Strong Lithium Mineralisation Intercepted at Falcon Lake
Released
Released
Announcement PDF
ASX Announcement
Released 26 July 2023
Wide zones of strong lithium mineralisation
intercepted near surface in first holes at
Falcon Lake
Maiden drill campaign off to a positive start with expedited assays returning
multiple +20m high grade intercepts and continued visual intercepts of
mineralised pegmatites.
Highlights
• Expedited assay results received from the maiden drill program at Falcon Lake,
confirming significant shallow lithium mineralisation in the first four holes.
• Significant intercepts include:
o 27.6 metres @ 1.37% Li2O from 16.65m down-hole
▪ With internal highs of 15m @ 1.65% Li2O (23FL-001)
o 21.92 metres @ 1.44% Li2O from 5.7m down-hole
▪ With internal highs of 15m @ 1.71% Li2O (23FL-004)
o 26 metres @ 1.00% Li2O from 46.3m down-hole1
▪ With internal highs of 4m @ 1.89% Li2O (23FL-005)
o 8.7 metres @ 1.24% Li2O from 7.5m (23FL-002)
▪ With internal highs of 5m @ 1.63% Li2O (23FL-002)
• Results confirm the presence of significant pegmatite-hosted spodumene
mineralisation at Falcon Lake, building on historic intercepts including:
o 24.4 metres @ 1.43% Li2O including 10.9 metres @ 1.95% Li2O (FLDD006).
• 26 holes for 2,693m have been completed to date in the maiden ~5,000 metre drill
programme, with assays pending for 17 holes.
• Visual mineralisation2 has been observed in 22 of the 26 holes drilled to date with
mineralised estimates up to 25% spodumene content.
Battery Age Minerals Ltd (ASX: BM8; “Battery Age” or “the Company”) is pleased to report
initial assay results have been returned from its maiden drilling campaign at the Falcon Lake
1 Based on first 18m of interval having assays returned (46.3m to 64m downhole) averaging 1.00%. 64m to 76.05m downhole
still awaiting assay – anticipated in coming weeks.
2 In relation to the disclosure of visual mineralisation, the Company cautions that visual estimates of mineral abundance should
never be considered a proxy or substitute for laboratory analysis. The reported intersections are down hole measurements and
are not necessarily true width. Descriptions of the mineral amounts seen and logged in the core are qualitative, visual estimates
only. Refer to Cautionary Note – Visual Estimates
Battery Age Minerals Ltd
ASX: BM8
ACN 085 905 997
batteryageminerals.au
T: +61 (8) 6109 6689
E: info@batteryage.au
Level 50, 108 St Georges Terrace
Perth, WA 6000
PO Box 7310, Cloisters Square Po, WA 6850
1
Lithium Project in Ontario, Canada. The initial batch of assays have confirmed significant
shallow mineralisation across the first four holes that have been laboratory tested.
These holes all intersected significant widths and grades of spodumene mineralisation at
Falcon Lake, validating previously reported visual observations as announced on the 4th of
July.
All holes for which laboratory assays have been returned contain significant lithium
mineralisation with composite highs of 1.44% Li2O over 21.92m in hole 23FL-004 and
internal highs of up to 1.89% Li2O in hole 23FL-005.
Figure 1 – 23FL-001 Core Box 27.6m @ 1.37% Li2O
The Company has also continued to have success in its drilling campaign with a further 12
holes beyond those reported in ASX Announcement “Spodumene bearing pegmatites up to
27.6m in width intersected from surface at Falcon Lake” reported on the 4th of July intersecting
mineralised pegmatites with visual mineralisation estimates ranging from 5% to 25%.
Drilling continues in Falcon West as the Company continues to determine scale and
geometry of ore bodies in this area.
Battery Age CEO Gerard O’Donovan commented:
“We are delighted with the results from the first batch of diamond holes at Falcon Lake. These
results confirm that we have significant mineralisation across a number of holes. Coupled with
these assays, our subsequent holes have continued to intersect mineralisation with visible
ASX Announcement
Released 26 July 2023
2
spodumene of varying percentages. We look forward to sending these to the lab for testing to
verify the level of mineralisation.”
“The maiden drilling represents the first step in a phased approach at Falcon Lake and it is
fantastic to have generated some outstanding results to begin with. The second phase which
will run in parallel to drilling includes our field exploration campaign. This will commence in the
near term, and we are confident it will generate more high-priority targets for the drill rig as we
move across the property”.
“Based on these results, we will consider an expansion of the maiden program beyond initial
planned metres to ensure we progress the project at pace.”
Phase 1: Diamond Drilling & Mineralisation Definition
Initial assay results have been received for the first four holes as part of the maiden ~5,000m
diamond drill program at Falcon Lake. This program has been designed to test the known
pegmatites and provide critical structural information to the exploration team to allow the
ongoing exploration program to be further optimised.
Significant assay results returned to date are included in the table below:
Hole
23FL-001
23FL-002
23FL-002
23FL-004
23FL-005
From_m
16.65
7.50
62.00
5.70
46.30
To_m
44.25
16.20
86.00
27.62
72.30
Interval_m
27.6
8.7
24.0
21.9
26.0
Li2O (%)
1.37
1.24
0.32
1.44
1.00
Table 1 - Assay results from Falcon Lake, Intervals are down hole length, true width not known.
The results to date confirm the potential for Falcon Like to host significant mineralisation with
assay grades of up to 2.713% Li2O returned (23FL-001, sample F005569).
ASX Announcement
Released 26 July 2023
3
Figure 2 - Cross Section 1 showing 23FL- 001 to 003
Figure 3 - Cross Section 2 showing 23FL- 004 to 006
ASX Announcement
Released 26 July 2023
4
Further to the Company’s announcement on the 4th of July, drilling has continued with
mineralised intercepts logged in a further 12 holes. Visual observations of mineralisation
have been estimated up to 25% and are detailed below in Appendix 1
Table 3. This continued success demonstrates the fertility of the area for spodumene bearing
pegmatites.
Figure 4 – Drill Collar Location Map
ASX Announcement
Released 26 July 2023
5
Figure 5 - 23FL-024 Core Box showing mineralised pegmatites visually estimated up to 25%
To date, 26 holes for 2,693m have been drilled with assays pending for 17 holes.
It is expected that assays for subsequent holes will be available within 4-6 weeks in
accordance with expected turnaround timeframes from the laboratory.
Based on information gathered to date, management is now considering an expansion of the
maiden drilling programme beyond current planned metres to further evaluate the property
and accelerate works.
Phase 2: Summer Exploration Fieldwork.
In conjunction with its maiden drill program, the Company plans to commence its summer
field work programme which represents Phase 2 of its exploration campaign, in the coming
weeks. This includes:
1. Prospecting & Mapping
2. Geochemical Surveys
3. Geophysical Surveys
4. Mechanised Stripping targeting high priority areas for exposure of pegmatites
5. Regional Property Exploration (outside of Falcon Main) Exploration works.
The completion of these works is expected to further define high priority targets for the
continued drill program as the Company further tests the highly prospective nature of Falcon
Lake.
[ENDS]
ASX Announcement
Released 26 July 2023
6
Release authorised by the Board of Battery Age Minerals Ltd.
Contacts
Investors / Shareholders
Gerard O’Donovan
Chief Executive Officer
P: +61 (0)8 6109 6689
E: info@batteryage.au
Media
Nicholas Read – Read Corporate
P: +61 (0)8 9388-1474 / (0419) 929 046
E: nicholas@readcorporate.com.au
Cautionary Statement – Visual Estimates
This announcement contains references to visual results and visual estimates of mineralisation. The Company
draws attention to uncertainty in reporting visual results. Visual estimates of mineral abundance should never be
considered a proxy or substitute for laboratory analyses where concentrations or grades are the factor of principal
economic interest. Visual estimates also potentially provide no information regarding impurities or deleterious
physical properties relevant to valuations.
Competent Person Statement
The information in this Report that relates to Geological Data and Exploration Results for the Falcon Lake Lithium
Project is based on, and fairly represents, information and supporting documentation compiled and reviewed by Mr
Nigel Broomham (BSc (Hons) Geology & Resource Economics) who is a Member of the Australasian Institute of
Mining and Metallurgy (AusIMM) and holds a Professional Certificate in JORC Code Reporting. Mr Broomham is
the General Manager – Exploration of Battery Age Minerals. Mr Broomham has sufficient experience which is
relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is
undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Joint Ore Reserves Committee
(JORC) "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr
Broomham consents to the inclusion in this report of the matters based on information in the form and context in
which they appear. Mr Broomham holds securities in the Company. This announcement contains information
regarding the Falcon Lake Lithium Project extracted from ASX market announcement dated 4 July 2023 and 7
December 2022 and reported in accordance with the 2012 JORC Code and available for viewing at
batteryageminerals.au. The Company confirms that it is not aware of any new information or data that materially
affects the information included in any original announcement and that all material assumptions and technical
parameters underpinning the estimates in the original market announcement continue to apply and have not
materially changed.
Forward-Looking Statement
This announcement may contain certain forward-looking statements and projections. Such forward looking
statements/projections are estimates for discussion purposes only and should not be relied upon. Forward looking
statements/projections are inherently uncertain and may therefore differ materially from results ultimately achieved.
Battery Age Minerals Limited does not make any representations and provides no warranties concerning the
accuracy of the projections and disclaims any obligation to update or revise any forward-looking statements/projects
based on new information, future events or otherwise except to the extent required by applicable laws. While the
information contained in this report has been prepared in good faith, neither Battery Age Minerals Limited or any of
its directors, officers, agents, employees or advisors give any representation or warranty, express or implied, as to
the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this
announcement.
ASX Announcement
Released 26 July 2023
7
Appendix 1 – Drill Collar Positions & Mineralised Intercepts
Hole
23FL-001
23FL-002
23FL-003
23FL-004
23FL-005
23FL-006
23FL-007
23FL-008
23FL-009
23FL-010
23FL-011
23FL-012
23FL-013
23FL-014
23FL-015
23FL-016
23FL-017
23FL-018
23FL-020
23FL-021
23FL-022
23FL-023
23FL-024
23FL-025
23FL-026
23FL-029
23FL-030
Length_m
56
125
122
44
101
145
50
101
140
41
122
53
101
140
305
140
41
86
92
101
41
110
77
95
89
74
50
UTM_Grid
UTM_East UTM_North UTM_Elevation Azimuth Dip
Hole_Status
NAD83_Z16N 418403.3
5591981
359
300
60 Completed
NAD83_Z16N 418363.7
5592004.3
360
300
-60 Completed
NAD83_Z16N 418434.4
5591962.6
359
300
-60 Completed
NAD83_Z16N 418391.8
5592037.4
363
300
-60 Completed
NAD83_Z16N 418430.2
5592021.9
361
300
-60 Completed
NAD83_Z16N 418473.8
5591997.4
360
300
-60 Completed
NAD83_Z16N 418337.6
5591959.3
358
300
-60 Completed
NAD83_Z16N 418381.2
5591934.7
359
300
-60 Completed
NAD83_Z16N 418424.7
5591910.2
361
300
-60 Completed
NAD83_Z16N 418416.1
5592069.5
362
300
-60 Completed
NAD83_Z16N 418476.5
5592053.2
362
300
-60 Completed
NAD83_Z16N 418313.1
5591915.7
359
300
-60 Completed
NAD83_Z16N 418356.6
5591891.2
361
300
-60 Completed
NAD83_Z16N 418400.2
5591866.6
362
300
-60 Completed
NAD83_Z16N
418440
5591987.7
356
300
-80 Completed
NAD83_Z16N 418443.8
5591842.1
361
300
-60 Completed
NAD83_Z16N
418350
5591981.1
357
300
-60 Completed
NAD83_Z16N 418393.5
5591956.5
354
300
-60 Completed
NAD83_Z16N 418396.4
5592012.3
355
300
-60 Completed
NAD83_Z16N
418440
5591987.7
356
300
-60 Completed
NAD83_Z16N
418399
5592068.2
361
300
-60 Completed
NAD83_Z16N 418442.5
5592043.7
364
300
-60 Completed
NAD83_Z16N 418347.1
5591925.3
358
300
-60 Completed
NAD83_Z16N 418390.6
5591900.7
358
300
-60 Completed
NAD83_Z16N 418434.4
5591876
362
300
-60 Completed
NAD83_Z16N 418420.4
5592056.1
361
300
-60 Completed
NAD83_Z16N
418397
5592051.9
361
300
-60 Completed
Table 2 - Drill Collar Details
ASX Announcement
Released 26 July 2023
8
Hole
23FL-003
23FL-003
23FL-003
23FL-005
23FL-007
23FL-007
23FL-007
23FL-008
23FL-008
23FL-008
23FL-008
23FL-011
23FL-013
23FL-014
23FL-016
23FL-017
23FL-017
23FL-018
23FL-018
23FL-018
23FL-018
23FL-020
23FL-021
23FL-021
23FL-023
23FL-023
23FL-024
23FL-024
23FL-024
23FL-024
23FL-024
23FL-024
23FL-025
23FL-025
23FL-029
23FL-030
From_m
40.18
56.53
59.58
72.3
9.05
12.88
29
23.35
29.8
39.43
72.3
110.6
38.3
13.38
50.33
14.3
23.2
3.6
13.75
55.4
69.5
22.05
46.52
66.02
56.05
93.24
5.4
26.8
37.8
47.3
51.5
67.25
65.15
78.95
30.94
3.7
To_m
43.62
59.1
60.85
76.05
12.22
15.64
32.52
26.05
32.5
47.28
77.88
111.85
40.25
14.95
52.81
19.1
29.09
12.25
19.8
63.6
80.05
33.5
48.37
76.16
63.21
94.43
18.75
30.35
39.6
50.4
53.45
68.66
72.35
80.65
32.9
18.4
Interval
3.44
2.57
1.27
3.75
3.17
2.76
3.52
2.70
2.70
7.85
5.58
1.25
1.95
1.57
2.48
4.80
5.89
8.65
6.05
8.20
10.55
11.45
1.85
10.14
7.16
1.19
13.35
3.55
1.80
3.10
1.95
1.41
7.20
1.70
1.96
14.70
Spd_%
15
15
15
5
5
5
25
15
20
25
15
5
15
20
20
20
25
25
20
25
15
10
15
20
25
5
25
20
10
20
10
5
20
15
0.5
20
Table 3 – Mineralised Intervals above 1m. Intervals are down hole length, true width not known. Spodumene %
are based on visual estimates.1
ASX Announcement
Released 26 July 2023
9
Appendix 2 – JORC CODE, 2012 EDITION – TABLE 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
Sampling
techniques
JORC Code explanation
• Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
• Aspects of the determination of
mineralisation that are Material to the Public
Report.
• In cases where ‘industry standard’ work has
been done this would be relatively simple
(eg ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation
may be required, such as where there is
coarse gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (eg submarine nodules)
may warrant disclosure of detailed
information.
Drilling
techniques
• Drill type (eg core, reverse circulation, openhole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
• Method of recording and assessing core and
chip sample recoveries and results
assessed.
• Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
• Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
• Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
Drill sample
recovery
Logging
ASX Announcement
Released 26 July 2023
Commentary
• All diamond drill core is NQ
(76mm) in this drilling
program.
• Diamond core sample
intervals are logged for
lithology, structural and
geotechnical information,
measured, photographed,
and placed into numbered
trays prior to sampling.
• Core has been sampled on
nominal ~1m intervals (0.80
– 1.20m) where possible
unless geological boundaries
dictate otherwise.
• Geological boundaries have
not been crossed by sample
intervals.
• ½ core samples have been
split by core saw, collected,
and submitted for analysis to
AGAT Laboratories along
with regular duplicates,
standards and blanks in line
with QAQC procedures.
• The same side of the core is
always sampled in-line with
procedure.
• All holes are NQ diamond
drill holes.
• A Gyro based system has
been used for both rig
alignment and downhole
measurements on all holes.
• All core is depth marked and
oriented to check against
drillers measurements
(blocks), ensuring that all
core loss is considered.
Diamond core recovery is
recorded into the database.
• No significant core loss has
been observed to date.
• All drill cores have been
geologically logged.
• Geological logging is
completed for all holes, and it
10
metallurgical studies.
• Whether logging is qualitative or quantitative
in nature. Core (or costean, channel, etc)
photography.
• The total length and percentage of the
relevant intersections logged.
is representative.
• The lithology, alteration,
geotechnical and structural
characteristics of drill
samples are logged following
standard procedures and
using standardised
geological codes.
• Logging is both qualitative
and quantitative depending
on field being logged.
• All drill-holes are logged in
full.
• All drill core are digitally
photographed and stored.
• All core has been cut and
sampled at the core
processing facility in
Armstrong, Ontario.
• NQ core was split by saw in
half, always using the same
half for sampling purposes.
• Duplicate sampling is carried
out routinely throughout the
drilling campaign in line with
QAQC procedure. The
laboratory will carry out
routine internal repeat
assays on crushed samples.
• Considering the grain size,
half core NQ samples are
believed to be a
representative of the sample.
Subsampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether
quarter, half or all core taken.
• If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the sampling
is representative of the in situ material
collected, including for instance results for
field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the
grain size of the material being sampled.
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied
and their derivation, etc.
• Nature of quality control procedures adopted
(eg standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (ie lack of bias) and
precision have been established.
•
• The verification of significant intersections by
either independent or alternative company
personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
•
Verification
of sampling
and
assaying
ASX Announcement
Released 26 July 2023
•
•
•
•
Samples have been
submitted to AGAT
laboratories.
AGAT is an internationally
certified independent
service provider. Industry
standard assay quality
control techniques will be
used for lithium related
elements.
Samples are submitted for
multi-element ICP analysis
Sodium Peroxide Fusion is
used followed by combined
ICP-OES and ICP-MS
analyses (58 elements).
No verification of sampling
and assaying have been
completed by BM8 to date.
Selected sample results
which are considered to be
significant will be subjected
11
Location of
data points
(physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
•
•
•
•
Sample
security
• Data spacing for reporting of Exploration
Results.
• Whether the data spacing and distribution is
sufficient to establish the degree of
geological and grade continuity appropriate
for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications
applied.
• Whether sample compositing has been
applied.
• Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
• If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
• The measures taken to ensure sample
security.
Audits or
reviews
• The results of any audits or reviews of
sampling techniques and data.
Data spacing
and
distribution
Orientation
of data in
relation to
geological
structure
•
to resampling by the
company in the future.
The drill hole collar positions
in table 1 have been located
by handheld GPS.
On completion of drilling
program, collar positions will
be located by digital GPS
and reports updated
accordingly.
The grid datum is NAD83
Zone 16N.
Downhole surveys have
been collected every 30m
utilizing gyro tool.
This is a preliminary drilling
campaign and therefore
suitable spacing and
distribution to establish the
degree of geological and
grade continuity appropriate
for the Mineral Resource and
Ore Reserve estimation is
yet to be determined.
• Drilling has been in order to
sample across the strike of
the mineralisation, based on
surface mapping and limited
historical drilling. However,
as this drilling is preliminary,
further drilling is required to
determine the orientation of
mineralisation in this area.
• At all times samples were in
the custody and control of
the Company’s
representatives until delivery
to the laboratory where
samples are held in a secure
enclosure pending
processing.
• No external audit has been
undertaken at this stage.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
Mineral
tenement
and land
tenure status
JORC Code explanation
• Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint
ventures, partnerships, overriding royalties,
native title interests, historical sites,
ASX Announcement
Released 26 July 2023
•
Commentary
All claims relating to the
Falcon Lake Lithium Project
minerals claims are in good
standing and are 90%
owned by the company.
12
wilderness or national park and
environmental settings.
• The security of the tenure held at the time of
reporting along with any known impediments
to obtaining a licence to operate in the area.
Exploration
done by
other parties
• Acknowledgment and appraisal of
exploration by other parties.
•
•
•
•
•
•
Geology
• Deposit type, geological setting and style of
mineralisation.
Drill hole
Information
• A summary of all information material to the
understanding of the exploration results
including a tabulation of the following
information for all Material drill holes:
o easting and northing of the drill hole
collar
o elevation or RL (Reduced Level –
elevation above sea level in metres) of
the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified
on the basis that the information is not
ASX Announcement
Released 26 July 2023
Please refer to the company
prospectus (dated 2nd Feb
2023) Annexure A, Table
3:1 for full table of Falcon
Lake mineral claims.
No known impediments.
British Canadian Lithium
Mines Ltd (“BCLM”)
completed diamond drill (DD)
holes in 1956. No core or
collars have been located.
Canadian Ore Bodies
completed 3 DD holes in
2010.
Argonaut Resources NL
drilled six holes in 2016.
Core and collars have been
located.
A summary of historical
exploration activities is
included in the Independent
Geologists Report within the
Company’s Prospectus
(dated 2nd Feb 2023)
Annexure A.
• The Falcon Lake Project is
underlain by Archean
supracrustal and plutonic
rocks of the Eastern
Wabigoon Sub-province of
the Superior Province along
the northern edge of Lake
Nipigon
• The Falcon Lake Pegmatite
Group consists of several
pegmatite dykes that intrude
amphibolitised mafic metavolcanic rocks.
• These pegmatites are
spodumene-subtype and are
tantalum-rich.
• All drill hole collar locations
and mineralised intercepts
have been reported in this
report for all holes
completed to date.
• No relevant data has been
excluded from this report.
13
Data
aggregation
methods
•
•
•
Relationship
between
mineralisatio
n widths and
intercept
lengths
•
•
•
Diagrams
•
Balanced
reporting
•
Other
substantive
exploration
data
Further work
Material and this exclusion does not detract
from the understanding of the report, the
Competent Person should clearly explain
why this is the case.
In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (eg cutting of
high grades) and cut-off grades are usually
Material and should be stated.
Where aggregate intercepts incorporate
short lengths of high grade results and
longer lengths of low grade results, the
procedure used for such aggregation should
be stated and some typical examples of
such aggregations should be shown in
detail.
The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
These relationships are particularly
important in the reporting of Exploration
Results.
If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
If it is not known and only the down hole
lengths are reported, there should be a clear
statement to this effect (eg ‘down hole
length, true width not known’).
Appropriate maps and sections (with scales)
and tabulations of intercepts should be
included for any significant discovery being
reported These should include, but not be
limited to a plan view of drill hole collar
locations and appropriate sectional views.
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
• Other exploration data, if meaningful and
material, should be reported including (but
not limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples – size and
method of treatment; metallurgical test
results; bulk density, groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
substances.
• The nature and scale of planned further
work (eg tests for lateral extensions or depth
extensions or large-scale step-out drilling).
ASX Announcement
Released 26 July 2023
• No low-cut has been applied
to reported intercept assay
values.
• Intercept grades have been
calculated by weighted
average.
• Internal highs have been
calculated by selecting the
relatively higher-grade
internal zone when
compared to the entire
intercept. These zones are
continuous downhole.
• No metal equivalent values
are reported.
• Only downhole lengths are
reported.
• The exact geometry of the
mineralisation is not known
as such true width is not
known.
• Appropriate plan views are
included.
• Appropriate x-sections have
been included.
•
•
All collar and mineralisation
information have been
included for drill holes
completed to date.
All returned assays have
been reported by average
intercept grades.
•
All previous exploration data
completed to date have
been reported within the
Independent Geologists
Report within the
Company’s Prospectus
(dated 2nd Feb 2023).
• No other substantive
exploration data is available
at this time.
• Further work planned at
Falcon Lake Lithium Project
includes exploration drilling,
14
• Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
ASX Announcement
Released 26 July 2023
field mapping, geochemistry,
geophysics and prospecting
works.
15
Share your feedback
Discover