Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX Announcement
Released 26 July 2024
June 2024 Quarterly Activities Report
New high-grade lithium discoveries at Falcon ahead of re-commencement of
drilling in July; BM8 accelerates to 51% ownership of Bleiberg Project
Key highlights:
•
Discovery of high-grade lithium mineralisation: rock chip assays grading up to
2.86% Li2O, confirming the presence of mineralised spodumene-bearing pegmatite on
the newly acquired Falcon Extension Property. This significant find adds to the Falcon
Lithium Project’s list of priority drill targets within the previously defined 5km long
mineralised corridor, enhancing its exploration potential.
•
Drilling re-commences to test multiple newly identified targets across the highly
prospective 5km long corridor at Falcon Lake. The program will aim to expand on
the successful 2023 drilling programs, which returned significant high-grade intercepts
including:
o
31.75 metres @ 1.45% Li2O (23FL-031)
o
27.6 metres @ 1.37% Li2O (23FL-001)
o
21.9 metres @ 1.44% Li2O (23FL-004)
o
20.65 metres @ 1.48% Li2O (23FL-081)
o
18.95 metres @ 1.65% Li2O (23FL-076)
•
Battery Age accelerates to 51% interest in the Bleiberg Zinc-Germanium Project,
Austria: Variation to farm-in joint venture results in BM8 moving to 51% interest in the
Bleiberg Project, complementing its 100% interest in the Bleiberg West Extension
Project.
•
The Company continues to evaluate potential value-adding M&A opportunities
in multiple commodities in Tier-1 jurisdictions globally.
Battery Age Minerals Ltd (ASX: BM8, “Battery Age”, or the “Company”) is pleased to provide
the following summary of activities undertaken during the quarter ending 30 June 2024 (“June
Quarter”).
The June Quarter was a busy period for Battery Age, with the Company completing a highly
successful fieldwork program at the Falcon Lake Lithium Project in Ontario, Canada ahead of
the re-commencement of drilling in July, and strengthening its ownership position at the
Bleiberg Lead-Zinc-Germanium Project in Austria.
Battery Age Minerals Ltd
ASX: BM8
ACN 085 905 997
batteryageminerals.au
T: +61 (8) 6109 6689
E: info@batteryage.au
Level 50, 108 St Georges Terrace
Perth, WA 6000
PO Box 7310, Cloisters Square PO, WA 6850
1
Project Activities
Falcon Lake Lithium Project (Ontario, Canada)
During the Quarter, the Company completed its 2024 field program which focused on potential
extensions of known mineralisation with the aim of building on the successful field campaigns
completed last year, which had confirmed the presence of high-grade spodumene
mineralisation across a 5km prospective corridor.
The field program returned rock chip assay grades of up to 2.86% Li2O confirming the presence
of mineralised spodumene-bearing pegmatite on the Falcon Extension Property, which the
Company acquired the staged option over in October 2023. In addition the prospecting teams
focused on mapping and prospecting under-explored regional tenure at Falcon West and
Falcon East.
The new discovery had been added to the list of priority drill targets across the 5km mineralised
corridor at Falcon Lake Lithium Project, significantly enhancing the Project’s exploration
potential.
The focused 2024 Spring Fieldwork Program has built on successful field campaigns
completed last year, which identified over 30 outcropping pegmatites and confirmed the
presence of spodumene mineralisation across a 5km prospective corridor (Figure 1).
The Spring Program was designed to investigate major regional structures in favourable
volcanogenic stratigraphy, focusing on areas of elevated topographic relief. In addition, the infield team collected 379 bedrock rock chip samples (Appendix 1, Table 1) from all outcrops
encountered across the Falcon East, Falcon West and Falcon Extension properties (Figure 2)
including LCT pegmatite intrusions.
Figure 1 – Falcon Extension discovery with 2023 mineralised pegmatites at Falcon Lake.
ASX Announcement
Released Released 26 July 2024
2
Subsequent to the quarter, the Company confirmed the re-commencement of drilling activities
at the Falcon Lake Project.
The 2024 drilling program will aim to expand on the successful 2023 drilling programs, which
returned significant high-grade intercepts including:
o
31.75 metres @ 1.45% Li2O (23FL-031)
o
27.6 metres @ 1.37% Li2O (23FL-001)
o
21.9 metres @ 1.44% Li2O (23FL-004)
o
20.65 metres @ 1.48% Li2O (23FL-081)
o
18.95 metres @ 1.65% Li2O (23FL-076)
The program has been designed to further delineate and expand the high-grade lithium zones
identified last year, as well as to test new pegmatite discoveries within other high-priority zones
across the 5km mineralised corridor.
The drilling program has been designed and prioritised based on the results of the 2023 and
2024 summer field exploration campaign, which included lidar, ortho-imagery, ground
magnetics, prospecting, rock chip sampling, and litho-geochemical transects across the Falcon
Main tenure.
Jesse Lake Lithium Project (Ontario, Canada)
No exploration activities were conducted during the June Quarter.
Bleiberg Project (Bad Bleiberg, Austria)
During the Quarter, the Company advised that it had negotiated an addendum to the Joint
Venture Earn-In Agreement with Poly Resources LLC (POLY) and Multi-Metal Development
Ltd (Multi-Metal) regarding the Company’s earn-in terms for the Bleiberg Zinc-LeadGermanium Project in Austria.
The revised terms resulted in Battery Age immediately moving to a 51% interest in the Bleiberg
Project, complementing its 100% interest in the Bleiberg West Extension.
This was completed through the issuance of the previously agreed shares as outlined in Phase
2 of the earn-in in advance of meeting the required joint venture spend requirements.
Additionally, the parties agreed to:
(a) Extend the Phase 3 earn-in period whereby the Company may acquire an additional 14%
(i.e. 65% in total) in the JV project by expending the previously agreed C$3.5m over the
next 36 months, a 12 month increase to the contracted 24 months; and
(b) Extend the Phase 4 earn-in period whereby the Company may acquire (subject to
completion of Phase 3) an additional 15% interest (i.e. 80% in total) in the JV project area
upon completion of a Bankable Feasibility Study (BFS) within the next 6.5 years from
execution of the abovementioned addendum, a change from 6.5 years from the date of the
original agreement.
ASX Announcement
Released Released 26 July 2024
3
The remainder of terms to remain unchanged (refer to ASX announcement dated 16 May 2024
and Appendix A and the Company’s Prospectus announced on 2 February 2023 for further
details and terms and conditions).
In consideration for these variations, the Company issued the joint venture partners an
additional 210,000 fully paid ordinary shares.
Battery Age is focused on early-stage exploration for Germanium and Gallium, both highly
strategic minerals used in a range of specialist applications including High-Performance Logic
Chips which are used in Electronic Vehicles, Artificial Intelligence and Quantum Computing.
Senior Battery Age geologists have recently returned from Austria, where they successfully
accessed over 100 years of historic mining data from the Bleiberg Zinc-Lead-Germanium Mine.
The acquisition of this high-quality dataset has enabled Battery Age to fast-track the
development of its exploration plan strategically targeting extensions of the known
mineralisation on its tenements.
During this period, the Battery Age team also conducted site visits and liaised with the local
authorities and community to build and strengthen relationships with local mining bodies.
Figure 2 – Identified mineralised trend located along strike from historical workings. Inset table demonstrates
historical data for the Bleiberg Mine from previous workings).
Tidili Project (Tidili, Morocco)
No exploration activities were conducted during the June Quarter.
King Tut Project (Argentina)
No exploration activities were conducted during the June Quarter.
Bloom Lake Project (Bloom Lake, Canada)
No exploration activities were conducted during the June Quarter.
ASX Announcement
Released Released 26 July 2024
4
Finance
The Appendix 5B quarterly cashflow report for the June Quarter is submitted separately.
The Group closed the June Quarter with a cash balance of $1,827k. Exploration expenditure
during the June Quarter totalled $251k (unaudited).
During the Quarter, Battery Age received net proceeds of $980,000 from an off-market block
trade of approximately 2.7 million shares in Equinox Resources (EQN).
Use of Funds
A comparison of the Company’s actual expenditure since readmission to the Official List of
ASX to 30 June 2024 against estimated expenditure in the use of funds statement in the
Prospectus is set out below in accordance with ASX Listing Rule 5.3.4. The table also shows
the Company’s expenditure for the March quarter, as required by ASX Listing Rule 5.3.1:
Tidili Project
Falcon Lake Project
Bloom Lake Project
King Tut Project
Bleiberg Project
Administration and corporate costs
Costs associated of the Public Offer
Working Capital & M&A budget for complementary assets
2023
Prospectus
1,295,000
2,050,000
30,000
100,000
1,215,000
1,328,000
658,000
343,000
Use until
30 Jun 2024
1,282,376
6,560,289
47,882
308,113
2,764,727
603,094
668,118
Use For Jun
24 Quarter
189,299
282,731
4,549
30,607
407,000
-
7,019,000
12,234,599
914,186
The material use of funds variance explanations is outlined below:
Note: A capital raise of $6.4m was completed in August 2023 and is outside the Use of Funds
estimate.
June Quarter Spend:
•
Falcon Lake Project: Payments relating to tenement compliance reporting, field work
program, plus road maintenance & overhead costs.
•
Tidili Project: Payments relating to the March quarter drilling program (not capitalised).
•
Bleiberg Project: Payments relating to June/July trip to Bleiberg and analysis of the
historical data.
•
Administration: Payments relating to the June quarter for employee, directors, interim audit
and compliance plus general overhead.
Use of Funds variance Prospectus to Date
•
Variance to operational expenditures are due to the accelerated drilling campaign at
Falcon Lake. The maiden drill campaign of 5,000m at Falcon Lake as outlined in the
Prospectus has been surpassed due to positive results, therefore the drill campaign was
expanded. Project to date we have drilled 9,286m.
ASX Announcement
Released Released 26 July 2024
5
•
Variances to administration and corporate cost are due to the accelerated operational
campaign being deployed at Falcon Lake and the additional administrative support
required.
•
Variance to working capital is due to the acquisition of EQN shares for $325k.
•
Ongoing operational and exploration expenditure will be monitored and adjusted in line
with available cash to meet tenement expenditure requirements.
Payments to Related Parties
Pursuant to section 6 of the Company’s Appendix 5B, and as required under ASX Listing Rule
5.3.5, during the June Quarter the Company paid $30k to current Directors for remuneration.
Capital Structure
The capital structure at the end of the June Quarter is as follows:
•
93,149,140 Ordinary Shares.
•
41,904,923 Options.
•
1,735,000 Performance Rights.
•
7,000,000 Performance Shares.
Interests in Mining Tenements as at 30 June 2024
Interest during
Quarter
Interest at the end
of Quarter
M47/1450
221266, 221267, 229223
243759, 251792, 251793
251794, 287807, 308044
325202, 336173, 582713
582714, 716167, 716168,
716165, 716166, 716170,
716171, 716169
(8.53)%
-
27.97%
100%
727287 to 727384
2668831, 670166, 670168,
721084, 721085, 746214,
754668
3106057-106058, 121357121360, 122094, 132858132859, 134102, 136948,
136962, 142489, 148810,
164547-164548, 166603,
178073, 179345, 185376185377, 186114-186115,
208573, 209065, 215331,
224637-224639, 237714237716, 244810, 246081,
252181, 256393-256395,
274457, 281913, 289275,
-
100%
-
90%
Location
Tenement Reference
Western Australia1
Canada, Bloom Lake
Canada, Falcon Lake
- Central
ASX Announcement
Released Released 26 July 2024
100%
6
Location
- West
- East
Canada, Jessie Lake
Morocco, Tidili5
Austria, Bleiberg4
Argentina
1.
2.
3.
4.
5.
Tenement Reference
291550, 301417-301418,
302155, 311782-311784
727385 – 727406
727409 – 727452
834651 – 834704
835652 - 835724
EP3842355, EP3842356,
ML383699
EL 476/22 (BB1) – 591/22
(BB116)
1524/23 (1/23) – 1583/23
(60/23)
168-L-1939
66-C-2005
28-L-2011
Interest during
Quarter
Interest at the end
of Quarter
-
100%
100%
100%
-
85%
36%
51%
-
100%
-
100%
100%
100%
Battery Age’s interest in the Hamersley Iron Ore Project is held indirectly by way of its investment held in Equinox Resources Limited.
In October 2023, the Company acquired a 2 year option, (i) an initial 40% interest by making a cash payment of CAD$100k and
issuing 250k fully paid ordinary shares (completed); (ii) acquisition of an addition 40% interest by making a cash payment of CAD$75k
and issuing 250k fully paid ordinary shares on or before the first anniversary of stage (i) and (iii) acquisition of an addition 10%
interest by making a cash payment of CAD$15k and issuing 250k fully paid ordinary shares on or before the second anniversary of
stage (i). The Company will retain the respective % interest acquired under the respective staged option, in the event that the
subsequent option(s) are not exercised.
The Company may acquire the final 10% of the above identified Falcon Lake tenements by paying an amount equal to the lower of
(i) the price determined by an independent valuation, or (ii) A$2,000,000.
During the quarter, the Company acquired a further 36% interest (total 51%) in the above Bleiberg tenements
The Company may acquire a further 14% interest (total 65%) in the above Bleiberg tenements within 36 months of acquiring the
abovementioned 36% interest by incurring an additional C$3,500,000 in expenditure on the project.
The Company may acquire the final 15% interest (total 80%) in the above Bleiberg tenements within 6.5 years from executing the
Bleiberg Addendum Agreement upon completion of a Bankable Feasibility Study that is compliance to JORC and indicates the project
will have a production rate of at least 100,000 tonnes per year.
The Company is taking steps to relinquish the Company’s interest in the Tidili Project to the in-country partners.
- END Release authorised by the Board of Battery Age Minerals Ltd.
Contacts
Investors / Shareholders
Nigel Broomham
Chief Executive Officer
P: +61 (0) 8 6109 6689
E: info@batteryage.au
ASX Announcement
Released Released 26 July 2024
Media
Kelly-Jo Fry
P: +61 (0) 8 6109 6689
E: info@batteryage.au
7
Compliance Statement
This report contains information on the Falcon Lake and Jessie Lake Projects extracted from an ASX market announcement dated
8 December 2022, 2 February 2023, 13 June 2023, 26 July 2023, 2 August 203, 16 August 2023, 6 September 2023, 14
September 2023, 5 October 2023, 10 October 2023, 16 October 2023, 25 October 2023, 1 November 2023, 30 November 2023,
13 December 2023 18 April 2024, 8 July 2024 and 11 July 2024 released by the Company and reported in accordance with the
2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code).
This report contains information on the Tidili Project extracted from an ASX market announcement dated 8 December 2022, 2
February 2023, 11 April 2023, 24 July 2023 and 28 March 2024 released by the Company and reported in accordance with the
2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code).
This report contains information on the Bleiberg Project extracted from an ASX market announcement dated 8 December 2022,
2 February 2023, 13 July 2023, 21 August 2023, 26 February 2024, 26 March 2024 23 April 2024 and 16 May 2024 released by
the Company and reported in accordance with the 2012 edition of the “Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves” (JORC Code). The original market announcements are available to view on
www.batteryage.au and www.asx.com.au. Battery Age is not aware of any new information or data that materially affects the
information included in the original market announcement.
Forward Looking Statements
Information included in this release constitutes forward-looking statements. Often, but not always, forward looking statements can
generally be identified by the use of forward looking words such as “may”, “will”, “expect”, “intend”, “plan”, “estimate”, “anticipate”,
“continue”, and “guidance”, or other similar words and may include, without limitation, statements regarding plans, strategies and
objectives of management, anticipated production or construction commencement dates and expected costs or production
outputs. Forward looking statements inherently involve known and unknown risks, uncertainties and other factors that may cause
the Company’s actual results, performance and achievements to differ materially from any future results, performance or
achievements. Relevant factors may include, but are not limited to, changes in commodity prices, foreign exchange fluctuations
and general economic conditions, increased costs and demand for production inputs, the speculative nature of exploration and
project development, including the risks of obtaining necessary licenses and permits and diminishing quantities or grades of
reserves, political and social risks, changes to the regulatory framework within which the company operates or may in the future
operate, environmental conditions including extreme weather conditions, recruitment and retention of personnel, industrial
relations issues and litigation. Forward looking statements are based on the Company and its management’s good faith
assumptions relating to the financial, market, regulatory and other relevant environments that will exist and affect the Company’s
business and operations in the future. The Company does not give any assurance that the assumptions on which forward looking
statements are based will prove to be correct, or that the Company’s business or operations will not be affected in any material
manner by these or other factors not foreseen or foreseeable by the Company or management or beyond the Company’s control.
Although the Company attempts and has attempted to identify factors that would cause actual actions, events or results to differ
materially from those disclosed in forward looking statements, there may be other factors that could cause actual results,
performance, achievements or events not to be as anticipated, estimated or intended, and many events are beyond the reasonable
control of the Company. Accordingly, readers are cautioned not to place undue reliance on forward looking statements. Forward
looking statements in these materials speak only at the date of issue. Subject to any continuing obligations under applicable law
or any relevant stock exchange listing rules, in providing this information the company does not undertake any obligation to publicly
update or revise any of the forward-looking statements or to advise of any change in events, conditions or circumstances on which
any such statement is based.
ASX Announcement
Released Released 26 July 2024
8
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
BATTERY AGE MINERALS LTD
ABN
Quarter ended (“current quarter”)
80 085 905 997
30 June 2024
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date (12
months)
$A’000
-
-
(189)
(525)
(b) development
-
-
(c) production
-
-
(d) staff costs
(206)
(865)
(e) administration and corporate costs
(430)
(1,601)
-
-
14
54
(a) exploration & evaluation
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
223
1.8
Other (provide details if material)
- Net Tax (Payable)/Receivable
(40)
165
(851)
(2,550)
(a) entities
-
-
(b) tenements
-
(116)
(c) property, plant and equipment
-
(6)
(63)
(5,419)
(e) investments
-
(325)
(f)
-
-
1.9
Net cash from / (used in) operating
activities
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(d) exploration & evaluation
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date (12
months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
980
980
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
917
(4,886)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
6,403
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
1
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
(335)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
(6)
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
-
6,063
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
1,761
3,200
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(851)
(2,550)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
917
(4,886)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
-
6,063
(d) investments
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Year to date (12
months)
$A’000
-
-
1,827
1,827
Current quarter
$A’000
Previous quarter
$A’000
5.1
Bank balances
1,388
628
5.2
Call deposits
439
1,133
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
1,827
1,761
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
(30)
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
(851)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(63)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(914)
8.4
Cash and cash equivalents at quarter end (item 4.6)
1,827
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
1,827
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
2.00
$A’000
-
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: N/A
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: N/A
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
26 June 2024
Authorised by: The Board of Battery Age Minerals Ltd
(Name of body or officer authorising release – see note 4)
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5.
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, that this report complies with the appropriate accounting standards
and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a
sound system of risk management and internal control which is operating effectively.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 5