX Announcement
Released 31 January 2025
14
PROJECT
HOLE_ID
X_EAST
Y_NORTH
ELEVATION
AZIMUTH
TRENCH
TRICONO
LENGTH
COMPANY
SC01
2629793
4667688
117
111
97
0
97
FREDONIA
SC02
2629753
4667683
119
207
31
0
31
FREDONIA
SC03
2629708
4667713
112
315
11
0
11
FREDONIA
Share your feedback
Discover