Tailings Sampling Underway at Bleiberg-Hochobir Project
Released
Released
Announcement PDF
ASX Announcement
Released 6 June 2025
Battery Age Commences Tailings Sampling
Campaign to Assess Germanium Potential
at Bleiberg-Hochobir
HIGHLIGHTS
•
Mine Tailings Sampling Program Initiated: Battery Age has commenced a
systematic sampling campaign across mine dumps and historical tailings within the
Bleiberg and Hochobir project areas in Carinthia, Austria.
•
Strategic Focus on Critical Metals: The sampling program aims to quantify
germanium concentrations within historical waste materials, a key step in evaluating
the prospectivity for secondary recovery opportunities amid tightening global supply
conditions. The campaign will include targeted field investigations, sampling, and
laboratory analysis, followed by a comprehensive prospectivity report in Q3 2025.
•
Large-Scale Opportunity: The Bleiberg-Hochobir landholding covers approximately
330 km² across two historical mining districts known for extensive lead-zinc production
and associated germanium mineralisation, with historic concentrate grades reaching
up to 1,500 g/t Ge.
•
Drilling Preparations Underway: Battery Age is planning to commence its maiden
drilling campaign at the Bleiberg Germanium-Zinc Project, subject to final regulatory
approvals, with drilling targeted to commence in the coming quarter.
•
Evaluation of Advanced Recovery Technologies: The Company is currently
evaluating a number of mineral extraction technologies designed to complement its
existing EU-focused critical minerals strategy
•
Strategic Relevance Amid Chinese Export Sanctions: With China sanctioning
germanium exports in 2024 to the USA, Bleiberg presents a truly unique EU-based
opportunity to potentially secure long-term supply of this critical semiconductor
material.
Battery Age Minerals Ltd (ASX: BM8; “Battery Age” or the “Company”) is pleased to
announce that it has commenced its maiden Mine Tailings Prospectivity Study across its
extensive 330 km² exploration holding at Bleiberg and Hochobir, in Carinthia, Austria1.
The program aims to systematically identify and quantify germanium (Ge) concentrations
within mine dumps and historical tailings left by centuries of Pb-Zn mining activity in the region.
Notably, the Bleiberg area has a well-documented history of significant germanium content in
mined ores, with historic concentrate grades reaching up to 1,500 g/t Ge1.
The study will be executed in three phases:
Battery Age Minerals Ltd
ASX: BM8
ACN 085 905 997
batteryageminerals.au
T: +61 (8) 6109 6689
E: info@batteryage.au
Level 50, 108 St Georges Terrace
Perth, WA 6000
PO Box 7310, Cloisters Square Po, WA 6850
1
1. Archive Research: Comprehensive evaluation of historical mining records and
geological literature housed at Geosphere Austria and other archives, to define priority
sampling targets across the vast 330 km² of exploration tenure.
2. Field Campaign: Systematic site inspections, geological investigations, and collection
of tailings and dump samples across identified target areas. Sample analysis will be
performed using aqua regia digestion with ICP-MS finish at ALS Global Laboratories.
3. Reporting: Compilation of analytical results and prospectivity assessments to be
completed in Q3 2025.
The work is being conducted in partnership with Austrian geological consultants Tomrox
GmbH, leveraging local expertise and efficient field mobilization.
Figure 1: Bleiberg and Hochibir, Zinc Lead Germanium Projects located in the state of Carinthia, Austria 2-4.
Battery Age CEO, Nigel Broomham, commented:
“We are excited to commence this important phase of exploration at Bleiberg and Hochobir.
Historical records show extensive mine workings and dumps across our landholding and given
the exceptional germanium grades previously recorded at Bleiberg and Hochibir, this program
could unlock significant secondary recovery opportunities. As germanium becomes an
increasingly strategic mineral, we believe Battery Age is well-positioned to potentially play a
key role in providing secure, EU-based supply.”
Next Steps
Should the sampling results demonstrate prospective germanium concentrations, Battery Age
intends to advance to metallurgical testing to assess the near-term recovery potential of the
tailings material. Positive outcomes from metallurgical testwork would support the evaluation
of low-capex reprocessing opportunities and feed directly into scoping-level technical and
economic studies.
ASX Announcement
Released 6 June 2025
2
Figure 2: The Hochobir Project covers a portion of a 30km long corridor of historic mining centers and
occurrences of galena and sphalerite within the Drauzug-Gurktal nappe system3.
Germanium Market Outlook
Germanium is a critical semiconductor material essential for fibre optics, infrared technologies,
and advanced electronics. With recent export sanctions from China — historically the world’s
dominant producer — supply chains have tightened considerably, driving heightened interest
from Western governments and manufacturers seeking secure alternatives. The European
Union has classified germanium as a strategic raw material under its Critical Raw Materials
Act, reinforcing the urgency to develop domestic and allied sources. Battery Age’s BleibergHochobir portfolio is ideally positioned within the EU to address this supply challenge, offering
a compelling opportunity to support the global transition to resilient, sustainable high-tech
industries.
This tailings initiative forms part of the Company’s broader strategy to unlock value from both
historic and unmined sources, building on recent breakthroughs that confirmed some of the
world’s highest recorded germanium grades at Bleiberg.
With China’s export restrictions on germanium heightening global supply risks, Battery Age
remains committed to progressing its activities across its Austrian portfolio to capitalise on
these market dynamics.
ASX Announcement
Released 6 June 2025
3
References:
1.
Refer to Announcement Breakthrough Germanium Grades up to 1,500 g/t Identified in Bleiberg
Concentrates; 17 April 2025.
2.
Refer to Announcement Battery Age secures highly prospective corridor- Expands Bleiberg Project;
29 January 2025
3.
Refer to Announcement Battery Age Minerals Triples Austrian Footprint along historic High-Grade
Germanium mining corridor; 18 December 2024 & 23 December 2024.
4.
Refer to Bleiberg earn-in terms and structure set out in the Company’s announcement dated 16 May
2024 and Prospectus dated 7 December 2022.
[ENDS]
Release authorised by the Board of Battery Age Minerals Ltd.
Contacts
Investors / Shareholders
Nigel Broomham
Chief Executive Officer
P: +61 (0)8 6109 6689
E: info@batteryage.au
Media
Kelly-Jo Fry
Battery Age Minerals
P: +61 (0)8 6109 6689
E: kjfry@batteryage.au
Compliance Statement
This report contains information on the Bleiberg & Hochobir Projects extracted from an ASX market announcement
dated 8 December 2022, 2 February 2023, 13 July 2023, 26 February 2024, 26 March 2024, 16 May 2024 18
December 2024, 23 December 2024, 22 January 2025, 29 January 2025 and 17 April 2025 released by the
Company and reported in accordance with the 2012 edition of the “Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves” (JORC Code). The original market announcement is available to
view on www.batteryage.au and www.asx.com.au. Battery Age is not aware of any new information or data that
materially affects the information included in the original market announcement.
Forward-Looking Statement
This announcement may contain certain forward-looking statements and projections. Such forward looking
statements/projections are estimates for discussion purposes only and should not be relied upon. Forward looking
statements/projections are inherently uncertain and may therefore differ materially from results ultimately achieved.
Battery Age Minerals Limited does not make any representations and provides no warranties concerning the
accuracy of the projections and disclaims any obligation to update or revise any forward-looking statements/projects
based on new information, future events or otherwise except to the extent required by applicable laws. While the
information contained in this report has been prepared in good faith, neither Battery Age Minerals Limited or any of
its directors, officers, agents, employees or advisors give any representation or warranty, express or implied, as to
the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this
announcement.
ASX Announcement
Released 6 June 2025
4
Share your feedback
Discover